{ "reference": [ { "keyword": "DBF", "context": "used interchangeably throughout this document. D. DBF refers to Design Build Firm. M D DR A. Items of m" }, { "keyword": "DBF", "context": "ings and not in the Technical Specifications. The DBF shall provide such items in accordance with the G" }, { "keyword": "DBF", "context": " R RD DR A. After completion of construction, the DBF shall provide two sets of As-Built Drawings with " }, { "keyword": "DBF", "context": "recording work shall be the responsibility of the DBF. The As-Built utility information shall meet the " }, { "keyword": "DBF", "context": "t worthy of salvaging shall be disposed of by the DBF at a suitable location in accordance with all app" }, { "keyword": "DBF", "context": "d laws at no additional cost to theCITY. R A. The DBF shall furnish and pay for all electrical power re" }, { "keyword": "DBF", "context": "hall be furnished by the CITY and paid for by the DBF. The purchase price shall be the prevailing rate " }, { "keyword": "DBF", "context": " the start and at the finish of construction. The DBF shall make all arrangements and incur all expense" }, { "keyword": "DBF", "context": " and the local administrative authority. M A. The DBF shall fully cooperate at all times with the CITY " }, { "keyword": "DBF", "context": "on possible. The schedule, plans, and work of the DBF shall at all times be subject to alteration and r" }, { "keyword": "DBF", "context": "water and/or sewer system. In all cases where the DBF must cause an interruption, DBF shall prepare and" }, { "keyword": "DBF", "context": "l cases where the DBF must cause an interruption, DBF shall prepare and submit to the CITY four (4) wor" }, { "keyword": "DBF", "context": "the proposed procedure and a time schedule, which DBF will be required to guarantee. At least forty-eig" }, { "keyword": "DBF", "context": "d for starting the work, the CITY will notify the DBF whether or not the work will be permitted aspropo" }, { "keyword": "DBF", "context": "ed. 1. The CITY reserves the right to require the DBF to work 24 hours per day in all cases where, in C" }, { "keyword": "DBF", "context": "s or offensive conditions. 2. In no case will the DBF be permitted to interfere with the existing syste" }, { "keyword": "DBF", "context": "interference with the existing system. R R A. The DBF shall remove all excess material and shall clean " }, { "keyword": "DBF", "context": "ty within 30 days after being disturbed. R A. The DBF shall provide temporary facilities at the site as" }, { "keyword": "DBF", "context": "ost of these tests shall be the obligation of the DBF, and no extra charge shall be made to the CITY on" }, { "keyword": "DBF", "context": "conformity with the TECHNICAL SPECIFICATIONS. The DBF shall supply the necessary samples for this testi" }, { "keyword": "DBF", "context": "ost of the tests that fail will be charged to the DBF by deducting the cost from the Contract price or " }, { "keyword": "DBF", "context": "be paid directly to the testing laboratory by the DBF. C. Construction in areas where installation and " }, { "keyword": "DBF", "context": "y require testing to demonstrate conformance. The DBF shall ascertain the extent of testing required by" }, { "keyword": "DBF", "context": "ed by regulatory agencies within these areas. The DBF is responsible for performing such tests, includi" }, { "keyword": "DBF", "context": "ts for these tests shall be the obligation of the DBF and no extra charge shall be made to the CITY on " }, { "keyword": "DBF", "context": "ribed in Paragraph 1.17, this Section. X M A. The DBF shall perform all work necessary to locate, excav" }, { "keyword": "DBF", "context": "ngs unit price. B. Additional valves used for the DBF's convenience shall not be considered as an extra" }, { "keyword": "DBF", "context": "i.e., installation, testing and restoration), the DBF shall ensure at all times the safe operation of t" }, { "keyword": "DBF", "context": "terference and interruption as possible. R A. The DBF shall be responsible for the coordination and/or " }, { "keyword": "DBF", "context": "le; however, it will be the responsibility of the DBF to preserve all existing utilities whether shown " }, { "keyword": "DBF", "context": "g utilities whether shown on the Drawings or not. DBF is directed to pothole ahead of utility installat" }, { "keyword": "DBF", "context": "ties. If utility conflicts are encountered by the DBF during construction, DBF shall give sufficient no" }, { "keyword": "DBF", "context": "s are encountered by the DBF during construction, DBF shall give sufficient notice to their owners so t" }, { "keyword": "DBF", "context": "CITY is caused by carelessness on the part of the DBF shall be repaired at the expense of the DBF. R A." }, { "keyword": "DBF", "context": "f the DBF shall be repaired at the expense of the DBF. R A. The DBF shall guarantee the equipment, mate" }, { "keyword": "DBF", "context": "l be repaired at the expense of the DBF. R A. The DBF shall guarantee the equipment, material and labor" }, { "keyword": "DBF", "context": "\u0012 406 SECTION 01005 TECHNICAL PROVISIONS . B. The DBF shall also obtain warranties from manufacturers f" }, { "keyword": "DBF", "context": " of written acceptance by the CITY. R RM R A. The DBF shall provide all personnel and equipment require" }, { "keyword": "DBF", "context": "all work specified herein and on the Drawings. B. DBF shall provide forty-eight (48) hours advance writ" }, { "keyword": "DBF", "context": "dvance written notice to the CITY for approval of DBF\u2019S intention to work overtime on weekdays or to wo" }, { "keyword": "DBF", "context": " weekdays or to work on the weekends. RR D A. The DBF shall be responsible for the furnishing and maint" }, { "keyword": "DBF", "context": "g any permits, shall be the responsibility of the DBF. B. All work in public rights-of-way and on priva" }, { "keyword": "DBF", "context": "vide protection to the workers and residents, the DBF shall maintain emergency access to all adjacent p" }, { "keyword": "DBF", "context": "perties for a distance that exceeds 150 feet, the DBF shall provide a 10-foot-wide stabilized access wa" }, { "keyword": "DBF", "context": "he trench capable of supporting a Fire Truck. The DBF shall also provide stabilized access ways across " }, { "keyword": "DBF", "context": "ten permission from the CITY, and it shall be the DBF\u2019S responsibility to provide proper protection of " }, { "keyword": "DBF", "context": "quired by the regulatory agency. In addition, the DBF shall provide a security guard at the site whenev" }, { "keyword": "DBF", "context": "provide a security guard at the site whenever the DBF\u2019S personnel are not present, 24 hours per day/ 7 " }, { "keyword": "DBF", "context": "n at all times. In addition to this provision the DBF shall maintain trench safety and comply with curr" }, { "keyword": "DBF", "context": "t OSHA regulations and the Trench Safety Act. The DBF shall maintain and keep all safety barricades, si" }, { "keyword": "DBF", "context": "lization as named in the Bid Schedule. D R A. The DBF shall be aware that there may be contaminated sit" }, { "keyword": "DBF", "context": "ewatering and dewatering permit requirements. The DBF will be responsible for all costs associated with" }, { "keyword": "DBF", "context": " operated in a static mode only. R R D M M A. The DBF shall keep the CITY informed of any damage claims" }, { "keyword": "DBF", "context": "TY informed of any damage claims made against the DBF during the construction period. All claims for au" }, { "keyword": "DBF", "context": "be reported within 24 hours of receipt of notice. DBF will conduct a timely investigation of the claim " }, { "keyword": "DBF", "context": "e claim and/or report to their insurance carrier. DBF will advise the CITY in writing of their decision" }, { "keyword": "DBF", "context": "ewer force main replacement project. As such, the DBF will have close contact with the community. The D" }, { "keyword": "DBF", "context": "F will have close contact with the community. The DBF shall notify the CITY of any and all community co" }, { "keyword": "DBF", "context": "all community concerns or claims arising from the DBF\u2019s operations. The claims referenced herein are ex" }, { "keyword": "DBF", "context": "f the WORK in good faith shall be provided by the DBF as though originally so indicated, at no increase" }, { "keyword": "DBF", "context": "nse as described in Volume 1 of this document. B. DBF shall have past experience with large scale utili" }, { "keyword": "DBF", "context": "to the above Specifications and Standards. A. The DBF, by virtue of signing the Contract, acknowledges " }, { "keyword": "DBF", "context": "virtue of signing the Contract, acknowledges that DBF and all subcontractors have satisfied themselves " }, { "keyword": "DBF", "context": "rformance of the work. Failure on the part of the DBF to completely or properly evaluate the site condi" }, { "keyword": "DBF", "context": " these contract documents will be provided to the DBF for reference. The DBF, by virtue of signing the " }, { "keyword": "DBF", "context": "ts will be provided to the DBF for reference. The DBF, by virtue of signing the Contract, acknowledges " }, { "keyword": "DBF", "context": "virtue of signing the Contract, acknowledges that DBF and subcontractors are responsible for investigat" }, { "keyword": "DBF", "context": "t site. No additional payment will be made to the DBF because of differences between actual conditions " }, { "keyword": "DBF", "context": " R R A. Concurrent Work by Other CONTRACTORS. The DBF'S attention is directed to the fact that other CO" }, { "keyword": "DBF", "context": " performance of the WORK under this Contract. The DBF shall conduct its operations so as to cause littl" }, { "keyword": "DBF", "context": "acts. B. Interference with Work On Utilities. The DBF shall cooperate fully with all utility forces of " }, { "keyword": "DBF", "context": "ing, or other rearranging of facilities. R A. The DBF shall schedule and perform the work in such a man" }, { "keyword": "DBF", "context": "and telephone. Prior to commencing with the WORK, DBF shall perform a location investigation of existin" }, { "keyword": "DBF", "context": "ve obtained all required permits and permissions, DBF shall also deliver written notice to the CITY and" }, { "keyword": "DBF", "context": "cessary to sequence portions of this project. The DBF shall be responsible to coordinate construction a" }, { "keyword": "DBF", "context": "nsible to coordinate construction activities with DBF of adjacent phases and sections. R D A. Time is o" }, { "keyword": "DBF", "context": " this project. Because time is of the essence the DBF shall commit the necessary resources to this proj" }, { "keyword": "DBF", "context": "vertime, etc. Because time is of the essence, the DBF'S construction progress will be monitored closely" }, { "keyword": "DBF", "context": "d with the construction schedule submitted by the DBF. If the CITY determines that the DBF does not mee" }, { "keyword": "DBF", "context": "itted by the DBF. If the CITY determines that the DBF does not meet the construction schedule, the DBF " }, { "keyword": "DBF", "context": " DBF does not meet the construction schedule, the DBF will be required to commit those resources necess" }, { "keyword": "DBF", "context": "te the work in timely manner will be borne by the DBF at no additional cost to the OWNER. B. SCHEDULE 1" }, { "keyword": "DBF", "context": "t no additional cost to the OWNER. B. SCHEDULE 1. DBF shall submit scheduling information for the work " }, { "keyword": "DBF", "context": "d/or revision of the schedule. M R M A. It is the DBF'S responsibility to provide clear and convincing " }, { "keyword": "DBF", "context": "n no contract time extension will be granted. The DBF is obligated to provide documentation to the CITY" }, { "keyword": "DBF", "context": "is contract is a calendar day contract. While the DBF may be granted time to suspend