PUBLIC NOTICE City of Lockhart Historical Preservation Commission 5:30 p.m. Wednesday, August 2,2023 Municipal Building - Glosserman Room 308 West San Antonio Street AGENDA 1. Call meeting to order. 2. Citizen comments not related to an agenda item. 3. Consider the minutes oft the. July 19, 2023 meeting. 4. CFA-23-26. Considera a request by Alexander Smith of 3rdRock Electrical Contractors, LLCI for approval of a Certificate for Alteration for the replacement of electrical meter cans, panels, and risers on part of Lot 4, Block 22, Original Town of Lockhart, zoned CCB (Commercial Central Business) and located 5. CFA-23-27. Consider a request by William Wachel, P.E., of the City of Lockhart, for approval of a 6. Discuss the date and agenda oft the next meeting, including Commission requests for agenda items. at 117 North Main Street. Certificate for Alteration for the Lockhart Downtown Revitalization Project. 7. Adjournment. Posted on the bulletin board in the Municipal Building, 308 West San Antonio Street, Lockhart, Texas at 10:30 a.m. on the 27th day of July, 2023. City of! Lockhart July 19, 2023 MINUTES Historical Preservation Commission Members Present: Christine Ohlendorf, Ray Ramsey, Michel Royal, Ronda Reagan, Kevin Thuerwaechter Members Absent: John Lairsen, Ron Faulstich Staff Present: Kevin Waller, Yvette Aguado, David Fowler Public Present: Marty Spellerberg (Applicant, Agenda Item 4), Shawn Martinez 1. Callmeeting to order. Vice-Chair Reagan called the meeting to order at 5:30 p.m. 2. Gitizen.comments not related to an agenda item. None 3. Consider the minutes of the. July 5,2023, meeting. seconded, and the motion passed by a vote of5-0. Vice-Chair Reagan moved to approve the minutes as presented. Commissioner Thuerwaechter 4. CFA-23-25. Consider a request by Marty Spellerberg for approval of a Certificate for Alteration for a new window on the rear buildingf fagade.therepitching oft ther roof from the east to west sides, and replacement of the roof with a newn material on part of Lot 4,Block 19, Original Town of Lockhart, zoned CCB (Commercial Central Business) and located at Planning Staff Kevin Waller provided a brief overview of the proposal. He reported that the applicant proposes a new window, which includes replacing ane exhaust fan within what appears to be al historic window opening at the center oft the second story at the reari façade, to include a wooden casement with a single pane of glass. In addition, the roofwillbere-pitched ina al low spot near the center of the building to correct a standing water issue. Finally, the existing ethylene propylene diene monomer (EPDM) rubber roof material will be replaced with a white Applicant Marty Spellerberg, 6312 Woodhue Dr., Austin, discussed details of the project and Mr.Shawnn Martinez, 523 Cibilo! St., Lockhart, the general contractor fort the project, came forward to provide additional details and responded to questions from the Commission. Commissioner Ramsey moved to approve CFA-23-25 as presented. Commissioner Roya/seconded, 103 South Main Street. thermoplastic polyolefin (TPO) material. Staffrecommends: approval. answered questions from the Commission. andt the motion passed by a vote of5-0. -1- Historical Preservation Commission Meeting 07-19-2023 5. Presentation by City Engineer Will Wachel and discussion on the downtown improvements project. City Engineer Will Wachel, TRCI Engineers, provided an overview oft the downtown improvements project. The improvements generallyinclude the update of aging water and: sewer infrastructure, the upgrade and modernization of the downtown streetscape and drainage, providing pedestrian-friendly spaces, improving traffic flow and safety, preserving the number of parking Discussion ensued between the Commission and Mr. Wachel regarding parking spaces (no net loss), as well as the proposed sidewalk replacements, street resurfacing, and drainage Vice-Chair Reagan inquired as to how the trees in the centeri island medians along South Main Street, East Market Street, and South Commerce Street would be preserved, of which growth is Mr. Wachel explained that he would bring this concern