DECGO VE REQUISITION FOR PURCHASE ORDER MAR 27 2025 ORIGINAL ROCKDALECOUNT), GEORGIA VENDOR QUOTATIONS REQUIREMENTS By 15,000.000 and OVER FORMAL BID/RFP PROCE CEDURE IS REQUIRED VIENDOR# 54310 P.O.# 2,500.00 TO 14.999.99 THREE WRITTEN QUOTES ATTACHED 0.00 TO 2499.99. ONE PHONE QUOTE (depts required to rotates sources) Ship To Address: 922 Court Street, Coneyrs GA 30012 VENDOR #1 VENDOR #2 VENDOR #3 Department/Account daniy Lnit Deseription Laz & Associates JLJ General Contractors Beatty Construction UNIT EXTENDED UNIT EXTENDED UNIT ENTENDED 362-1565-541305-11 I Is Install a 2-hour fire-rated wall in the Real Estate corridor at the Annex 32,337.00 32,337.00 44,287.00 44,287.00 Declined bid Building, Courthouse. to Contingency 3,233.70 3,233.70 Unit Price Contract #C-2022-150 - see emall Rusl arfecheg Om PROJECT NAME/DESCRIPTION: Real Estate New Corridor - SAC BUDGETED & NOT BU JDGETED () Email to Depart: erickgomalegrecklaleountygngo Email to Depart: michaelrobinson@rockdlaiecoumbgAgow Email to Depart: esbiling@kockdaleCountyGAgor Email to Vendor: lalazassuciatescom TOTAL 35,570.70 44,287.00 0.00 Recommended: Source of Supply: Laz & Associates, LLC Requesting Department: General Seryees Date Prepared: 03/25/25 210 Riverbrooke Terrace Covington, GA: 30016 Elected Official Date Required: ASAP CONTACT: Lazaro Rodriguez PHONE: 954-534-5439 Department Head: Procurement Manager Uise Only Below Linc Approved for preparation of Purchase Order Award to be made to: (In not low quotation, indicate reason): Date chas--Assers Accounting emçer 32825 331as Ym REQUISITION FORM RevisedA/1772025 Ssig p/aspP spal taloah porE LAZ & ASSOCIATES, LLC PROPOSAL General Contractors, GCCO 006652 210 Riverbrooke Terrace Covington, GA 30016 C: 954.534.5439 zelczasocldles.com DATE: 03.20.25 ATTENTION: Mr. Erick Gonzalez, JAC Projects Coordinator PROPOSAL TO: Rockdale County Dept. of General Services PROJECT: Rockdale Courthouse 1FL 2-Hour Rated Corridor at Real Estate LOCATION: 922 Court Street NE, Conyers, GA: 30012 Pery your request, we are pleased to submit our proposal/d contract for the sum listed below: (proposal is based on: scope of work & drawing provided by Mr. Erick Gonzalez/garash! Designs, drawings dated 01.19.20 Payment Terms: Invoice shall be submitted based on work completed DESCRIPTION OF WORK: Protect area during construction & setup a 'plastic containment" of area prior to commencement Demolition of door portions of existing wall, celling grid/tile, light fixtures, flooring/base & relocation of existing empty shelving/fle cabinets as noted Remove & reinstali existing binders, books, etc, for each shelf or storage bine deemed to be relocated isi included Remove, haul, & discard construction related debris from sitei is included Patch & repalr existing walls affected by new work Furnish & install new 2-hr wall inclusive of framing, mineral wool insulation, multiple layers of 5/8" type 'x drywall & finish walls ready for paint - walls tol be 12-0" high as indicated Furnish & Install Armstrong Cortega 2x2' square edge lay-n tile with 15/16" white grid suspended from structure above for corridor Repair existing celling grid/lilei in real estate side is included Furnish & install fre caulking as needed for all penetrations through fire new wall Furnish & Install paint to walls, door frames, & door stain as Indicated Furnish & install 4" vinyl baseboard lo new wall is Included Furnish &i instal! 3-0" x6-8, 6p panel metal with KD hollow metal frames & commercial grade hardware/passage lever handles Re-hang existing door with piano hinges as indicated Furnish & Install suppiy grillductworki including fire damper for ductwork penetrating thei fire wall Furnish &i install electrical wiring for (4) outlets, (6) exit signs, and relocate existing lights as indicated Relocate shelving/file cabinets as Indicated on plans is included Excluded - low voltage, unforeseen ltems, bond insurance, concrete x-ray, fire sprinklers, fire alarm, concrete cutting/repairs, mechanicalelectical beyond scope noted, flooring, & utlity locate Clean up of construction-telated debris is included = final cleaning by others Defined scope of work shall take 2-3 weeks to complete GCoverhead & proiit Is included Total Amount: $32,337.00 Notes: This proposal is good for 15 days from date of issuance because material prices are fluctuating Any altsration or deviation from the above specifications, involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the proposal We appreciate the opportunity to bld this job and look forward to working with you ini the very near future. Should you have any questions, please do not hesitate to contact me al 954-534-5439. Sincerely, Lazaro J. Rodriguez, MGMR