work operations fo" }, { "keyword": "DBF", "context": "me will not be suspended. During suspensions, the DBF shall be responsible for all maintenance of traff" }, { "keyword": "DBF", "context": "ditional compensation from the CITY. D R M A. The DBF's use of the project site shall be limited to its" }, { "keyword": "DBF", "context": "ll be limited to its construction operations. The DBF will arrange for storage of materials. A copy of " }, { "keyword": "DBF", "context": "truction Work Conference will be held between the DBF, the CITY, other interested Agencies, representat" }, { "keyword": "DBF", "context": "ill set the time and place of this conference.The DBF shall bring to the conference a copy of the propo" }, { "keyword": "DBF", "context": "e location and the depicted size. It shall be the DBF'S responsibility to identify and locate all under" }, { "keyword": "DBF", "context": "roject. No additional payment will be made to the DBF because of discrepancies in actual and plan locat" }, { "keyword": "DBF", "context": " and damages suffered as a result thereof. B. The DBF shall notify each utility company involved at lea" }, { "keyword": "DBF", "context": "h or endangered by the proposed construction. The DBF shall pay for relocation of water mains or other " }, { "keyword": "DBF", "context": "ins or other utilities for the convenience of the DBF. The DBF shall pay for all charges by utility com" }, { "keyword": "DBF", "context": "her utilities for the convenience of the DBF. The DBF shall pay for all charges by utility companies fo" }, { "keyword": "DBF", "context": "avoid conflict shall be the responsibility of the DBF and the utility companyinvolved. C. The DBF shall" }, { "keyword": "DBF", "context": "f the DBF and the utility companyinvolved. C. The DBF shall schedule and coordinate their work in such " }, { "keyword": "DBF", "context": "ir utilities. No compensation will be paid to the DBF for any loss of time or delay. D. All overhead, s" }, { "keyword": "DBF", "context": "ide parties to make repairs at the expense of the DBF. All repairs made by the DBF are to be made to th" }, { "keyword": "DBF", "context": "t the expense of the DBF. All repairs made by the DBF are to be made to the satisfaction of the utility" }, { "keyword": "DBF", "context": "ntative of the utility owner and the CITY. E. The DBF should be aware of the Sunshine State One Call Ce" }, { "keyword": "DBF", "context": " locator will be dispatched to the work location. DBF shall reasonably notify other utility companies n" }, { "keyword": "DBF", "context": "otified by Sunshine State One Call Center. F. The DBF is responsible for compliance with any and all pe" }, { "keyword": "DBF", "context": "ons can be obtained from the CITYS office. G. The DBF shall obtain construction permit and applicable b" }, { "keyword": "DBF", "context": "\u000f\u0010\u0006 \u0005\u0012 413 SECTION 01010 SUMMARY OF WORK D R D A. DBF shall develop and make all detailed surveys neede" }, { "keyword": "DBF", "context": "pervise this surveying work. R D R R R M M A. The DBF shall carefully protect from disturbance all surv" }, { "keyword": "DBF", "context": "kes and benchmarks, whether or not established by DBF, and shall not remove or destroy any surveying po" }, { "keyword": "DBF", "context": "or survey monuments that have been damaged by the DBF such as section corners, 1/4 section corners, pro" }, { "keyword": "DBF", "context": " or block control points shall be replaced at the DBF'S expense with markers of a size and type approve" }, { "keyword": "DBF", "context": " site, in first-class working condition. R A. The DBF shall furnish, at DBF\u2019s expense, properly zoned a" }, { "keyword": "DBF", "context": "working condition. R A. The DBF shall furnish, at DBF\u2019s expense, properly zoned areas suitable for fiel" }, { "keyword": "DBF", "context": "horization by the agency having jurisdiction. The DBF shall keep these areas in a clean and orderly con" }, { "keyword": "DBF", "context": "at which time it shall become the property of the DBF, who shall dispose of it in a manner satisfactory" }, { "keyword": "DBF", "context": "als shall be disposed of in areas provided by the DBF and approved by the CITY. Any excess material des" }, { "keyword": "DBF", "context": "be retained by the CITY shall be delivered by the DBF to a designated area within a 5-mile radius of th" }, { "keyword": "DBF", "context": " cost to the CITY. D X M R D M A. It shall be the DBF'S responsibility to coordinate and have all adjus" }, { "keyword": "DBF", "context": "ures from the Contract Plans does not relieve the DBF from making such adjustments as may be deemed nec" }, { "keyword": "DBF", "context": " such adjustments as may be deemed necessary. The DBF shall take this provision into account when perso" }, { "keyword": "DBF", "context": "t shall be made for these adjustments. R R A. The DBF shall abide by the following criteria concerning " }, { "keyword": "DBF", "context": "sewer construction and existing utilities. 1. The DBF shall verify the location of all utilities suspec" }, { "keyword": "DBF", "context": "res for these locations and inform the CITY as to DBF\u2019S findings. 2. The CITY shall have full authority" }, { "keyword": "DBF", "context": "lity is to pass through a conflict structure, the DBF shall protect the utility from damage by whatever" }, { "keyword": "DBF", "context": "between pipelines and the structure. R M R A. The DBF shall furnish all labor and equipment and perform" }, { "keyword": "DBF", "context": "ments with no additional cost to the CITY. B. The DBF shall take all steps necessary to protect water q" }, { "keyword": "DBF", "context": " of the owner of the system. This may require the DBF to obtain an engineered plan to be furnished at n" }, { "keyword": "DBF", "context": "\u000e\u0007\u000f\u0010\u0006 \u0005\u0012 415 SECTION 01010 SUMMARY OF WORK A. The DBF shall provide all necessary traffic control devic" }, { "keyword": "DBF", "context": "either original or new asphalt, at all times. The DBF shall make every effort to provide access to driv" }, { "keyword": "DBF", "context": "ll last no longer than five (5) working days. The DBF, with the CITY\u2019s approval, shall coordinate the p" }, { "keyword": "DBF", "context": ", shall coordinate the parking area location. The DBF shall lease the property from the landowner, and " }, { "keyword": "DBF", "context": "ed parking surface acceptable to the CITY. 1) The DBF shall not begin construction on subsequent roadwa" }, { "keyword": "DBF", "context": "ents and property owners shall be notified by the DBF in writing a minimum of two (2) weeks, or earlier" }, { "keyword": "DBF", "context": ". All affected residents shall be notified by the DBF a minimum of forty-eight (48) hours, or earlier i" }, { "keyword": "DBF", "context": ". All affected residents shall be notified by the DBF a minimum of forty-eight (48) hours, or earlier i" }, { "keyword": "DBF", "context": "capped or disabled residents shall be made by the DBF if construction prevents access to homes. h. The " }, { "keyword": "DBF", "context": " if construction prevents access to homes. h. The DBF shall also make provisions with local bus, school" }, { "keyword": "DBF", "context": " prior to installation. B. TRAFFIC CONTROL 1. The DBF is required to submit a conceptual Traffic Contro" }, { "keyword": "DBF", "context": "ould identify the phases of construction that the DBF plans to proceed with and identify traffic flows " }, { "keyword": "DBF", "context": "e. The CITY will have ten (10) days to notify the DBF of any comments. Once the conceptual plan for mai" }, { "keyword": "DBF", "context": "an for maintaining traffic has been approved, the DBF will be required to submit a detailed plan showin" }, { "keyword": "DBF", "context": "ained during the arrival and dismissal of school. DBF shall not block bus access to schools during scho" }, { "keyword": "DBF", "context": "ignated walk route cannot be maintained, then the DBF shall notify the City of Fort Lauderdale and the " }, { "keyword": "DBF", "context": " agency. 5. It shall be the responsibility of the DBF for any necessary Construction, Pavement Marking " }, { "keyword": "DBF", "context": ") days prior to the beginning of construction the DBF shall notify the City of Fort Lauderdale and the " }, { "keyword": "DBF", "context": "4) 484-9600, to set up a pre-work meeting. 7. The DBF, at all times, shall conduct the work in such a m" }, { "keyword": "DBF", "context": "r a safe passageway for traffic at all times. The DBF shall make all necessary arrangements with the CI" }, { "keyword": "DBF", "context": "as been granted to close an existing roadway, the DBF shall furnish and erect signs, barricades, lights" }, { "keyword": "DBF", "context": ", and be subject to the approval of the CITY. The DBF shall furnish and maintain proper protective devi" }, { "keyword": "DBF", "context": "hall be affected one week before closure. 13. The DBF shall furnish a sufficient number of protective d" }, { "keyword": "DBF", "context": "sult in the CITY shutting down the work until the DBF provides the necessary protection. 14. Any time t" }, { "keyword": "DBF", "context": "nt markings (black out) is not permitted. 15. The DBF may be required to reposition existing traffic si" }, { "keyword": "DBF", "context": "d intersections. If this should be necessary, the DBF must submit a plan for approval showing the cours" }, { "keyword": "DBF", "context": "If there are schools within the project area: The DBF will be required to shut down all equipment durin" }, { "keyword": "DBF", "context": "R X DR M A. It shall be the responsibility of the DBF to maintain positive drainage on the surface and " }, { "keyword": "DBF", "context": " the construction of the new drainage system. The DBF shall submit a plan to maintain the existing drai" }, { "keyword": "DBF", "context": "r payment for stored materials may not be made by DBF. D R R R A. It will be the DBF\u2019s responsibility t" }, { "keyword": "DBF", "context": "may not be made by DBF. D R R R A. It will be the DBF\u2019s responsibility to coordinate construction sched" }, { "keyword": "DBF", "context": "CTION 01045 CUTTING AND PATCHING R R R R M D D A. DBF shall be responsible for all cutting, fitting and" }, { "keyword": "DBF", "context": "ich affects: 1. Work of the OWNER or any separate DBF. 2. Structural value of integrity of any element " }, { "keyword": "DBF", "context": "ation. 4. Effect on work of Owner or any separate DBF, or on structural or weatherproof integrity of pr" }, { "keyword": "DBF", "context": "applicable. 8. Written permission of any separate DBF whose work will beaffected. C. Should conditions " }, { "keyword": "DBF", "context": " a change of products from original installation, DBF shall submit request for substitution as specifie" }, { "keyword": "DBF", "context": "EGULATORY REQUIREMENTS & PERMITS R R R R M D D A. DBF shall comply with all building codes and regulati" }, { "keyword": "DBF", "context": "Department of Environmental Protection h. OSHA B. DBF shall comply with these codes, laws, regulations," }, { "keyword": "DBF", "context": "for the design and construction of theproject. C. DBF shall obtain and pay the cost of all building per" }, { "keyword": "DBF", "context": "onnection charges associated with the project. D. DBF is responsible for compliance with all agencies a" }, { "keyword": "DBF", "context": "in permits in addition to those listed below, the DBF shall not have any claim for damages arising from" }, { "keyword": "DBF", "context": " providing any materials or furnishing labor. The DBF shall bid for the most stringentrequirements. D. " }, { "keyword": "DBF", "context": "ll bid for the most stringentrequirements. D. The DBF shall construct the WORK specified herein in acco" }, { "keyword": "DBF", "context": "ION 01090 REFERENCE STANDARDS R R D RD M R A. The DBF is responsible that all work included in the Cont" }, { "keyword": "DBF", "context": "als, unless waived in writing by theOWNER. 