{ "reference": [ { "keyword": "PPP", "context": "t would be required to obtain an NPDES permit per PPP 4.10-1, as well as prepare and implement a SWPPP " }, { "keyword": "PPP", "context": "h as use of filter rolls and detention basins per PPP 4.10-2. A SWPPP would require implementation of w" }, { "keyword": "PPP", "context": " quality in receiving water bodies. Additionally, PPP 4.10-3 would ensure compliance with the water qua" }, { "keyword": "PPP", "context": "implement a Stormwater Pollution Control Plan per PPP 4.10-1. As proposed, the design of the storm drai" }, { "keyword": "PPP", "context": "ted MND . 4.10.3 Applicable General Plan Policies PPP 4.10-1 As required by Municipal Code Chapter 6.05" }, { "keyword": "PPP", "context": "l be required when requested by the City Engineer PPP 4.10-2 As required by Municipal Code Chapter 6.05" }, { "keyword": "PPP", "context": "mpliant construction site per the General Permit. PPP 4.10-3 As required by Municipal Code Chapter 6.05" }, { "keyword": "PPP", "context": "pted MND. 4.13.3 Applicable General Plan Policies PPP 4.13-1 As required by General Plan Policy NE 3.5," }, { "keyword": "PPP", "context": "sed on the above analysis, with implementation of PPP 4.14-1 and PPP 4.14-2, impacts related to fire pr" }, { "keyword": "PPP", "context": "e analysis, with implementation of PPP 4.14-1 and PPP 4.14-2, impacts related to fire protection are le" }, { "keyword": "PPP", "context": "sed on the above analysis, with implementation of PPP 4.15-2, impacts related to police protection are " }, { "keyword": "PPP", "context": "the School District through the implementation of PPP 4.14-3. Pursuant to Senate Bill 50, payment of sc" }, { "keyword": "PPP", "context": " space for future residents, it would comply with PPP 4.14-4 that requires the proposed project to 19 C" }, { "keyword": "PPP", "context": "uired. 4.15.Av Other Public Services: Pursuant to PPP 4.14-2 the proposed project would be required to " }, { "keyword": "PPP", "context": "pted MND. 4.15.3 Applicable General Plan Policies PPP 4.15-1 The Project applicant shall comply with al" }, { "keyword": "PPP", "context": ", water availability, and fire sprinkler systems. PPP 4.15-2 As required by Municipal Code Chapter 3.75" }, { "keyword": "PPP", "context": "ic services that would be created by the Project. PPP 4.15-3 Prior to the issuance of any building perm" }, { "keyword": "PPP", "context": "ict following protocol for impact fee collection. PPP 4.15-4 Prior to the issuance of any building perm" }, { "keyword": "PPP", "context": "6.1 Summary of MND Conclusions 4.16.A Pursuant to PPP 4.16-1 the proposed project would be required to " }, { "keyword": "PPP", "context": "ed MND . 4.16.3. Applicable General Plan Policies PPP 4.16-1 Prior to the issuance of any building perm" }, { "keyword": "PPP", "context": "ich will expand to 5 MGD in the year 2030. 4.19.D PPP 4.19-1 applies to the Project and would reduce im" }, { "keyword": "PPP", "context": "CAL Green solid waste requirements as required by PPP 4.19-1 will ensure that construction waste impact" }, { "keyword": "PPP", "context": "ills to exceed their remaining capacities. 4.19.E PPP 4.19-1 applies to the Project and would reduce im" }, { "keyword": "PPP", "context": "ted MND . 4.17.3 Applicable General Plan Policies PPP 4.19-1 Prior to the issuance of building permits," }, { "keyword": "PPP", "context": "to the following: \u2022 Plans, Policies, or Programs (PPP) \u2212 These include existing regulatory requirements" }, { "keyword": "PPP", "context": "EQA. Any applicable Plans, Policies, or Programs (PPP) were assumed and accounted for in the assessment" }, { "keyword": "PPP", "context": "GATION MEASURE (MM) PLANS, POLICIES, OR PROGRAMS (PPP) RESPONSIBILITY FOR IMPLEMENTATION TIME FRAME/MIL" }, { "keyword": "PPP", "context": "TION TIME FRAME/MILESTONE VERIFIED BY: AESTHETICS PPP 4.1-1 As required by Jurupa Valley Municipal