up with his team, and work to find a Discuss the date and agenda of the next meeting, including Commission requests for agenda Mr. Waller stated that the next regularly scheduled meeting would be held August 2nd, with one Vice-Chair Reagan suggested ai future agenda item to address an intrusive vine that is obscuring electrical panels and creating a hazard for multiple buildings in the pocket park area at the Mr. Fowler replied that this is more of a code enforcement issue than a Commission item to spaces, and enhancing the overall aesthetic of downtown. improvements. currently stunted, due primarily to excessive topsoil cover. solution as the project progresses. items. application submitted by the deadline. northeast corner of San Antonio Street and Main Street. review, and that he would report to the proper: staff. 7. Adjournment. Commissioner Ohlendorf moved to adjourn the meeting, and Commissioner Royal seconded. The motion, passed by a vote of5-0, and the meeting adjourned at 6:57p.m. Approved: (date) Yvette. Aguado, Recording Secretary John Lairsen, Chairman -2- Historical Preservation Commission Meeting 07-19-2023 RHD 218 221 CHB 203 216 208 204 215 CMB 107 EWALNUTST 104106 109 WWALNUTST 104 119 119 N 9 119 117 115 113 107 105 118 N M 112 110 5 108 106 115 118 115 112 CCB 119 color 0) a8 ESAN ANTONIOS ST He 207 w BANMATONDET 101 103 105 111 s s 120 202 CFA-23-26 Subject Property Zoning Boundary scale 1"= 100' 117 N MAIN ST. : 19 N. Menia S+. REPLACE ELECTRICAL METER CANS, PANELS, AND RISERS STAFF REPORT CASE SUMMARY CERTIFICATE FOR ALTERATION STAFF: Kevin Waller, Historical Preservation Officer / Senior Planner kw/ CASE NUMBER: CFA-23-26 REPORT DATE: July27,2023 MEETING DATE: August 2, 2023 STAFF RECOMMENDATION: Approval CONDITIONS: None BACKGROUND DATA APPLICANT'S REQUEST: Replacement of electrical meter cans, panels, and risers APPLICANT: Alexander Smith, 3rd Rock Electrical Contractors, LLC OWNER: Kent Black, KBCB Investments, LLC SITE LOCATION: 117 and 119 N. Main St. EXISTING USE OF PROPERTY: Commercial PROPOSED USE OF PROPERTY: Same LEGAL DESCRIPTION: Part of Lot 4, Block 22, Original Town of Lockhart ZONING CLASSIFICATION: CCB (Commercial Central Business) ANALYSIS OF ISSUES PROJECT DESCRIPTION: The applicant proposes to replace the electrical paneling components visible on the north wall façade of the building facing West Walnut Street. The specific components to be replaced include electrical meter cans, panels, and risers, which will slightly alter the designa and overall appearance of the existing components. Currently, there are three separate meter cans, panels, and risers on the north façade. Of these three, the centrally located cluster will be removed entirely, with the other two to be replaced. A diagram with specifications of the new electrical panels, as well as photos of the existing COMPATIBILITY: This project will not have adverse impacts on the Courthouse Square, and will replace aging components with new equipment that will improve the electrical units' overall appearance. COMPLIANCE WITHSTANDARDS: Although there are no design guidelines fori the proposed improvements in the Historic Districts and Landmarks Ordinance, the improvements are subject to approval of this components, are included with your agenda packet materials. Certificate for Alteration and the issuance of building and electrical permits. ALTERNATIVES: None necessary. 715/23,5:01PM MG_1638.jpg tefea D19 -EAso eectrien Pameks- 7/5/23, 5:02PM MG_1640.jpg SONISI -EAs Pactrien panes 7/5/23, 5:13PM kxarsemsterscommescikaupawhsiottasenTsw, e ( -E-immpe imge o Propesea Work ELLIOTT ELECTRIC SUPPLY 212 Lucinda We Deliver..Lower Cost, Quality Products, & Personal Service Fax: 830-626-8075 78130-0000, TXI New Braunfels Phone: 830-626-6880 JustinSpencer@eliottelectric.com CH24B200INT Panel Eaton Corp Catalog Number Manufacturer Description Weight per unit Product Category Features amperage. rating Coil Voltage Cord Type media number of spaces Material, Color, and Finish Color CH24B200INT Eaton Corp CSR 2.7 (Ibs/each). 