{ "reference": [ { "keyword": "P3", "context": "ding Block (B3) Code, Minimum Lot Sizes in P2 and P3; and move to include on the March 11, 2025 Consen" }, { "keyword": "P3", "context": "lock (B3) Code, Build-to-Line standards in P2 and P3, and adopting a First Layer Setback in P2 and P3;" }, { "keyword": "P3", "context": " P3, and adopting a First Layer Setback in P2 and P3; and move to include on the March 11, 2025 Consen" }, { "keyword": "P3", "context": "a Conditional Use Permit to construct duplexes in P3: and move to include on the March 11, 2025 Consen" }, { "keyword": "P3", "context": " duplexes as an allowable building type in P2 and P3 and move to include on the March 11, 2025, Consen" } ] }