1. The DBF may be required to reposition existing traffic si" }, { "keyword": "DBF", "context": "d intersections. If this should be necessary, the DBF must submit a plan for approval showing the cours" }, { "keyword": "DBF", "context": "If there are schools within the project area: The DBF will be required to shut down all equipment durin" }, { "keyword": "DBF", "context": "SECTION 01200 PROJECT MEETINGS . R R R R M D D A. DBF shall schedule and administer a preconstruction m" }, { "keyword": "DBF", "context": "c. Furnish digital copies of minutes to OWNER. B. DBF is to secure a meeting location for progress meet" }, { "keyword": "DBF", "context": "s of the Contract Documents. C. Representative of DBF, subcontractor and suppliers attending meetings s" }, { "keyword": "DBF", "context": " by OWNER\u2019s Representative. C. Attendance: 1. The DBF and its superintendent. 2. ENGINEER 3. Resident P" }, { "keyword": "DBF", "context": "tatives as appropriate. 8. Others as requested by DBF, OWNDER, or Engineer. D. Suggested Agenda: 1. Dis" }, { "keyword": "DBF", "context": "atives as appropriate. 6. Others, as requested by DBF, OWNER, or ENGINEER. E. Suggested Agenda: 1. Revi" }, { "keyword": "DBF", "context": "oduct data, and samples which are prepared by the DBF, Subcontractor, MANUFACTURER, or Supplier and sub" }, { "keyword": "DBF", "context": "r, MANUFACTURER, or Supplier and submitted by the DBF to the CITY as a basis for approval of the use of" }, { "keyword": "DBF", "context": ", tests, technical procedures, technical records, DBF's design analysis and DBF's survey field notes fo" }, { "keyword": "DBF", "context": "res, technical records, DBF's design analysis and DBF's survey field notes for construction staking, be" }, { "keyword": "DBF", "context": "ns. d. Reports as required by Contract describing DBF's means and methods for items such as dewatering," }, { "keyword": "DBF", "context": " rejection by the CITY, and upon request by CITY, DBF shall resubmit conforming documents. If conformin" }, { "keyword": "DBF", "context": "ed as may be necessary to meet such requirements. DBF's (or his Subcontractor's) failure to initially s" }, { "keyword": "DBF", "context": " legibility quality requirements will not relieve DBF (or his Subcontractors) from meeting the required" }, { "keyword": "DBF", "context": "as complete fabrication or erection drawings. The DBF may use a reproduction of the CITY-prepared Drawi" }, { "keyword": "DBF", "context": " the Drawings are revised to show this additional DBF information, the CITY's title block shall be repl" }, { "keyword": "DBF", "context": ", the CITY's title block shall be replaced with a DBF's title block and the CITY's professional seal sh" }, { "keyword": "DBF", "context": "ional seal shall be removed from the Drawing. The DBF shall revise these erection drawings for subseque" }, { "keyword": "DBF", "context": "eted, will appear on all Compliance Submittals of DBF when returned by the CITY. Review status designat" }, { "keyword": "DBF", "context": " and is acceptable for incorporation in the WORK. DBF is to proceed with fabrication or procurement of " }, { "keyword": "DBF", "context": " with all notations and/or corrections indicated. DBF is to proceed with fabrication or procurement of " }, { "keyword": "DBF", "context": "of the Contract Documents exist in the Submittal. DBF is to resubmit revised information responsive to " }, { "keyword": "DBF", "context": "Documents and is disapproved for use in the WORK. DBF is to resubmit Compliance Submittals responsive t" }, { "keyword": "DBF", "context": "ferred until additional information is furnished. DBF is to submit such additional information to permi" }, { "keyword": "DBF", "context": "ivery in time to not cause a delay in the WORK of DBF or his Subcontractors or any other contractors as" }, { "keyword": "DBF", "context": ", and Suppliers shall be submitted to the CITY by DBF in electronic PDF format as indicated below. Afte" }, { "keyword": "DBF", "context": "Subcontractors, Suppliers, and MANUFACTURERS with DBF's approval prior to transmitting them to the CITY" }, { "keyword": "DBF", "context": " approval prior to transmitting them to the CITY. DBF's certification of approval shall constitute a re" }, { "keyword": "DBF", "context": "hall constitute a representation to the CITY that DBF has either determined and verified all quantities" }, { "keyword": "DBF", "context": " such, and electronically transmitted back to the DBF. Upon receipt of this notification from the CITY," }, { "keyword": "DBF", "context": "n receipt of this notification from the CITY, The DBF shall resubmit one (1) conformed electronic copy " }, { "keyword": "DBF", "context": "Submittal at the Site. 2. Copies of the equipment DBF\u2019s erection drawings and other Compliance Submitta" }, { "keyword": "DBF", "context": "lation under this Contract will be transmitted to DBF by the CITY in the final distribution of suchSubm" }, { "keyword": "DBF", "context": "Y will review and return Compliance Submittals to DBF with appropriate notations. Instruction books and" }, { "keyword": "DBF", "context": "eptance of Compliance Submittals will not relieve DBF from his responsibility as stated in the Section " }, { "keyword": "DBF", "context": "s in one (1) manual (as far as is practical). The DBF shall coordinate with the CITY as to how the manu" }, { "keyword": "DBF", "context": "RERS, and Suppliers shall be submitted to CITY by DBF in an electronic PDF file format, unless otherwis" }, { "keyword": "DBF", "context": "Subcontractors, Suppliers, and MANUFACTURERS with DBF's approval prior to transmitting them to the CITY" }, { "keyword": "DBF", "context": " approval prior to transmitting them to the CITY. DBF's certification of approval shall constitute a re" }, { "keyword": "DBF", "context": "hall constitute a representation to the CITY that DBF has either determined and verified all informatio" }, { "keyword": "DBF", "context": "ribution. 2. Test Reports: a. Responsibilities of DBF and CITY regarding tests and inspections of Equip" }, { "keyword": "DBF", "context": "ed: 1) CITY 2) Resident Project Representative 3) DBF 4) MANUFACTURER or supplier C. CITY'S Review: 1. " }, { "keyword": "DBF", "context": "r reviewing resubmittals. 2. CITY will respond to DBF on those Miscellaneous Submittals which indicate " }, { "keyword": "DBF", "context": " \u0005\u0012 439 SECTION 01300 SUBMITTALS A. The CITY, and DBF shall use the internet Web Based Project Construc" }, { "keyword": "DBF", "context": "or change any contractual responsibilities of the DBF. B. The intent of using the Construction Document" }, { "keyword": "DBF", "context": "he responsibility of CITY, Engineer of Record and DBF. E. DBF\u2019s Responsibility: 1. DBF shall be respons" }, { "keyword": "DBF", "context": "nsibility of CITY, Engineer of Record and DBF. E. DBF\u2019s Responsibility: 1. DBF shall be responsible for" }, { "keyword": "DBF", "context": "er of Record and DBF. E. DBF\u2019s Responsibility: 1. DBF shall be responsible for the validity of their in" }, { "keyword": "DBF", "context": "information exchanged and transferred between the DBF and its subcontractors and suppliers on Construct" }, { "keyword": "DBF", "context": "anagement tool shall be the responsibility of the DBF. 3. Accepted users shall be knowledgeable in the " }, { "keyword": "DBF", "context": "nt Format (PDF) document distribution program. 4. DBF shall utilize the existing forms in Construction " }, { "keyword": "DBF", "context": "ist in Construction Document Management tool, the DBF must include a form of their own (subject to revi" }, { "keyword": "DBF", "context": "rather than optically scanned, whenever possible. DBF is responsible for the training of their personne" }, { "keyword": "DBF", "context": " 6. User Access Limitations: a. Provide a list of DBF's key the Construction Document Management tool p" }, { "keyword": "DBF", "context": "form a security check on all potential users. The DBF will be allowed to add additional personnel and s" }, { "keyword": "DBF", "context": "o accepted DBFpersonnel. F. Authorized Users: The DBF shall: 1. Request the User Application form from " }, { "keyword": "DBF", "context": "n or the subsequent communications supersedes the DBF\u2019s obligations and rights for copyright or documen" }, { "keyword": "DBF", "context": "Review comments made (or lack thereof) by CITY on DBF submitted documentation shall not relieve DBF fro" }, { "keyword": "DBF", "context": " on DBF submitted documentation shall not relieve DBF from compliance with requirements Exhibit A - Sol" }, { "keyword": "DBF", "context": "ON 01300 SUBMITTALS of the Contract Documents. b. DBF is responsible for managing, tracking, and docume" }, { "keyword": "DBF", "context": "ntation and does not constitute validation of the DBF's submitted information. R R D R X M A. DBF shall" }, { "keyword": "DBF", "context": "f the DBF's submitted information. R R D R X M A. DBF shall maintain an accurate Submittal Log and a Di" }, { "keyword": "DBF", "context": "es at all times in a form acceptable to the CITY. DBF shall make the Submittal Log available to the CIT" }, { "keyword": "DBF", "context": "requirements of the ContractDocuments. M R R M A. DBF shall furnish the CITY for review, 3 copies of ea" }, { "keyword": "DBF", "context": " CITY will return prints of each submittal to the DBF with its comments noted thereon, within twenty-on" }, { "keyword": "DBF", "context": "(21) calendar days following their receipt by the DBF. It is considered reasonable that the DBF shall m" }, { "keyword": "DBF", "context": " by the DBF. It is considered reasonable that the DBF shall make a complete and acceptable submittal to" }, { "keyword": "DBF", "context": "D. If 3 copies of a submittal are returned to the DBF marked \"NO EXCEPTIONS TAKEN\", formal revision and" }, { "keyword": "DBF", "context": "E. If 3 copies of a submittal are returned to the DBF marked \"MAKE CORRECTIONS NOTED,\" formal revision " }, { "keyword": "DBF", "context": " berequired. F. If a submittal is returned to the DBF marked \"REVISE AND RESUBMIT\" or \"AMEND- RESUBMIT," }, { "keyword": "DBF", "context": "d \"REVISE AND RESUBMIT\" or \"AMEND- RESUBMIT,\" the DBF shall revise said submittal and shall resubmit th" }, { "keyword": "DBF", "context": "to the CITY. G. If a submittal is returned to the DBF marked \"REJECTED-RESUBMIT\", the DBF shall revise " }, { "keyword": "DBF", "context": "turned to the DBF marked \"REJECTED-RESUBMIT\", the DBF shall revise said submittal and shall resubmit th" }, { "keyword": "DBF", "context": "e pertinent submittals and returned copies to the DBF marked either 'NO EXCEPTIONS TAKEN\" or 'MAKE CORR" }, { "keyword": "DBF", "context": "s for changes to the contractrequirements. I. All DBF shop drawing submittals shall be carefully review" }, { "keyword": "DBF", "context": "y reviewed by an authorized representative of the DBF, prior to submission to the CITY. Each submittal " }, { "keyword": "DBF", "context": "ttal shall be dated, signed, and certified by the DBF, as being correct and in strict conformance with " }, { "keyword": "DBF", "context": "d. No consideration for review by the CITY of any DBF submittals will be made for any items, which have" }, { "keyword": "DBF", "context": "ny items, which have not been so certified by the DBF. All non-certified submittals will be returned to" }, { "keyword": "DBF", "context": " non-certified submittals will be returned to the DBF without action taken by the CITY, and any delays " }, { "keyword": "DBF", "context": " thereby shall be the total responsibility of the DBF. J. The CITY's review of DBF shop drawing submitt" }, { "keyword": "DBF", "context": "esponsibility of the DBF. J. The CITY's review of DBF shop drawing submittals shall not relieve the DBF" }, { "keyword": "DBF", "context": "DBF shop drawing submittals shall not relieve the DBF of the entire responsibility for the correctness " }, { "keyword": "DBF", "context": "or the correctness of details and dimensions. The DBF shall assume all responsibility and risk for any " }, { "keyword": "DBF", "context": "ity and risk for any misfits due to any errors in DBF submittals. The DBF shall be responsible for the " }, { "keyword": "DBF", "context": " misfits due to any errors in DBF submittals. The DBF shall be responsible for the dimensions and the d" }, { "keyword": "DBF", "context": " Identification of revisions on resubmittals. 