20210706150443 Eaton CH Oem Interior Assembly, CH 3/4-Inch Main Breaker Oem Loadcenter Interior, Single-Phase, 24 CKTS, 24-Pole, 200A, Type STRGHT BLADE PLG&CONNEC 12.0000 IN X 12.0000 IN X 6.0000 IN Institutional Buldng/Snwtues-Oher Commercial, / Institutional Buildings /Structures - Commercial/ Yes 45A Generation Renewable Energy- Alternative EnergyOtnerdeneration. Conventional Energy- Conventional EnergyDatacenters IT Space: Cland Hyper ConvergedMarine Vessels and Equipment - Marine Vessels and Equipment Other material composition Dimensions and Weight Size Not Applicable EPDM Rubber Construction- Fully Shielded and Fully Submersible fora a' Variety of Applications. IEEE 386 Interfaces Provide Convenient Energized Connection with other 200 Amp Loadbreak or Deadbreak Components. Compact Size Enables Installation in your Existing Cabinetry, Saving you Money. Number 4 AWG Ground Lead' Tethered to the. Jacket Withstands 10,000 Amps for 10 Cycles without Fusing. Ground Lead Also Controls ENd Plug when Ejected, Preventing Uncontrolled Trajectory and Maintains the Housing Shield ELLIOTT ELECTRIC SUPPLY 212 Lucinda Wel Deliver..Lower Cost, Quality Products, & Personal Service Fax: 830-626-8075 78130-0000,TXM New Braunfels Phone: 830-626-6880 JustinSpencer@eliottelectric.com Descriptions Description extra long description Features PANEL ETN CH24B200INT OEM Interior 24: spa Eaton s CH 3/4-inch loadcenters enclose CH circuit breakers for power distribution and circuit protection in residential and light commercial applications. Also called al breaker box, electrical box or even a fuse box, the maini function is to take electricity supplied by the utility and distribute it throughout the home to feed lights and receptacles. Covers are typically packaged separately and available as surface or flush mount. Eaton CH OEM interior assembly, CH 3/4-inch Main Breaker OEM loadcenter interior, single-phase, 24 ckts, 24-pole, 200A, Type Long Description Product Type Special Features Manufacturer Information Brand. GTIN series sub brand UPC CSR 45A Eaton Corp 00786689647544 CH24B200INT Open Office, Retail Open Office, Retail 786689647544 Oem Interior 24 Space, 200a Manufacturers Part Number Taxonomies, Classifications, and Categories Category Description Trade Size aperture size Packaging Carton Package Weight Per each Application Pole. Line Construction Material & Equipment ULI Listed,EUSERC Approved 1 20 2.7 Uses, Certifications, and Standards Stationary Machinery and Equipment Outside Factory- Stationary Machinery and Equipment Outside Factory Other ELLIOTT ELECTRIC SUPPLY 212 Lucinda We Deliver..Lower Cost, Quality Products, & Personal Service Fax: 830-626-8075 78130-0000,1 TXN New Braunfels Phone: 830-626-6880 ustinspencer@eliottelectric.com GAL2 2" Rigid Conduit Republic Con-Nucor Tube T 2" Catalog Number Manufacturer Description GAL2. Republic Con-Nucor Tube Electrical Metal Conduit, Electrical Raceway System Application, Blue (Cap) Color, 2.067 In;52.50 MM Conduit Inner Diameter, 2.375 In;60.33 MM Conduit Outer Diameter, Hot Dip Galvanized Finish, 9 FT111 In Length, Made In Usa, Steel Material, 100 CT Package Quantity, Superior Protection, Strength, Safety and Ductility For Your Most Demanding Wiring Job Special Features, Ansi/Nema Standard;File #E79211;UI 1242;UI Standard Standards Met, 2 In;53 MM Trade Size, 3.52 LB/FT Weight Weight per unit Product Category Descriptions Description Manufacturer Information Brand 3.5(Ibs/ft) GRC Conduit 2" RIGID CONDUIT Conduit GRC Conduit 10 10 600 3.52 Taxonomies, Classifications, and Categories Category Description Availability minimum qty Packaging Carton Package Weight Per foot CERTIFICATE FOR ALTERATION APPLICATION DATE RECEIVED: W6/73 DATE APPROVED: CERTIFICATE NUMBER: CA-23-AG NOTE: An approved Certificate For Alteration (CFA) is required by City Code for all signage, construction, alteration, or modification of property designated as Historic, ifsucha activities will change the architecture, design, finishes orc outward appearance ofal building, structure, object, site, or area asv viewed from the exterior. (Ord.93-19, Sec. 11a and 12). A City Sign Permit and/or City Building Permit maya also ber required byt the City Code. ONLYF