BUILDING PERMIT APPLICATION Jurisdiction of Applicant to complete numbered spaces only. JOB ADDRESS LEGAL LOT NO. DESCR. OWNER CONTRACTOR ARCHITECT OR DESIGNER ENGINEER 6 LENDER 7 USE OF BUILDING 8 Class of Work: 9 Describe Work: 10 Change of use from Change of use to 11 Valuation of Work: $ SPECIAL CONDITIONS: BUK TRACT MAIL ADDRESS MAIL ADDRESS MAIL ADDRESS MAIL ADDRESS MAIL ADDRESS D SEE ATTACHED SHEET) ZIP PHONE PHONE PHONE PHONE LICENSE NO. LICENSE NO. LICENSE NO. BRANCH NEW ADDITION ALTERATION REPAIR MOVE REMOVE PLAN CHECK FEE Type of Const. Size of Bldg. (Total) Sq. Ft. Fire No. of Dwelling Units Special Approvals Required HEATH DEPT. FIRE DEPT. OTHER (Specify) PERMIT FEE Occupancy Group No. of Stories Use Zone OFFSTREET PARKING SPACES: Covered Division Max. Occ. Load Fire Sprinklers Required Yes n No Uncovered Not Required APPLICATION ACCEPTED BY PLANS CHECKED BY APPROVED FOR ISSUANCE BY Zone NOTICE Recieved SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, ZONING VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTED OR WORK IS SUSPENDED OR ABANDONED FOR A SOIL REPORT PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPILED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF FOOTER A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATER OR LOCAL LAW REGU- FOUNDATION LATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. FRAMING COMMENCED. INSPECTIONS FINAL SIGNATURE OF CONTRACTOR OR AUTIORZED AGENT SIGNATUE OF DATE DATE CASH BUIDER WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALDIATION CK. M.O. PERMIT VALIDATION CK. M.O. CASH