11. DBF's stamp, initialed or signed, certifying to revie" }, { "keyword": "DBF", "context": "or approval of submittal. C. Return submittals to DBF for distribution R R D R X D Exhibit A - Solicita" }, { "keyword": "DBF", "context": "ercial rates applicable at time of purchase. R A. DBF shall pay costs for specified photography andprin" }, { "keyword": "DBF", "context": ". 3. Project Record File (one set to be stored by DBF). 4. DBF (one set). D Exhibit A - Solicitation an" }, { "keyword": "DBF", "context": "ect Record File (one set to be stored by DBF). 4. DBF (one set). D Exhibit A - Solicitation and Contrac" }, { "keyword": "DBF", "context": "e of manufacturer, however, shall not relieve the DBF of the responsibility for furnishing products, ma" }, { "keyword": "DBF", "context": "e Contract Documents. Compliance is a duty of the DBF and said duty shall not be avoided by any act or " }, { "keyword": "DBF", "context": "ratory service shall comply with thefollowing: 1. DBF will appoint, employ, and pay for services of an " }, { "keyword": "DBF", "context": "ill perform inspection and testing itself. 2. The DBF or independent firm will perform inspections, tes" }, { "keyword": "DBF", "context": " or non-compliance with ContractDocuments. 4. The DBF shall cooperate with the independent firm and fur" }, { "keyword": "DBF", "context": "ools, storage and assistance as requested. 5. The DBF shall notify CITY 48 hours prior to the expected " }, { "keyword": "DBF", "context": "ependent firm on instructions by the CITY. 7. The DBF shall bear all costs from such retesting at no ad" }, { "keyword": "DBF", "context": "o the CITY. 8. For samples and tests required for DBF's use, the DBF shall make arrangements with an in" }, { "keyword": "DBF", "context": "For samples and tests required for DBF's use, the DBF shall make arrangements with an independent firm " }, { "keyword": "DBF", "context": "testing. The cost of sampling and testing for the DBF'S use shall be included in the Contract Price. 9." }, { "keyword": "DBF", "context": "S use shall be included in the Contract Price. 9. DBF shall bear all costs if materials for testing are" }, { "keyword": "DBF", "context": "ng are not ready for testing at time specified by DBF for the test. R R D R X A. Inspection: The DBF sh" }, { "keyword": "DBF", "context": "by DBF for the test. R R D R X A. Inspection: The DBF shall inspect materials or equipment upon the arr" }, { "keyword": "DBF", "context": "damaged and defective items. B. Measurements: The DBF shall verify measurements and dimensions of the W" }, { "keyword": "DBF", "context": " installations include manufactured products, the DBF shall comply with manufacturer's applicable instr" }, { "keyword": "DBF", "context": " principal items: 1. Moving on to the site of all DBF's equipment required for first monthoperations. 2" }, { "keyword": "DBF", "context": "water facilities 6. Arranging for and erection of DBF's work, site access, andstorage. 7. Obtaining all" }, { "keyword": "DBF", "context": "d establishment of safety programs. 9. Having the DBF's superintendent at the job site fulltime. 10. Su" }, { "keyword": "DBF", "context": "escribed in Section 01580. R R D R X M R M A. The DBF's attention is directed to the condition that no " }, { "keyword": "DBF", "context": "have been completed as specified. Furthermore, if DBF does not have required trailer, sanitary and pota" }, { "keyword": "DBF", "context": "nternet service 7. Gas service B. It shall be the DBF's responsibility to provide equipment that is ade" }, { "keyword": "DBF", "context": "ndards for Construction. D A. Scheduled Uses: The DBF shall, in conjunction with establishment of job p" }, { "keyword": "DBF", "context": "permanentservice. R R D R X R D R M A. Power: The DBF shall provide all necessary power required for it" }, { "keyword": "DBF", "context": "sh reasonable quantities of water required by the DBF for performance of the WORK under the Contract; h" }, { "keyword": "DBF", "context": "ance of the WORK under the Contract; however, the DBF shall provide all facilities necessary to convey " }, { "keyword": "DBF", "context": "th the requirements of the Contract Document. The DBF shall pay all permit and water charges. B. Potabl" }, { "keyword": "DBF", "context": "\u0005\u0012 452 SECTION 01510 TEMPORARY UTILITIES . by the DBF and shall be bottled water or water furnished in " }, { "keyword": "DBF", "context": "ted conspicuously throughout the site warning the DBF's personnel that piped water may be contaminated." }, { "keyword": "DBF", "context": "er may be contaminated. C. Water Connections: The DBF shall not make connection to, or draw water from," }, { "keyword": "DBF", "context": " water system. For each such connection made, the DBF shall first attach to the fire hydrant or pipelin" }, { "keyword": "DBF", "context": "type acceptable to said authority and agency. The DBF shall pay all permit and water charges. D. Remova" }, { "keyword": "DBF", "context": "temporary connections and piping installed by the DBF shall be entirely removed, and all affected impro" }, { "keyword": "DBF", "context": " shall be provided wherever needed for the use of DBF's employees. Toilets at construction job sites sh" }, { "keyword": "DBF", "context": "uction. B. Sanitary and Other Organic Wastes: The DBF shall establish a regular daily collectionof all " }, { "keyword": "DBF", "context": "d refuse from sanitary facilities provided by the DBF or organic material wasted from any other source " }, { "keyword": "DBF", "context": "erial wasted from any other source related to the DBF's operations shall be disposed of away from the s" }, { "keyword": "DBF", "context": "struction of the WORK shall be connected with the DBF's water supply system and shall be adequately pro" }, { "keyword": "DBF", "context": "as to prevent or minimize the hazard of fire. The DBF's fire protection program shall conform to the re" }, { "keyword": "DBF", "context": "ction. MM A. Telephone and Internet Services: The DBF shall provide and maintain at all time during the" }, { "keyword": "DBF", "context": "K included in the Contract. B. Telephone Use: The DBF shall permit the CITY, the OWNER, or their author" }, { "keyword": "DBF", "context": " PROTECTION OF EXISTING FACILITIES . R R R A. The DBF shall protect all existing utilities and improvem" }, { "keyword": "DBF", "context": "th requirements of the Contract Documents. B. The DBF shall verify the exact locations and depths of al" }, { "keyword": "DBF", "context": "cations and depths of all utilities shown and the DBF shall make exploratory excavations of all utiliti" }, { "keyword": "DBF", "context": "e of construction to avoid possible delays to the DBF's work. When such exploratory excavations show th" }, { "keyword": "DBF", "context": "the utility location as shown to be in error, the DBF shall so notify the CITY. C. The number of explor" }, { "keyword": "DBF", "context": " the alignment and grade of the utility. R A. The DBF shall not do any work that would affect any oil, " }, { "keyword": "DBF", "context": " any fence; or any other structure, nor shall the DBF enter upon the rights-of-way involved until notif" }, { "keyword": "DBF", "context": "per party. After authority has been obtained, the DBF shall give said party due notice of its intention" }, { "keyword": "DBF", "context": "able privilege may be granted by the OWNER to the DBF so desiring, to the extent, amount, in the manner" }, { "keyword": "DBF", "context": "onditions of the Contract. R R R R D M R R A. The DBF shall not destroy, remove, or otherwise disturb a" }, { "keyword": "DBF", "context": "ed. All survey markers or points disturbed by the DBF shall be accurately restored after all street or " }, { "keyword": "DBF", "context": "y the public authorities having jurisdiction, the DBF shall place temporary surfacing promptly after ba" }, { "keyword": "DBF", "context": "satisfactory junction with adjacent surfaces, the DBF shall saw cut back and trim the edge so as to pro" }, { "keyword": "DBF", "context": "ve been removed for purposes of construction, the DBF shall place suitable temporary sidewalks or drive" }, { "keyword": "DBF", "context": "n or, if no such period of times is so fixed, the DBF shall maintain said temporary sidewalks or drivew" }, { "keyword": "DBF", "context": " the final restoration thereof has been made. The DBF shall restore all private properties within thirt" }, { "keyword": "DBF", "context": "s received by theOWNER. X D M R M A. General: The DBF shall protect all Underground Utilities and other" }, { "keyword": "DBF", "context": "d during construction operations. It shall be the DBF's responsibility to ascertain the actual location" }, { "keyword": "DBF", "context": "protected from damage due to such operations. The DBF shall take all possible precautions for the prote" }, { "keyword": "DBF", "context": "any or franchise holder will, upon request of the DBF, be notified by the OWNER to move such property w" }, { "keyword": "DBF", "context": "re encountered within the area of operations, the DBF shall notify the CITY a sufficient time in advanc" }, { "keyword": "DBF", "context": "lity or other improvement which is indicated, the DBF shall remove and, without unnecessary delay, temp" }, { "keyword": "DBF", "context": "n to former location shall be accomplished by the DBF in a manner that will restore or replace the util" }, { "keyword": "DBF", "context": "d or the locations of which are made known to the DBF prior to excavation and that are to be retained, " }, { "keyword": "DBF", "context": " shall be immediately repaired or replaced by the DBF at no cost to the CITY. F. Underground Utilities " }, { "keyword": "DBF", "context": "nd Utilities Not Indicated: In the event that the DBF damages any existing utility lines that are not i" }, { "keyword": "DBF", "context": " the locations of which are not made known to the DBF prior to excavation, a written report thereof sha" }, { "keyword": "DBF", "context": "irected by the CITY, repairs shall be made by the DBF under the provisions contained in these Contract " }, { "keyword": "DBF", "context": "ating, repairing damage not due to failure of the DBF to exercise reasonable care, and removing or relo" }, { "keyword": "DBF", "context": ", sewer, storm drain, pole, or wire or cable. The DBF shall be responsible for and shall repair all dam" }, { "keyword": "DBF", "context": "on of thebackfilling. J. Existing Water Services: DBF shall protect and provide temporary support for e" }, { "keyword": "DBF", "context": " water services. Any water service damaged by the DBF, shall be replaced at the DBF's expense, with a n" }, { "keyword": "DBF", "context": "vice damaged by the DBF, shall be replaced at the DBF's expense, with a new water service complete with" }, { "keyword": "DBF", "context": "th new water maintap. R R R D R M A. General: The DBF shall exercise all necessary precautions so as no" }, { "keyword": "DBF", "context": " construction shall be trimmed or replaced by the DBF or a certified tree company under permit from the" }, { "keyword": "DBF", "context": " trees that require trimming due to damage by the DBF\u2019s operation. C. Replacement: The DBF shall immedi" }, { "keyword": "DBF", "context": "amage by the DBF\u2019s operation. C. Replacement: The DBF shall immediately notify the jurisdictional agenc" }, { "keyword": "DBF", "context": "cy and/or the OWNER if any tree is damaged by the DBF's operations. If, in the opinion of said agency