FULLY COMPLETED APPLICATIONS WILL BE ACCEPTED Aleranlv ELe Applicant Mailing Address Lockhowt Telephone Person Work Doing Legal Property Description Property Street Address ProperyCiyZoningDesignations Owner_ Property Mailing Address Locl-ht Blek kent 706 Lawfana PN 16213 ZISN MA SH 1X78644 7P4EE9Zn $725W9283 3mRekLlahe/ Part Slro OgimTm Estimated Cost Le A, Bsk 37, L-khvh 17A Mayi s : 19 N. Nin 54. ccB LocationMapAtached PHOTOS ARE REQUIRED SHOWING ALL THE AREAS TO BE AFFECTED BY THE WORK DESCRIBED: Include photos of: Area ofWork_ FullE Elevation Showing Area Affected andlor Site_ Description of Proposed Work Zellaee ICH/CAMPu n Riger on Borldp Eleclac -Work to pe oche sw verh plbin Paeade Please Attach Scope of Work Questionnaire! - Attach Sketcheslustrations. Are Detailed Plans Available? REQUIRED SIGNATURES: Beforer me the undersigned authority, ont this day appeared and solemnlys swears, that the statements above and attached concerning the above-described property aret true-andthatlhei is authorized toa acta as ana agent inprocuring the certificate requested,, Applicant A722 Property Owner Signature: Kent Back Historical Preservation Officer Approval: Historical Preservation Commission: Date: W-28-43 Date:_ 7-5-83 Date: Date: AC Certificate ForA Alteration is validt fora a period concurrent with the Building Permit granted fort thep proposed work, or a period nott toe exceed 18r months. Certificate No. CFA-23-2G Page2of_ Reviewed:. CERTIFICATE FOR ALTERATION SCOPE OF WORKQUESTIONMARE kw/ Thef following questions must be answereda andt thef form completed byt the applicant fora ac Certificate For Alteration. This questionnaire: shallb be attachedt to anya applicationf for Certificate For Alteration. The Lockhart Historical Preservation Officer shalli independently" verify alli information provided ont the application andt the attached questionnaires. The Lockhart Historical Preservation Officer shall reviewt the applicationa andt this questionnairei ina ane expedient manner andr notifyt thea applicant ofti theo outcome ofther review. TheLockhart Historical Preservation Officer may approvet the Certificate For Alteration priort toa commission! hearing. based upon adequacy oft the information provided andv verification oft thes scope ofv work Additionali informationr may ben neededt too complete the applicationa and review process. Final reviewa anda actionont thea applicationf for Certificate For Alteration byt theL Lockhart Historical Preservation Commission atap properly scheduled public hearingr may ber required. Any requirede explanations! to answersg givens shallb beinwriting anda attached. Yes No Verified Scope OfWork Questions Section One fw 1. Is this application for construction or alteration on or at aj property which is in al Historic kw 2. Is this application for any construction or alteration work thati is NOT described or defined as kw/ 3. Will the construction or alteration covered by this application include any work visible from the District or a designated Historic Landmark? Whati is its zoning designation? CBHL?_ H?V ordinary maintenance of al historic property? Isi it more than limited' "Ordinary Maintenance"? 4. Will the construction or alteration covered by this application remove or, physically change any structural elements oft the property? (i.e. Interior or exterior: load bearing walls, columns, posts, 1. Is the construction or alteration covered by this application considered an emergency repair of [ow 2. Is the construction or alteration covered by this application considered necessary to correct a / exterior oft the property? foundations, footings, etc.) X Kw Kw Section Two accidental sudden, or unforeseen property damage? When did damage occur?. circumstance that endangers al building, business, owner, or the public? 