Code" }, { "keyword": "PPP", "context": "artment Prior to the issuance of building permits PPP 4.1-2 As required by Jurupa Valley Municipal Code" }, { "keyword": "PPP", "context": "rtment Prior to the issuance of occupancy permits PPP 4.1-3 All outdoor lighting shall be designed and " }, { "keyword": "PPP", "context": "r to the issuance of building permits AIR QUALITY PPP 4.3-1 The Project is required to comply with the " }, { "keyword": "PPP", "context": "c Works and Engineering Department During grading PPP 4.3-2 The Project is required to comply with the " }, { "keyword": "PPP", "context": " Building & Safety Department During construction PPP 4.3-3 The Project is required to comply with the " }, { "keyword": "PPP", "context": "GATION MEASURE (MM) PLANS, POLICIES, OR PROGRAMS (PPP) RESPONSIBILITY FOR IMPLEMENTATION TIME FRAME/MIL" }, { "keyword": "PPP", "context": " IMPLEMENTATION TIME FRAME/MILESTONE VERIFIED BY: PPP 4.3-4 The Project is required to comply with the " }, { "keyword": "PPP", "context": "Planning Department On-going BIOLOGICAL RESOURCES PPP 4.4-1 The Project is required to pay mitigation f" }, { "keyword": "PPP", "context": "GATION MEASURE (MM) PLANS, POLICIES, OR PROGRAMS (PPP) RESPONSIBILITY FOR IMPLEMENTATION TIME FRAME/MIL" }, { "keyword": "PPP", "context": "GATION MEASURE (MM) PLANS, POLICIES, OR PROGRAMS (PPP) RESPONSIBILITY FOR IMPLEMENTATION TIME FRAME/MIL" }, { "keyword": "PPP", "context": "GATION MEASURE (MM) PLANS, POLICIES, OR PROGRAMS (PPP) RESPONSIBILITY FOR IMPLEMENTATION TIME FRAME/MIL" }, { "keyword": "PPP", "context": "tree removal or grading permit CULTURAL RESOURCES PPP 4.5-1 The project is required to comply with the " }, { "keyword": "PPP", "context": "GATION MEASURE (MM) PLANS, POLICIES, OR PROGRAMS (PPP) RESPONSIBILITY FOR IMPLEMENTATION TIME FRAME/MIL" }, { "keyword": "PPP", "context": " be placed on the grading plan. GEOLOGY AND SOILS PPP 4.7-1 As required by Municipal Code Section 8.05." }, { "keyword": "PPP", "context": "artment Prior to the issuance of building permits PPP\u2019s 4.10-1 through PPP 4.10-3 in Section 4.10, Hydr" }, { "keyword": "PPP", "context": "issuance of building permits PPP\u2019s 4.10-1 through PPP 4.10-3 in Section 4.10, Hydrology and Water Quali" }, { "keyword": "PPP", "context": "GATION MEASURE (MM) PLANS, POLICIES, OR PROGRAMS (PPP) RESPONSIBILITY FOR IMPLEMENTATION TIME FRAME/MIL" }, { "keyword": "PPP", "context": "ced on the grading plan. GREENHOUSE GAS EMISSIONS PPP 4.8-1 Prior to issuance of a building permit, the" }, { "keyword": "PPP", "context": "GATION MEASURE (MM) PLANS, POLICIES, OR PROGRAMS (PPP) RESPONSIBILITY FOR IMPLEMENTATION TIME FRAME/MIL" }, { "keyword": "PPP", "context": " Title 24 of the California Code of Regulations). PPP 4.8-2 As required by Municipal Code Section 9.283" }, { "keyword": "PPP", "context": "e of building permits HYDROLOGY AND WATER QUALITY PPP 4.10-1 As required by Municipal Code Chapter 6.05" }, { "keyword": "PPP", "context": "partment Prior to the issuance of grading permits PPP 4.10-2 As required by Municipal Code Chapter 6.05" }, { "keyword": "PPP", "context": "suance of grading permits and during construction PPP 4.10-3 As required by Municipal Code Chapter 6.05" }, { "keyword": "PPP", "context": "the nearest sensitive receptors.\u201d PUBLIC SERVICES PPP 4.15-1 The Project applicant shall comply with al" }, { "keyword": "PPP", "context": "pancy permit as determined by the Fire Department PPP 4.15-2 As required by Municipal Code Chapter 3.75" }, { "keyword": "PPP", "context": "artment Prior to the issuance of building permits PPP 4.15-4 & 4.16-1 Prior to the issuance of any buil" }, { "keyword": "PPP", "context": "ce No. 01- 2007 and 02-2008. Page M-13 RECREATION PPP 4.16-1 Prior to the issuance of any building perm" }, { "keyword": "PPP", "context": "e of a grading permit UTILITY AND SERVICE SYSTEMS PPP 4.19-1 The Project shall comply with Section 4.40" } ] }