o" }, { "keyword": "DBF", "context": "damage is such that replacement is necessary, the DBF shall replace the tree at DBF\u2019s own expense. The " }, { "keyword": "DBF", "context": "t is necessary, the DBF shall replace the tree at DBF\u2019s own expense. The tree shall be of a like size a" }, { "keyword": "DBF", "context": "s the tree damaged, or, if of a smaller size, the DBF shall pay to the OWNER of said tree a compensator" }, { "keyword": "DBF", "context": "d all roadway and state highway rights-of-way the DBF shall notify the respective authorities represent" }, { "keyword": "DBF", "context": "e present during such work if they so desire. The DBF shall also notify the Sunshine State One Call Cen" }, { "keyword": "DBF", "context": "f applicable codes and standards. A. Materials to DBF's option, minimum fence height = 6 feet. RR R A. " }, { "keyword": "DBF", "context": "nimum fence height = 6 feet. RR R A. Materials to DBF's option, as appropriate to serve requiredpurpose" }, { "keyword": "DBF", "context": "ECTION 01550 SITE ACCESS AND STORAGE R R M A. The DBF shall make its own investigation of the condition" }, { "keyword": "DBF", "context": "d egress to the site of the WORK. It shall be the DBF's responsibility to construct and maintain any ha" }, { "keyword": "DBF", "context": "als not exceeding 300 feet shall be provided. The DBF shall cooperate with parties involved in the deli" }, { "keyword": "DBF", "context": "me. B. Temporary Bridges: Wherever necessary, the DBF shall provide suitable temporary bridges or steel" }, { "keyword": "DBF", "context": "unfilled excavations, except in such cases as the DBF shall secure the written consent of the individua" }, { "keyword": "DBF", "context": "thority having jurisdiction in each case, and the DBF shall adopt designs furnished by said authority f" }, { "keyword": "DBF", "context": " Nothing herein shall be construed to entitle the DBF to the exclusive use of any public street, alleyw" }, { "keyword": "DBF", "context": " times. Temporary provisions shall be made by the DBF to assure the use of sidewalks and the proper fun" }, { "keyword": "DBF", "context": "raffic in public or private streets and ways, the DBF shall provide, place, and maintain all necessary " }, { "keyword": "DBF", "context": "Federal Highway Administration (ANSID6.1). E. The DBF shall take all necessary precautions for the prot" }, { "keyword": "DBF", "context": "ll be kept burning from sunset until sunrise. The DBF shall station such guards or flaggers and shall c" }, { "keyword": "DBF", "context": " the Florida Department of Transportation. F. The DBF shall submit 3 copies of a traffic control plan t" }, { "keyword": "DBF", "context": "l supersede these plans and be done solely at the DBF's expense. Submittal to CITY of traffic control p" }, { "keyword": "DBF", "context": "o CITY of traffic control plan does not alleviate DBF from requirements of submitting plan to authorizi" }, { "keyword": "DBF", "context": " submitting plan to authorizing authority. G. The DBF shall remove traffic control devices when no long" }, { "keyword": "DBF", "context": "o match grade. H. Temporary Driveway Closure: The DBF shall notify the OWNER or occupant (if not OWNER-" }, { "keyword": "DBF", "context": "at least 3 working days prior to the closure. The DBF shall minimize the inconvenience and minimize the" }, { "keyword": "DBF", "context": "ime period that the driveways will be closed. The DBF shall fully explain to the OWNER/occupant how lon" }, { "keyword": "DBF", "context": "not exceed 5 days. D \u2019S WORK AND STORAGE R A. The DBF shall designate and arrange for the use of a port" }, { "keyword": "DBF", "context": "tion operations relative to this Contract. B. The DBF's use of the project site shall be limited to its" }, { "keyword": "DBF", "context": "ll be limited to its construction operations. The DBF shall make its own arrangements for any necessary" }, { "keyword": "DBF", "context": "the public right of way in excess of 15 days. The DBF shall keep these areas in a clean and orderly con" }, { "keyword": "DBF", "context": "t obstruction to motorists or pedestrians. C. The DBF shall construct and use a separate storage area f" }, { "keyword": "DBF", "context": "ording to the Material Safety Data Sheets. 3. The DBF shall develop and submit to the CITY a plan for s" }, { "keyword": "DBF", "context": "ring and disposing of the materials above. 4. The DBF shall obtain and submit to the CITY a single EPA " }, { "keyword": "DBF", "context": "ents of authorities having jurisdiction. R A. The DBF shall: 1. The DBF shall direct its employees to p" }, { "keyword": "DBF", "context": "s having jurisdiction. R A. The DBF shall: 1. The DBF shall direct its employees to park in designated " }, { "keyword": "DBF", "context": "loyees to park in designated areas secured by the DBF. 2. Traffic and parking areas shall be maintained" }, { "keyword": "DBF", "context": "n equipment, mud, and construction materials. The DBF shall repair breaks, potholes, low areas which co" }, { "keyword": "DBF", "context": "s at the construction site and related area under DBF's control; remove physical evidence of temporary " }, { "keyword": "DBF", "context": "ecommendations. D R R A. Maintain all areas under DBF's control free of extraneous debris. B. Initiate " }, { "keyword": "DBF", "context": "llutant Discharge Elimination System (NPDES). The DBF shall develop and implement a Stormwater Pollutio" }, { "keyword": "DBF", "context": "ain an orderly flow of traffic in all areas under DBF's control or affected by DBF's operations. R A. P" }, { "keyword": "DBF", "context": "c in all areas under DBF's control or affected by DBF's operations. R A. Provide qualified and suitably" }, { "keyword": "DBF", "context": "vide protection to the workers and residents, the DBF shall maintain emergency access to all adjacent p" }, { "keyword": "DBF", "context": "perties for a distance that exceeds 150 feet, the DBF shall provide a 10-foot-wide stabilized access wa" }, { "keyword": "DBF", "context": "of the trench capable of supporting a Fire Truck. DBF shall also provide stabilized access ways across " }, { "keyword": "DBF", "context": "n from the Engineer and CITY, and it shall be the DBF\u2019s responsibility to provide proper protection of " }, { "keyword": "DBF", "context": "quired by the regulatory agency. In addition, the DBF shall provide a security guard at the site whenev" }, { "keyword": "DBF", "context": "provide a security guard at the site whenever the DBF\u2019s personnel are not present, 24 hours per day/ 7 " }, { "keyword": "DBF", "context": "n at all times. In addition to this provision the DBF shall maintain trench safety and comply with curr" }, { "keyword": "DBF", "context": "t OSHA regulations and the Trench Safety Act. The DBF shall maintain and keep all safety barricades, si" }, { "keyword": "DBF", "context": "manufacturer and the installing Subcontractor. B. DBF Options 1. For products specified only by referen" }, { "keyword": "DBF", "context": "roducts or manufacturers and \"or approved equal,\" DBF must submit a request as for substitutions for an" }, { "keyword": "DBF", "context": "act Date, CITY will consider written request from DBF for substitution of products. 2. Identify product" }, { "keyword": "DBF", "context": "ubstitute material or equipment shall be upon the DBF. 7. The CITY will be the sole judge as to the typ" }, { "keyword": "DBF", "context": "ision shall be final. 8. The CITY may require the DBF to furnish at the DBF's expense additional data a" }, { "keyword": "DBF", "context": "8. The CITY may require the DBF to furnish at the DBF's expense additional data about the proposed subs" }, { "keyword": "DBF", "context": "proposed substitute. 9. The OWNER may require the DBF to furnish at the DBF's expense a special perform" }, { "keyword": "DBF", "context": ". The OWNER may require the DBF to furnish at the DBF's expense a special performance guarantee or othe" }, { "keyword": "DBF", "context": " by the CITY of a substitute item proposed by the DBF shall not relieve the DBF of the responsibility f" }, { "keyword": "DBF", "context": "te item proposed by the DBF shall not relieve the DBF of the responsibility for full compliance with th" }, { "keyword": "DBF", "context": " and for adequacy of the substitute item. 11. The DBF shall be responsible for resultant changes and al" }, { "keyword": "DBF", "context": "s which the accepted substitution requires in the DBF work, the work of its Subcontractors and of other" }, { "keyword": "DBF", "context": "effect such changes without cost to the OWNER. D. DBF\u2019s Representation 1. A request for a substitution " }, { "keyword": "DBF", "context": " d. Waives all claims for additional costs, under DBF\u2019S responsibility, which may subsequently become a" }, { "keyword": "DBF", "context": "stitutions with reasonable promptness, and notify DBF, in writing, of the decision to accept or reject " }, { "keyword": "DBF", "context": "cations. B. Conditions of the Contract. M A. When DBF considers the work is substantially complete, DBF" }, { "keyword": "DBF", "context": "DBF considers the work is substantially complete, DBF shall submit to OWNER's Representative: 1. A writ" }, { "keyword": "DBF", "context": ". OWNER's Representative will promptly notify the DBF in writing, giving the reasons, therefore. 2. DBF" }, { "keyword": "DBF", "context": "DBF in writing, giving the reasons, therefore. 2. DBF shall remedy the deficiencies in the work and sen" }, { "keyword": "DBF", "context": "tificate of Substantial Completion accompanied by DBF's list of items to be completed or corrected, as " }, { "keyword": "DBF", "context": "e. 2. Submit the Certificate to the OWNER and the DBF for their written acceptance of the responsibilit" }, { "keyword": "DBF", "context": "ities assigned to them in theCertificate. A. When DBF considers the work is complete, DBF shall submit " }, { "keyword": "DBF", "context": "cate. A. When DBF considers the work is complete, DBF shall submit written certification that: 1. Contr" }, { "keyword": "DBF", "context": ". OWNER's Representative will promptly notify the DBF, in writing, listing the incomplete or defective " }, { "keyword": "DBF", "context": "ing, listing the incomplete or defective work. 2. DBF shall take immediate steps to remedy the stated d" }, { "keyword": "DBF", "context": "cuments, OWNER's Representative shall request the DBF to make closeout submittals. R A. Should OWNER's " }, { "keyword": "DBF", "context": "th the claims of status of completion made by the DBF: 1. OWNER will compensate OWNER's Representative " }, { "keyword": "DBF", "context": "f such compensation from the final payment to the DBF. D \u2019S CLOSEOUT SUBMITTALS TO OWNER\u2019S R R A. Evide" }, { "keyword": "DBF", "context": "were not previously made by Change Orders. R M A. DBF shall submit the final Application for Payment in" }, { "keyword": "DBF", "context": "s Representative reserves the right to direct the DBF to remove waste materials, after which waste shal" }, { "keyword": "DBF", "context": " removed within 24 hours. E. Mechanical Sweeping: DBF shall maintain on site a mechanical sweeping devi" }, { "keyword": "DBF", "context": "E. Prior to final completion, or OWNER occupancy, DBF shall conduct an inspection of sight- exposed int" }, { "keyword": "DBF", "context": "he project site is the sole responsibility of the DBF. In preparing the Bid, the DBF shall make all sub" }, { "keyword": "DBF", "context": "ponsibility of the DBF. In preparing the Bid, the DBF shall make all sub-surface or surface investigati" }, { "keyword": "DBF", "context": "icable Sections under Divisions 1, 2, and 3. R A. DBF Qualifications: Minimum of five years of experien" }, { "keyword": "DBF", "context": "e contract plans, and as specified herein. B. The DBF shall provide references to the OWNER to demonstr" }, { "keyword": "DBF", "context": "ble nature. Current occupational licenses held by DBF shall be submitted to OWNER. C. The DBF shall