- / - 80 Russell Hatcher Electric, Inc. 86 Enterprise Lane P.O. Box 3291 Cleveland, GA. 30528 Office: 706-348-8052 Cell: 678-859-1528 / 770-634-1803 Date: 5/12/2025 Rockdale County Replace Service Conductors to Process Building Electrical Quotation *Ouote Pricing Good for 30 Days* RussellHatcher. Electric, Inc.1s.pleasedio offer this-quptaton on the above-mentioned project in accordance with Hugh from Rockdale County No Scope, No Spec's. (NO ADDENDUM) Included in this Scope: 1- Provide labor, tools, and material to replaçe one set ofthe service conductors to process building. 2- Install 3-500XHHW copper conductors and 1-250XHHW copper ground in 1-existing conduit all other conduits and conductors to stay in place only replacing conductors that megger showed as bad. 3- Install compression lugs on wire in transformer. 4- We will need 4-5 hours to complete this task. 5- Russell Hatcher will capture old wire to help lower the cost to Rockdale County inçluded in the quote. 6- Chip out seal offto remove conductors and once new conductors are installed replace sealing compound. 7- Swab out conduit to make sure no obstructions are in conduit 8- If damage is found to conduit Russell Hatcher Elec. will stop work and need to meet with owners about how to proceed with fixing the issue. Excluded from this Scope: 1) Opening and Closing of Main Breaker in Switch Gear that feed MCC in process building. 2) De-energizing of transformer and powering back up. TOTAL LUMP SUM: 16,360.00 Russell, Hatcher electric, Inc. Y a Wire or cable NO: 6.Sets Temperature 74 3-500 XHHw ) 5 1 250 G *XHHW 3) 6 Insulation Resistance Location of test TRF *2 te Mcc-3 Megohms Set#1. Set#2. Set#3. Set#4.) Set#5. Set#6 e OL OL 1.)Phase "A" to GND- OL OL DL OL B 2.)Phase"B" to GND 6L OL OL OL 0.20 OL 3.)Phase"C" to GND- OL OL OL OL OL 0L OL 4.)Phase"A" to Phase "B"- OL OL OL OLI OL 5.)Phase"A" to Phase "C" OL OL OL OL DL OL OL 6)Phase "B" to Phase "C" OL OL OL OL OL Mk Mibtte Ril aLE 5-9-2015 Contractorepresentuaive witnessed Date Owners Representative