3. Is the construction or alteration covered by this application considered permanent, to be in place more than 90 days? (At temporary construction or alteration is required to be removed within 90 days and the property is to be returned to the original or agreed upon condition.) lw 4. Has a permit been issued for any of the proposed work? Date: Permit No. kw/ Has any work actually started? Describe: Section Three / X gw 1. Will the construction or alteration covered by this application make a physical change to any design elements, features or finishes visible from the exterior of the property? kw 2. Will the construction or alteration covered by this application repair or replace an element of the building or property with a material different fromi the original material of that element? 3. Will the construction or alteration covered by this application include painting exterior surfaces Kw) 4. Does the construction or alteration covered byt this application include demolition or removal of kw 5. Will the construction or alteration covered by this application make any change in the have kw that not been previously painted? X X any part or element oft the property visible from the exterior oft the property? appearance of the property as viewed fromt the exterior oft the property? The undersigned owner or authorized agent attests that the statements made above and on any attached explanations are true and agrees that this Scope Of Work Questionnaire and any attachments shall become a part of the application and the Certificate For Alteration cited and will be the limit of construction andlor alteration work undertaken. Further, consfruction willr nots start priort to authorization byt the approval ofthe Certificate For Alteration. Applicant Signature: Date: Date: Par M G-28-23 Verified By: KennWAlas Date" /3/23Action: 205 RHD 208 CMB 221 216 218 208 204 N € CHB 203 200 215 IH EWALNUTST 215 109 119 118 112 119 LEWACNUTSI 120 107 115 CHB 111 po 201 WWALNUTS ST 4 212 115 6 104106 119 12 104 119 118 117 115 113 107 105 115 315 31 301 100 C 112 105 4 201 F00206 181 702 102 04 CHB 207 202 215 20/216219 CCB 217 120 111 5 110 119 207 203 205 212 211 216 217 218 300 301 315 308 317 13 111 201 202 EMARKEIST 1171 sr 118 2 200 206 208 275 210 212 219 ERRAIRIEL 201 CHB 200 lightbox 210 30 LEAST 200 207 6A p5 301 321 209 w PRAIRIEI LEAST 303 311 313 CMB 202 300 208 216 310 107 RMD 317 CHB CFA-23-27 Subject Property Zoning Boundary scale 1"= 200' LOCKHART DOWNTOWN REVITALIZATION PROJECT STAFF REPORT CASE SUMMARY CERTIFICATE FOR ALTERATION STAFF: Kevin Waller, Historical Preservation Officer /Senior Planner Kw CASE NUMBER: CFA-23-27 REPORT DATE: July27,2023 MEETING DATE: August2, 2023 APPLICANT'S REQUEST: Various downtown improvements proposed for the Lockhart Downtown Revitalization Project. STAFF RECOMMENDATION: Approval CONDITIONS: None BACKGROUND DATA OWNER: City of Lockhart APPLICANT: William Wachel, P.E., City of Lockhart SITE LOCATION: Downtown Lockhart, generally within the Courthouse Square Historic District ZONING CLASSIFICATION: CCB (Commercial Central Business) ANALYSIS OF ISSUES PROJECT DESCRIPTION: The Lockhart Downtown Revitalization Project includes various needed public improvements to the Courthouse Square, an overview of which was presented at the Commission's July 19, 2023meeting. These improvements, currently in the advanced design stage, include the replacement oftheunderground infrastructure int the downtown area, replacement ofsidewalks to include the addition of curb bump-outs at intersections, and replacing the center island medians along San Antonio Street, Commerce Street, Market Street, and Main Street to include new landscaping. Street pavement will be replaced within the project area as well, with the pavement project limits to end at Walnut Street to the north, Church Street to the west, Prairie Lea Street to the south, and Colorado Street to the east. The crosswalks and sidewalk bump-outs will utilize masonry pavers on alle ends of the four street intersections surrounding the County Courthouse building. The improvements will involve the reconfiguration of parking spaces downtown, which will result in a net loss of 8 spaces and maintain the current diagonal parking layout. North Main Street and North Commerce Street, and South Main Street and South Commerce Street south oft the Market Street intersection, will become one-way streets to enhancet traffic and pedestrian safety. Visual renderings are