be " }, { "keyword": "DBF", "context": "s held by DBF shall be submitted to OWNER. C. The DBF shall be responsible for adherence to all applica" }, { "keyword": "DBF", "context": "rees, drives or other items to remain. X D A. The DBF shall become thoroughly familiar with the site, a" }, { "keyword": "DBF", "context": "y influence the work. B. By submitting a bid, the DBF affirms that DBF has carefully examined the site " }, { "keyword": "DBF", "context": "ork. B. By submitting a bid, the DBF affirms that DBF has carefully examined the site and all condition" }, { "keyword": "DBF", "context": "asbestos, chemicals, etc., from the site prior to DBF mobilizing on site. The OWNER shall be notified i" }, { "keyword": "DBF", "context": "he OWNER shall be notified immediately should the DBF discover any further hazardous materials during d" }, { "keyword": "DBF", "context": "zardous materials during demolition. R R D R X A. DBF shall verify that structures to be demolished are" }, { "keyword": "DBF", "context": "\u0005 \u0002\b \u0003\u000f\u000e\u0007\u000f\u0010\u0006 \u0005\u0012 482 SECTION 02050 DEMOLITION . B. DBF shall not commence work until all conditions and " }, { "keyword": "DBF", "context": "ed for salvaging shall become the property of the DBF and shall be removed from site and legally dispos" }, { "keyword": "DBF", "context": "icated as \"NIC ITEMS\". B. Under this section, the DBF shall do all clearing, grubbing, root-raking, and" }, { "keyword": "DBF", "context": "n, and as directed by the CITY on thesite. D. The DBF shall remove all refuse, asphalt pavement, concre" }, { "keyword": "DBF", "context": "in adjacent areas as directed by the CITY. E. The DBF shall furnish all services, labor, transportation" }, { "keyword": "DBF", "context": "ng, etc. shall be installed and maintained by the DBF. R X R R R M A. The DBF shall provide all equipme" }, { "keyword": "DBF", "context": "led and maintained by the DBF. R X R R R M A. The DBF shall provide all equipment necessary for dewater" }, { "keyword": "DBF", "context": "ea rock at no additional cost to the CITY. F. The DBF shall maintain the water level below the bottom o" }, { "keyword": "DBF", "context": "uction, backfilling, and up to acceptance. G. The DBF shall prevent flotation by maintaining positive a" }, { "keyword": "DBF", "context": "ing positive and continuous removal of water. The DBF shall be fully responsible and liable for all dam" }, { "keyword": "DBF", "context": "ts from the sub-surface. A continual check by the DBF shall be maintained to ensure that the sub-surfac" }, { "keyword": "DBF", "context": " being removed by the dewateringoperation. I. The DBF shall dispose of water from the WORK in a suitabl" }, { "keyword": "DBF", "context": "table manner without damage to adjacent property. DBF shall be responsible for obtaining any permits th" }, { "keyword": "DBF", "context": "o being used. Storm drains facilities used by the DBF for dewatering shall be cleaned by a jet vac, or " }, { "keyword": "DBF", "context": "d item has been established fordewatering. L. The DBF shall submit a dewatering plan to the CITY for re" }, { "keyword": "DBF", "context": "mit a dewatering plan to the CITY for review. The DBF is advised that the Broward County Environmental " }, { "keyword": "DBF", "context": "mits are to be obtained and will require that the DBF follow certain dewatering constraints. The dewate" }, { "keyword": "DBF", "context": "S are noted on approved dewatering permit. M. The DBF is advised that the BCEPD may have identified con" }, { "keyword": "DBF", "context": " within 1/4- mile radius of the project site. The DBF will be required to provide testing and monitorin" }, { "keyword": "DBF", "context": ". R A. It shall be the sole responsibility of the DBF to control the rate and effect of the dewatering " }, { "keyword": "DBF", "context": "ed project and shall be the responsibility of the DBF. C. Where critical structures or facilities exist" }, { "keyword": "DBF", "context": " structures and facilities, rests solely with the DBF. The cost of repairing any damage to adjacent str" }, { "keyword": "DBF", "context": ". D M A. Prior to commencement of excavation, the DBF shall submit a detailed plan and operation schedu" }, { "keyword": "DBF", "context": "ation schedule for dewatering of excavations. The DBF may be required to demonstrate the system propose" }, { "keyword": "DBF", "context": "r the excavations at all locations and times. The DBF's dewatering plan is subject to review by the CIT" }, { "keyword": "DBF", "context": " of any type made as to sub-surfaceconditions. A. DBF shall visit the site and acquaint with all existi" }, { "keyword": "DBF", "context": "e site and acquaint with all existing conditions. DBF shall investigate the site and sub-surface condit" }, { "keyword": "DBF", "context": "b-surface conditions with no cost to the OWNER if DBF chooses to. Such sub- surface investigations shal" }, { "keyword": "DBF", "context": " is made as to their accuracy or consistency. The DBF shall verify all existing grades to the extent ne" }, { "keyword": "DBF", "context": " from the construction site at the expense of the DBF. Unsuitable material shall not be stockpiled on-s" }, { "keyword": "DBF", "context": "ite at areas designated by the CITY. M R D M M A. DBF shall employ a registered Professional Surveyor a" }, { "keyword": "DBF", "context": "on. Record the location of allutilities. R A. The DBF shall re-adjust all work performed that does not " }, { "keyword": "DBF", "context": "how non-compliance with the required density, the DBF shall accomplish such remedy as may be required t" }, { "keyword": "DBF", "context": "oratory selected by the OWNER and shall be at the DBF's expense. D. Particle size analysis of soils and" }, { "keyword": "DBF", "context": "s and standards are set forth in ASTM D 2487. The DBF shall be bound by all applicable provisions of sa" }, { "keyword": "DBF", "context": "meet the quantity requirements of the project the DBF shall provide the imported materials at no additi" }, { "keyword": "DBF", "context": ", stable base for pavements. At the option of the DBF, the grading for either the 1-1/2-inch maximum si" }, { "keyword": "DBF", "context": "to construct reinforced concrete floor slabs. The DBF shall use, at its option, one of the asphalt type" }, { "keyword": "DBF", "context": " classed as unsuitable material. D M M M R A. The DBF shall use the types of materials as designated he" }, { "keyword": "DBF", "context": "tely notified. In case of conflict therewith, the DBF shall use the most stringent requirement, as dete" }, { "keyword": "DBF", "context": "as shall have a maximum organic component of 10%. DBF shall provide, at DBF\u2019S cost, organic content tes" }, { "keyword": "DBF", "context": "m organic component of 10%. DBF shall provide, at DBF\u2019S cost, organic content test results for approval" }, { "keyword": "DBF", "context": "erforming any excavation or placing any fill. The DBF shall furnish, place, and maintain all supports a" }, { "keyword": "DBF", "context": " benched. When such over excavation is shown, the DBF shall perform both over-excavation and subsequent" }, { "keyword": "DBF", "context": "de a self-draining subgrade. D. Notification: The DBF shall notify the CITY at least 3 days in advance " }, { "keyword": "DBF", "context": "method of pipe zone densification selected by the DBF but shall have a minimum width at the bottom of t" }, { "keyword": "DBF", "context": "ecified in this Section shall be performed by the DBF when the over- excavation ordered by the CITY is " }, { "keyword": "DBF", "context": "its shown, additional payment will be made to the DBF for that portion of the work which is located bel" }, { "keyword": "DBF", "context": "e with the specified material and compaction. The DBF at its own expense shall perform such work. X R A" }, { "keyword": "DBF", "context": "wn as near as possible to its original condition. DBF shall provide new sod if stockpiled sod has not b" }, { "keyword": "DBF", "context": "C. Said rock excavation shall be performed by the DBF; provided, that should the quantity of rock excav" }, { "keyword": "DBF", "context": "blasting is utilized at the site of the WORK, the DBF shall take all precautions and provide all protec" }, { "keyword": "DBF", "context": "tures or injury to person. Prior to blasting, the DBF shall secure all permits required by law for blas" }, { "keyword": "DBF", "context": "ional hazard insurance required by the OWNER. The DBF shall have a fully qualified and experienced blas" }, { "keyword": "DBF", "context": "visor in charge of all blastingoperations. E. The DBF will be held responsible for all and shall make g" }, { "keyword": "DBF", "context": "ll local laws and regulations. D X X D M R A. The DBF shall remove and dispose of all excess excavated " }, { "keyword": "DBF", "context": "cess excavated material at a site selected by the DBF and reviewed by the CITY. D X D M R A. The DBF sh" }, { "keyword": "DBF", "context": "he DBF and reviewed by the CITY. D X D M R A. The DBF shall remove and dispose of all unsuitable excava" }, { "keyword": "DBF", "context": "tion. Disposal shall be at a site selected by the DBF that is designated as an approved disposal site f" }, { "keyword": "DBF", "context": "ed using flooding and jetting or vibration if the DBF uses effective procedures that yield the specifie" }, { "keyword": "DBF", "context": "the trench configuration specified herein. K. The DBF shall maintain the indicated trench cross section" }, { "keyword": "DBF", "context": " at any location under said horizontal plane, the DBF slopes the trench walls or exceeds the maximum tr" }, { "keyword": "DBF", "context": "eflection specified for the pipe is exceeded, the DBF shall expose and reground or replace the pipe, re" }, { "keyword": "DBF", "context": "ing is required, after compacting the bedding the DBF shall perform a final trim using a stringline for" }, { "keyword": "DBF", "context": "kfilled with the specified backfill material. The DBF shall exercise care to prevent damage to the pipe" }, { "keyword": "DBF", "context": "compacted along with the new fill material at the DBF\u2019s expense. Hillside of fill slopes 4:1 or flatter" }, { "keyword": "DBF", "context": " roadbed shall be maintained at all times. B. The DBF shall maintain all earthwork construction through" }, { "keyword": "DBF", "context": "m the roadway due to the action of wind or water. DBF shall repair at DBF\u2019S expense, except as otherwis" }, { "keyword": "DBF", "context": " the action of wind or water. DBF shall repair at DBF\u2019S expense, except as otherwise provided herein, a" }, { "keyword": "DBF", "context": "rk and prior to final inspection of the area, the DBF shall provide the CITY with an as-built topograph" }, { "keyword": "DBF", "context": "the plans will specify an average depth ofcut. C. DBF to take ownership of milled material. R R D M A. " }, { "keyword": "DBF", "context": "eject the milling machine for further use. D. The DBF may use a smaller milling machine when milling to" }, { "keyword": "DBF", "context": "able range. The CITY will periodically verify the DBF\u2019s measurements at the jobsite. E. The CITY can ra" }, { "keyword": "DBF", "context": "low the required level shall be backfilled at the DBF's expense with sharp sand, gravel or other suitab" }, { "keyword": "DBF", "context": "sonry or joints against washing or damage. G. The DBF shall also use such other means as may be necessa" }, { "keyword": "DBF", "context": "s, or other approved method, will not relieve the DBF of DBF\u2019S responsibility to make structures watert" }, { "keyword": "DBF", "context": "ther approved method, will not relieve the DBF of DBF\u2019S responsibility to make structures watertight. E" }, { "keyword": "DBF", "context": "which excavation and backfill is required. L. The DBF shall furnish, put in place, and maintain such sh" }, { "keyword": "DBF", "context": " compliance with such