FSM, Inc. P.O. Box 1908 Proposal Frederick, MD 21702 PROPOSALNO. 41125 SHEET NO. DATE Andrew J. Bowen 4/11/2025 PROPOSAL SUBMITTEDTO: WORKT TO BEF PERFORMED AT: NAME ADDRESS Town of Boonsboro Chase Six BLVD ADDRESS Boonsboro MD DATE OF PLANS PHONEI NO. ARCHITECT Wel hereby propose to furnish the materials and perform the labor necessary for the completion of 1) Layout and Paint using Sherwin Williams Acrylic Traffic Paint: a) All designated Double Yellow Center Line and White Turn Lane line = $1,750 2) Layout and Install using machine applied thermoplastic: a) All designated Stop Bars = $550 3) 9 - Directional Arrows Option 1: Paint = $900 Option 2: Thermoplastic =S $2,700 TOTAL 45,000.0 Opnew #2 All material is guaranteed to be as specified.and the above work to be performed ina accordance with the drawings and: specifications submitted for above work and completedi ina a subslantial workmanlike manner for the sum of see above Dollars ($ see above withy payments tot be made as follows. (net 30) NOTE: PRICE INCLUDES ONE MOBILIZATION WORKING ON REG. WORK DAY HRS. 8AM TO 5PM. MONDAY THRU FRIDAY. AFTER HOURS OR WEEKEND WORK. ADD $750 AFTER ONE, MOBILIZATION, ADD $350 PER Mwyawaacrcaakons MXgACN MIeaeyeasAsalaemaldw, Respectfully Connor Stemple over and above the estmate. AI agreements contingent uçons strkes. submitted. soanisrespteguseure control.. FSM INC Per. Note- piwwmdatretnt accopted within, 90 days. ACCEPTANCE OF PROPOSAL The above prices, specifications, and conditions are satisfactory and are hereby accepled. You: are authorized to dot the work as specified. Payments willl be made as outlined above. Signature. Date Signature. a adams 08118 3-12