included with your agenda packet materials. COMPATIBILITY: This project will greatly enhance the appearance of the Courthouse Square and downtown area, and will also improve safety conditions for vehicular and pedestrian traffic alike. COMPLIANCE WITHS STANDARDS: Although there are no design guidelines for the proposed improvements in the Historic Districts and Landmarks Ordinance, the improvements are subject to approval of this Certificate for Alteration and the issuance of all necessary approvals and permits. Section 28-11(a) oft the Historic Districts and Landmarks Ordinance specifies that those projects requiring a Certificate for Alteration also include those that will change the outward appearance of a "..site, area, or district." Further, Section 28-10(e)(1) provides that a Certificate for Alteration is required for a physical change in exterior elements, design, and finishes from grade level, including sidewalks, steps, and paving. Its should be noted that due to the advanced stage of project design, the Commission is free to provide recommendationsto: City Council to assist the Council in makingac decision, but should refrain from adding conditions of approval. ALTERNATIVES: None necessary. B ISE BOHBWIOO SNIVW D I - - 5y 5u - S U3 3OUBWWOO NIVW BOHEWIOO NIVW CERTIFICATE FOR ALTERATION APPLICATION DATE RECEIVED: /26/23 DATE APPROVED: CERTIFICATE UMBERCFAPAS-A) NOTE: An approved Certificate For Alteration (CFA) is required by City Code for alls signage, construction, alteration, or modification of property designated as Historic, ifsucha activities will change the architecture, design, finishes or outward appearance ofa building, structure, object, site, or area as viewed from the exterior. (Ord.93-19, Sec. 11and1 12). A City Sign Permit andlor City Building Permit may also ber required byt the City Code. ONLY FULLY COMPLETED APPLICATIONS WILL BE ACCEPTED Applicant Cityo ofLockhart Mailing Address Telephone Property Owner Cityo ofLockhart Mailing Address Telephone 512.398.3461 Estimated Cost 308 W. San Antonio St. Lockhart, TX 78644 308 W. San Antonio St. Lockhart, TX78644 512.398.3461 Person Doing Work_ Contractor- Not Publicly Bid Yet $9.67 MM Total Project Cost Downtown! Lockhart Property Legal Description Property Street Address PropertyChyZoningDesignations Include photos of: Area ofWork_ Downtown Lockhart centered around Caldwell County Courthouse CCB LocationwapAttacned yes PHOTOS ARE REQUIRED SHOWING ALL THE AREAS TO BE AFFECTED BY THE WORK DESCRIBED: FullE Elevation Showing Area Affected and/or Site x Description of Proposed Work The project includes replacing the aging, underground infrastructure in the downtown area. The scope also includes the replacement of sidewalks, adding curb-bump outs at + intersections, and adding medians along San Antonio, Main, Commerce, and Market streets around the Caldwell County Courthouse) to increase safety and to meet Texas Accessibility standards. Street pavement will be replaced within the project area, and the pavement limits will end at Walnut, Church and Prairie Lee streets New pavement striping will meet current parking standards within the State of Texas, and landscaping will be included to beautify the area. The project will not alter any ofthe historic building structures in the downtown area. wR * ENSS -e 'c.G-w. Ww, of Please Attach Scope of Work Questionnaire/ Attach Sketchesllustrations. I71 Are Detailed Plans Available?D REQUIRED SIGNATURES: Before me the undersigned authority, on this day appeared and solemnly swears, that the statements above and attached concerning the above-described property aret true andt that (s)hei is authorized toa act as ana agent inprocuringt the certificate requested. Applicant Signature: Property Owner Signature: Historical Preservation Officer Approval: Historical Preservation Commission: William Wachel Date: 07/26/2023 Date: Date: Date: A Certificate For Alteration isv valid fora ap period concurrent with the Building Permit grantedf fort thep proposed work, or aj periodr nott to exceed 18months. CERTIFICATE! FORALTERATION SCOPEOFWORK QUESTIONNAIRE Page2 Certificate of L No. Reviewed: SABAY