order shall not release the DBF from DBF\u2019S responsibility for the sufficiency of " }, { "keyword": "DBF", "context": "ce with such order shall not release the DBF from DBF\u2019S responsibility for the sufficiency of the sheet" }, { "keyword": "DBF", "context": "sibility for the sufficiency of the sheeting. The DBF shall leave all sheeting in place. The CITY may r" }, { "keyword": "DBF", "context": "l be compacted to that as noted in Section 02200. DBF will be responsible for correcting settlement in " }, { "keyword": "DBF", "context": "l govern the WORK under thissection. R D D A. The DBF shall furnish all labor, materials, equipment and" }, { "keyword": "DBF", "context": "under Florida waterways and majorroadways. B. The DBF shall visit the site and determine the proximity " }, { "keyword": "DBF", "context": "f structures on either side of the crossings. The DBF shall provide the OWNER with a drilling plan outl" }, { "keyword": "DBF", "context": "estructures. C. Prior to pre-construction meeting DBF is to submit \u201cFrac-Out Plan\u201d (see Exhibit A) per " }, { "keyword": "DBF", "context": "f the non-toxic florescent tracking dyes that the DBF will be using with the drilling lubricant as a mo" }, { "keyword": "DBF", "context": "the bentonite. D. Prior to the start of work, the DBF shall engage a Professional Engineer registered i" }, { "keyword": "DBF", "context": "le for directional drill operations. In addition, DBF shall identify an environmental scientist/biologi" }, { "keyword": "DBF", "context": "PE BY DIRECTIONAL DRILL TECHNIQUE . OWNER. F. The DBF shall install, maintain, and leave in place any s" }, { "keyword": "DBF", "context": "eting for the excavation be left in place. G. The DBF shall maintain traffic whenever possible during f" }, { "keyword": "DBF", "context": "nd locations shall be approved b the CITY. H. The DBF shall assume all responsibility for the methods a" }, { "keyword": "DBF", "context": "ction of the authorized representative. It is the DBF's responsibility to be fully informed of all requ" }, { "keyword": "DBF", "context": "all workaccordingly. J. All equipment used by the DBF on OWNER's property and rights-of-way may be insp" }, { "keyword": "DBF", "context": " the OWNER or the OWNER's Representatives. K. The DBF shall be fully responsible for all damages arisin" }, { "keyword": "DBF", "context": "e for all damages arising from the failure of the DBF or Subcontractors to comply with the regulations " }, { "keyword": "DBF", "context": " the requirements of these Specifications. L. The DBF's methods and schedule shall comply with the over" }, { "keyword": "DBF", "context": "comply with the overall project requirements. The DBF shall be familiar with the work within the local " }, { "keyword": "DBF", "context": " work within the local subsurface conditions. The DBF's selection of inadequate, inappropriate, or inef" }, { "keyword": "DBF", "context": "nts to the Contract price or Contracttime. M. The DBF shall be responsible for all clean-up of project " }, { "keyword": "DBF", "context": "m in accordance with Contract Documents. M A. The DBF shall submit for the OWNER's approval the qualifi" }, { "keyword": "DBF", "context": "o the start of the directional drilling work, the DBF shall submit the directional drilling work plan f" }, { "keyword": "DBF", "context": "escape. 4. A plan and profile drawing showing the DBF's proposed pilot bore hole routing and location o" }, { "keyword": "DBF", "context": "and the proposed layout at the exit point. C. The DBF shall furnish shop drawings showing all fabricati" }, { "keyword": "DBF", "context": "ils for the directional drilled crossings. D. The DBF shall use dataloggers to record and monitor fusin" }, { "keyword": "DBF", "context": " of the fusing and prior to pulling the pipe, the DBF must provide the datalogger information to the En" }, { "keyword": "DBF", "context": "er information to the Engineer for review. E. The DBF will be responsible for maintaining drilling logs" }, { "keyword": "DBF", "context": "as recorded during the drilling operation. A. The DBF shall, at all times, conform to all applicable St" }, { "keyword": "DBF", "context": "o all applicable State and Federalregulations. B. DBF is to adhere to requirements of all permits. See " }, { "keyword": "DBF", "context": "ies shall be provided in sufficient quantities by DBF and maintained at all sites for use in the event " }, { "keyword": "DBF", "context": "he type of material to be used and be included in DBF's drilling plan presented to OWNER. The OWNER ret" }, { "keyword": "DBF", "context": "m Sewer - no stripes required R X D R DR R A. The DBF shall provide all material, equipment, and facili" }, { "keyword": "DBF", "context": "Entrance and exit angles for the drill are at the DBF's discretion such that the elevation profile main" }, { "keyword": "DBF", "context": "er shown in the Drawings and specified herein. B. DBF shall carefully plan the drill path and ensure al" }, { "keyword": "DBF", "context": "tified. Accuracy of the drill path is a priority. DBF shall only use a wireline locating system or a gy" }, { "keyword": "DBF", "context": "g, steering and guidance of the directional bore. DBF shall monitor and record the bore location during" }, { "keyword": "DBF", "context": "ion of the drill string shall be monitored by the DBF and recorded every 30 feet. Information of the bo" }, { "keyword": "DBF", "context": "ipe manufacturer with a 10% factor of safety. The DBF shall maintain and provide to the OWNER, upon req" }, { "keyword": "DBF", "context": "pletion of the direction drilling operations, the DBF will be required to remove all sheeting in place." }, { "keyword": "DBF", "context": "peline or any other adjacent structure occur, the DBF shall leave all remaining sheeting in place and r" }, { "keyword": "DBF", "context": "bore hole. DR D D A. To the extent practical, the DBF shall maintain a closed loop drilling fluid syste" }, { "keyword": "DBF", "context": "minimize the discharge of any drilling fluids. B. DBF shall have divers present during the drilling ope" }, { "keyword": "DBF", "context": "eas involved during the construction process. The DBF shall provide equipment and procedures to maximiz" }, { "keyword": "DBF", "context": " used in the drilling operation shall be lined by DBF with heavy duty plastic sheeting with sealed join" }, { "keyword": "DBF", "context": "s drilling fluids shall be dewatered and dried by DBF to the extent necessary for disposal, and disposa" }, { "keyword": "DBF", "context": "isposal, and disposal in offsite landfills at the DBF's expense. Water from the dewatering process shal" }, { "keyword": "DBF", "context": "r from the dewatering process shall be treated by DBF to meet permit requirements and disposed of local" }, { "keyword": "DBF", "context": " of the pilot string cutting head shall be at the DBF's discretion. The type and outside diameter of th" }, { "keyword": "DBF", "context": " be used in the pilot string shall also be at the DBF's discretion. C. A minimum depth requirement of 1" }, { "keyword": "DBF", "context": "illing operation. The reamer type shall be at the DBF's discretion. E. The open borehole may be stabili" }, { "keyword": "DBF", "context": "e opening operation, or it shall be hauled by the DBF to an approved dump site and properly disposed. F" }, { "keyword": "DBF", "context": "oject, drilling fluid shall be disposed of by the DBF at an approved dump site. H. A \"weak-link or brea" }, { "keyword": "DBF", "context": " or industry standard international practices. B. DBF to handle pipe and fusing operations with care. F" }, { "keyword": "DBF", "context": "ng operations until the joint has cooled down. C. DBF must use data loggers to monitor fusing and provi" }, { "keyword": "DBF", "context": "or that other utilities may be present. It is the DBF's responsibility to locate all utilities or other" }, { "keyword": "DBF", "context": "re to remain in service shall be protected by the DBF from any damage as a result of the operations. Wh" }, { "keyword": "DBF", "context": "es not shown on the drawings are encountered, the DBF shall report them to the OWNER before proceeding " }, { "keyword": "DBF", "context": "to the OWNER before proceeding with the Work. The DBF shall bear the cost of repair or replacement of a" }, { "keyword": "DBF", "context": "AL DRILL TECHNIQUE . are broken or damaged by the DBF's operations. C. All utilities in close proximity" }, { "keyword": "DBF", "context": "o the utility and maintains adequateclearance. A. DBF is required to perform a pressure test prior to i" }, { "keyword": "DBF", "context": "eds the amount allowed by the Specifications, the DBF, at its expense, shall locate the leaks and make " }, { "keyword": "DBF", "context": "ful testing of the approved pipe will entitle the DBF to full payment of the applicable amounts in the " }, { "keyword": "DBF", "context": "to install the directional drilled pipelines, the DBF shall retain possession of any DBF-supplied pipe " }, { "keyword": "DBF", "context": "pipelines, the DBF shall retain possession of any DBF-supplied pipe and remove it from the site. The bo" }, { "keyword": "DBF", "context": "d with a tool having a 1/2-inch radius. B. If the DBF elects to saw the contraction joints, a slot appr" }, { "keyword": "DBF", "context": "e. R D R A. Section 02200 \u2013 Earthwork. R R A. The DBF shall provide and maintain access to and from all" }, { "keyword": "DBF", "context": "cess to and from all properties along the line of DBF\u2019S work. The DBF shall also provide temporary bypa" }, { "keyword": "DBF", "context": " all properties along the line of DBF\u2019S work. The DBF shall also provide temporary bypasses and maintai" }, { "keyword": "DBF", "context": "tes of compliance signed by material producer and DBF, certifying that each material item complies with" }, { "keyword": "DBF", "context": "omes churned up and mixed with the base rock, the DBF shall dig out and remove the mixture, reshape and" }, { "keyword": "DBF", "context": "the structural efficiency of the base course, the DBF shall remove such cracks or checks by re- Exhibit" }, { "keyword": "DBF", "context": " the rock does not conform to specifications, the DBF shall, at DBF\u2019s own expense, remove such inferior" }, { "keyword": "DBF", "context": " not conform to specifications, the DBF shall, at DBF\u2019s own expense, remove such inferior material from" }, { "keyword": "DBF", "context": "h less than the required compacted thickness, the DBF shall correct such areas by scarifying and adding" }, { "keyword": "DBF", "context": " than 96% of maximum be accepted. I. Testing: The DBF shall coordinate with CITY for all testing. All t" }, { "keyword": "DBF", "context": "ll be removed, replaced, and retested, all at the DBF's expense. 3. Tests shall be taken at least every" }, { "keyword": "DBF", "context": "ffic. For a period of one week after priming, the DBF shall again broom any area where insufficient cov" }, { "keyword": "DBF", "context": "ht in transit by a sudden rain may be laid at the DBF's risk. In no case shall the mixture be laid whil" }, { "keyword": "DBF", "context": "tching and leveling courses. At the option of the DBF, a steel-wheeled roller may be used to supplement" }, { "keyword": "DBF", "context": "quired to provide the specified stability. D. The DBF shall place sod over existing areas damaged by co" }, { "keyword": "DBF", "context": " Excavation and Backfilling forUtilities M A. The DBF shall furnish the CITY shop drawings of the preca" }, { "keyword": "DBF", "context": "l govern the WORK under thissection. R D D A. The DBF shall install and place in operation submersible " }, { "keyword": "DBF", "context": " equipment shall be supplied and installed by the DBF. B. To assure unity of responsibility, pumps, mot" }, { "keyword": "DBF", "context": "ied and coordinated by the pump manufacturer. The DBF shall assume responsibility for the satisfactory " }, { "keyword": "DBF", "context": " Section 16950 \u2013 Miscellaneous Equipment M A. The DBF shall submit to the CITY for preliminary approval" }, { "keyword": "DBF", "context": "s, materials, and material specifications. B. The DBF shall submit a certificate from the equipment man" }, { "keyword": "DBF", "context": "operation, lubrication, and care of each unit. C. DBF shall submit a complete wiring schematic for the " }, { "keyword": "DBF", "context": "p station package. D. Concrete Protection: 1. The DBF shall submit for review a detailed CAD drawing fo" }, { "keyword": "DBF", "context": " precast structure and the ring and cover. 2. The DBF shall provide, upon request, detailed thermo-weld" }, { "keyword": "DBF", "context": "the dimensions and depths indicated on the plans. DBF to determine final sizing, depth and capacity of " }, { "keyword": "DBF", "context": "ast 90 hp and run with a 480 volts configuration. DBF responsible for verifying ultimate pump size and " }, { "keyword": "DBF", "context": "r than the pump unit weigh. C. Pump Design 1. The DBF shall design the pump intake in accordance with H" }, { "keyword": "DBF", "context": "om 15 to 45 psi. Values provided are preliminary. DBF shall verify flows and calculate current and futu" }, { "keyword": "DBF", "context": "s shall accompany each control. H. Spare Parts 1. DBF shall furnish one pump complete with parts necess" }, { "keyword": "DBF", "context": "nel 1. The control panel shall be supplied by the DBF completely factory wired with all necessary motor" }, { "keyword": "DBF", "context": "all be included in the cost of the equipment. The DBF shall anticipate that delays may be caused becaus" }, { "keyword": "DBF", "context": "hich satisfy the conditions,specified. M R A. The DBF shall check all motors for correct lubrication in" }, { "keyword": "DBF", "context": " accordance with manufacturer's instructions. The DBF shall check direction of rotation of all motors a" }, { "keyword": "DBF", "context": "l govern the WORK under thissection. R D D A. The DBF shall furnish and install all piping systems show" }, { "keyword": "DBF", "context": "e construction or fabrication drawings. It is the DBF's responsibility to develop the details necessary" }, { "keyword": "DBF", "context": "ber Products in Automotive Applications. M A. The DBF shall submit complete shop drawings and certifica" }, { "keyword": "DBF", "context": " for certification of tests shall be borne by the DBF. C. The DBF shall submit as part of the shop draw" }, { "keyword": "DBF", "context": "cation of tests shall be borne by the DBF. C. The DBF shall submit as part of the shop drawings a certi" }, { "keyword": "DBF", "context": "ipe joints, supports, or special connections, the DBF shall furnish such assistance at no additional co" }, { "keyword": "DBF", "context": "d valves shall be from the same manufacturer. The DBF shall make the coupling manufacturer responsible " }, { "keyword": "DBF", "context": " thrust restraint is provided by other means. The DBF shall have the coupling Manufacturer's service re" }, { "keyword": "DBF", "context": "r shall approve the final material selection. The DBF shall submit manufacturer's shop drawings and cal" }, { "keyword": "DBF", "context": "als, best suited for each individual service. The DBF shall submit detailed calculations and manufactur" }, { "keyword": "DBF", "context": "ecifically indicated as \"NIC ITEMS\". R D D A. The DBF shall provide all tools, supplies, materials, equ" }, { "keyword": "DBF", "context": "act Documents. Where buried valves are shown, the DBF shall furnish and install valve boxes to grade, w" }, { "keyword": "DBF", "context": "Product Data and Samples\". B. Valve Labeling: The DBF shall submit a schedule of valves to be labeled i" }, { "keyword": "DBF", "context": "TM B 584. C. Certification Prior to shipment, the DBF shall submit for all valves over 12 inches in siz" }, { "keyword": "DBF", "context": "of AWWA, ANSI, ASTM, etc. R R D R A. General: The DBF shall furnish all valves, gates, valve-operating " }, { "keyword": "DBF", "context": "fferent manufacturers supply these operators, the DBF shall coordinate their selection to provide unifo" }, { "keyword": "DBF", "context": "1. All motorized valves shall be furnished by the DBF through the valve manufacturers as a complete pac" }, { "keyword": "DBF", "context": "n the last position\u201d upon loss of control signal. DBF shall be responsible for proper transmitter/contr" }, { "keyword": "DBF", "context": "hases of the power supply shall be monitored. The DBF shall de- energize the motor upon detection of si" }, { "keyword": "DBF", "context": "osure time shall be 1 minute. 20. Spare Parts: a. DBF shall furnish loose, one unit valve operator, com" }, { "keyword": "DBF", "context": " specified, it shall be the responsibility of the DBF to properly assemble and install these various it" }, { "keyword": "DBF", "context": "r to delivery of PVC plastic pipe to the jobsite, DBF shall furnish the ENGINEER complete data from the" }, { "keyword": "DBF", "context": "manufacturer of the type of PVC pipe and fittings DBF proposes to install. C. C900 plastic gravity sewe" }, { "keyword": "DBF", "context": "n all lateral connections over 75 feet in length. DBF is to take all necessary measures to ensure that " }, { "keyword": "DBF", "context": " tightness of gravity sewers shall be made by the DBF in the presence of the ENGINEER. The sewer and co" }, { "keyword": "DBF", "context": " system are to be completed at the expense of the DBF. G. On sanitary sewers, final infiltration and ex" }, { "keyword": "DBF", "context": "ation and exfiltration tests shall be made by the DBF at their expense after all limerock base installa" }, { "keyword": "DBF", "context": "SEWERAGE SYSTEM . exfiltration orinfiltration. I. DBF will provide video of the sanitary sewer pipe ins" }, { "keyword": "DBF", "context": "to have work done by others at the expense of the DBF. Such repair work done by others shall not void t" }, { "keyword": "DBF", "context": "t void the warranty nor the responsibility of the DBF for the balance of the installation by the DBF. D" }, { "keyword": "DBF", "context": "he DBF for the balance of the installation by the DBF. D Exhibit A - Solicitation and Contractor's Resp" }, { "keyword": "DBF", "context": " A. Responsibility for Assuring Quality Work: The DBF'S Superintendent shall be well versed in Florida " }, { "keyword": "DBF", "context": "o properly perform the work assigned to them. The DBF shall be responsible for maintaining the quality " }, { "keyword": "DBF", "context": "such sources shall be removed from the job at the DBF'S expense, and no further plants will be accepted" }, { "keyword": "DBF", "context": "ying of other palms shall be at the option of the DBF. 4. To reduce head volume, Palm fronds may be tap" }, { "keyword": "DBF", "context": "r inorganic material. Submit sample for approval. DBF shall apply one application at initial installati" }, { "keyword": "DBF", "context": "ll be thoroughly investigated and verified by the DBF before the work begins in the Exhibit A - Solicit" }, { "keyword": "DBF", "context": "2900 LANDSCAPE WORK . area of said utilities. The DBF shall exercise care in digging and work so as not" }, { "keyword": "DBF", "context": " of plant material to clear such obstruction. The DBF shall be responsible for the immediate repair of " }, { "keyword": "DBF", "context": "diate repair of any damage to utilities caused by DBF\u2019s work. R R A. Staking Plant Locations: Plant loc" }, { "keyword": "DBF", "context": "eded to eliminate the weeds at the expense of the DBF. D R A. Disposal of Trash: All debris and other o" }, { "keyword": "DBF", "context": "y for Protection and Restoration of Property: The DBF shall be responsible for all damage to property w" }, { "keyword": "DBF", "context": "act. C. Protection Against Mechanical Damage: The DBF's responsibility for protection against mechanica" }, { "keyword": "DBF", "context": "ng signs and barricades as might be necessary and DBF shall repair, restore and replace any planting ar" }, { "keyword": "DBF", "context": "come damaged as a result of any negligence of the DBF or DBF\u2019s employees in complying with these requir" }, { "keyword": "DBF", "context": "maged as a result of any negligence of the DBF or DBF\u2019s employees in complying with these requirements." }, { "keyword": "DBF", "context": " issuance of Certificate of Final Acceptance, the DBF shall do all seasonal spraying and/or dusting of " }, { "keyword": "DBF", "context": "n. F. All testings shall be at the expense of the DBF. M A. Provide product data for specified products" }, { "keyword": "DBF", "context": "f plywood joints with sealant and tool smooth. E. DBF is responsible for the design, construction, remo" }, { "keyword": "DBF", "context": "ons are indicated, and therefore requested by the DBF, each deviation shall be underlined and denoted b" }, { "keyword": "DBF", "context": "lined shall signify compliance on the part of the DBF with the specifications. The submittal shall be a" }, { "keyword": "DBF", "context": "uits. B. As part of the electrical submittal, the DBF shall provide a minimum of \u00bc\u201d=1\u2019- 0\u201d scaled layou" }, { "keyword": "DBF", "context": "lowed for additional work required because of the DBF's failure to fulfill this requirement. C. Carry o" }, { "keyword": "DBF", "context": "und utilities occur during construction. R A. The DBF shall be responsible for: a. Complete systems in " }, { "keyword": "DBF", "context": "and raceway, unless specifically dimensioned. The DBF shall be responsible for the proper routing of ra" }, { "keyword": "DBF", "context": " have been based on Square D and Eaton. C. If the DBF chooses to and is allowed to substitute, the DBF " }, { "keyword": "DBF", "context": " DBF chooses to and is allowed to substitute, the DBF shall be responsible for fitting all the equipmen" }, { "keyword": "DBF", "context": "tallation shall be furnished and installed by the DBF to provide complete power, communication systems," }, { "keyword": "DBF", "context": "s required for permits and inspections. RD A. The DBF shall coordinate with local representatives of th" }, { "keyword": "DBF", "context": "irements of the respective utility M R R R A. The DBF shall furnish, install, and maintain all material" }, { "keyword": "DBF", "context": "epending upon the actual equipment furnished. The DBF shall make adjustments as required to meet the in" }, { "keyword": "DBF", "context": "een damaged, such damage shall be repaired by the DBF at his own cost and expense. If any apparatus has" }, { "keyword": "DBF", "context": "d by the Engineer, at the cost and expense of the DBF, or shall be replaced by the DBF at his own expen" }, { "keyword": "DBF", "context": "d expense of the DBF, or shall be replaced by the DBF at his own expense. D. All electrical panels, enc" }, { "keyword": "DBF", "context": " the specifications. C. Prior to submittal by the DBF, all shop drawings shall be checked for conforman" }, { "keyword": "DBF", "context": "rmed under Division 16 shall be guaranteed by the DBF against defects of workmanship, materials, and pr" }, { "keyword": "DBF", "context": "n of underground conduit shall be replaced by the DBF to its original state. K. Conduits terminating in" }, { "keyword": "DBF", "context": "opperweld or be an approved equal product. R X A. DBF shall not allow any grounding connections to be p" }, { "keyword": "DBF", "context": "cally connected to both ends of the guard. F. The DBF shall exercise care to insure good ground continu" }, { "keyword": "DBF", "context": "ecessary, jumper wires shall be installed. A. The DBF shall test the ground resistance of the system. T" }, { "keyword": "DBF", "context": "fall. All test equipment shall be provided by the DBF and approved by the Engineer. Dry season resistan" }, { "keyword": "DBF", "context": "ll be warranted for onsite parts and labor by the DBF and the equipment manufacturers for a period of f" } ] }