Thef following questions must bea answered andt thef form completed by the applicantf fora a Certificate ForA Alteration. This questionnaire shall be attachedt to anya application for Certificate ForA Alteration. The Lockhart Historical Preservation Officer shalli independently" verify alli informationp provided on the application andt thea attached questionnaires. Thel Lockhart Historical Preservation Officer shall reviewt thea applicationa andt this questionnaire ina ane expedientr manner andr notify the applicant oft thec outcome oft ther review. Thel Lockhart! Historical Preservation Officer maya approvet the Certificate For Alterationp priort toad commission! hearing, based upon adequacy of thei informationg provided andv verification oft thes scope ofv work. Additionali information may ben neededt to completet the applicationa and reviewp process. Final reviewa anda action ont thea applicationf for Certificate ForA Alteration by theL Lockhart Historical Preservation Commission ata aproperly scheduledp public! hearingr may ber required. Any requirede explanations toa answers givens shallb beinw writing anda attached. Yes No Verified yew Scope OfWork Questions Historic Landmark? Section One 1. Is this application for construction or alteration on or ata property which is inal Historic k 2. Is this application for any construction or alteration work that is NOT described or defined as p 3. Will the construction or alteration covered by this application include any work visible from the District or a designated What is itsz zoning designation? CCBHL?_ H?V ordinary maintenance ofa al historic property? Isi it more than limited' Ordinary Maintenance"? 4. Will the construction or alteration covered by this application remove or, physically change any structural elements of the property? (ie. Interior or exterior: load bearing walls, columns, posts, exterior of the property? foundations, footings, etc.) kn/ Section Two kr 1. Is the construction or alteration covered by this application considered an emergency repair of sudden, accidental or unforeseen property damage? When did damage occur?, 4w 2. Is the construction or alteration covered by this application considered necessary to correct a circumstance that endangers al building, business, owner, or the public? 3. Is the construction or alteration covered by this application considered permanent, to be in place more than 90 days? (At temporary construction or alteration isr required to be removed within 90 days and the property is to be returned tot the original or agreed upon condition.) 4. Has ap permit been issued for any of the proposed work? Date: Permit No. r Has any work actually started?. No Describe: Section Three kw 1. Will the construction or alteration covered by this application make a physical change to any V KN 2. Willt the construction or alteration covered by this application repair or replace an element oft the design elements, features or finishes visible from the exterior of the property? building or property with a material different from the original material of that element? 3. Will the construction or alteration covered by this application include painting exterior surfaces k 4. Does the construction or alteration covered by this application include demolition or removal of knl 5. Will the construction or alteration covered by this application make any change in the that have been not kw previously painted? any part or element of the property visible from the exterior oft the property? appearance of the property as viewed from the exterior of thep property? The undersigned owner or authorized agent attests that the statements made above and on any attached explanations are true and agrees that this Scope Of Work Questionnaire and any attachments shall become a part oft the application and the Certificate For Alteration cited and will be the limit of construction and/or alteration work undertaken. Further, construction willr nots start priort to authorization byt the approval ofthe Certificate For Alteration. for the City of Lockhart Mlinoadly Date: 07/26/2023 Date: Applicant Signature: Verified By: MAwALowMAAs