VILLAGE OF MARVIN 10004 New Town) Road Marvin, NCI 28173 Tel: (704)843-1680 IF Fax: (704)8 843-1660 www.marvinnc.org VILLAGE COUNCILN MEETING MINUTES March 9, 2021 -5 5:30pm Village Hall, 100041 New Town Road Budget Work Session (Virtual Meeting) AGENDA ITEM 1. Call to Order Mayor Pollino called the meeting to order at 5:35pm and determined a quorum was present. Present Virtually: Mayor Pro' Tem Vandenberg, Councilman Lein, Councilman Marcolese Staff Present: Christina Amos, Austin W. Yow, Rohit Ammanamanchi, Jamie Privuznak MOTION: Councilman Wortman moved to allow Councilmembers to participate remotely. MOTION: Mayor Pro Tem Vandenberg moved to adopt the agenda as presented. Present: Mayor Pollino, Councilman Wortman Absent: None 2. Consider Allowing Councilmembers tol Participate Remotely VOTE: Thei motion passed unanimously. 3. Adoption of the Agenda VOTE: The motion passed unanimously. BUDGET WORK SESSION- - FY2 2021-2022 TIME: STAMP: 2:05 1. Discussion and Consideration of CIP FY 22-26 Ms. Amos recapped recent changes to the proposed Capital Improvement Plan for FY 2022-2026. Councilmembers discussed parks andi recreation, greenway, administration, and road projects in depth. (See attached Capital Improvement; plan, whichi is hereby incorporated as arefèrence into these minutes). VOTE: The motion passed unanimously. TIME STAMP: 23:00 2. Discussion of FY21-22 Budget MOTION: Councilman Wortman moved to approve the Capital Improvement Plan as presented. Ms. Amos distributed the draft budget, as well as documents regarding revenue neutral property tax rates and Powell Bill revenue: and expenses. (See attached documents, which are hereby incorporated as references into these minutes). She discussed each revenue: and expenditure line item, as well as the balance and allocation of] Powelll Billi funds fori road projects with Council. ADJOURNMENT MOTION: Councilman Wortman moved to adjourn thei meeting at 6:31pm. VOTE: The motion passed unanimously. 4-13-21 Adopted: 810 0001 OF I SaE SEAL N.C. hih - Austin W. Yow Village of Marvin Village Clerk & Assistant to the Manager Page1!1 I+em 1 3 3 8 de 6A 6A 6A $A SA 6A 6A 6 6A S 6A $A $A $ $A $ S VILLAGE OF MARVIN CAPITAL PROJECT: REQUEST FY 2022-2026 PARKS AND RECREATION R Department: Fund: General Fund/Capital Project PROJECT TITLE: Trailer and Storage Building Storage building and trailer purchase PRIORITY: PURPOSE: Purchase/ Expand PROJECT: DESCRIPTION JUSTIFICATION With the growth oft the Village amenities, the need for maintenance equipment is expected to grow. This item would fund thej purchase of as small storage building and trailer tol bel housed in the building. The storage building could potentially store tables and chairs that the park could rent for additional revenue. UPDATE: Modified per 2/19/21 retreat to add two bay shelter. CAPITAL COST PER YEAR CAPITAL COST BREAKDOWN COMMITTED PRIORTOFY20- 21 FY2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY2025-26 FUTURE YEARS TOTAL PLANNING, DESIGN, AND ENGINEERING $ PURCHASE CONSTRUCTION MISCELLANEOUS OTHER: OTHER: OTHER: TOTAL 5,000 CURRENT] REVENUE 30,000 CURRENT REVENUE $ $ 5,000 30,000 $ $ 35,000 $ 35,000 DESCRIPTION OF SOURCE. ESTIMATE: Based on Staff's online research ofi retail cost for comparable products. REQUESTED BY: DATE: Department Head 3 peoH queuredea LVG :X8 AISINOTR "S1S00 uopon.suoo elurs uo peseq ssen8 pajeonpo sJJe1s LVIAILS DOHnOS JO NOILIRDSIQ 000'0Z $ IVLOL HLO HLO AHLO S1OANVTADSIA $ NOLNRLISNO) ISVHDANd ONIISNIONI GINV 'NSISTG 'ONINNVId 000'0z $ TVLOL SHVIX danLa 92-920Z. Ku S7-VZOZA VC-EZOZ. Ka EZ-2Z0Z Ka Z2-IZOZ. Ka IZ -0Z AJ OLHORId (LIAIAOD HANHARS LNHNO 000'02 000'01 000'01 $ $ $ NAOGIVATHE LSOD' TVLIdYO HVIX ad LSOD' TVLIdVO a.1e. IZ/61/Z ped poyporAl LVCdn "0j0 ATAIoouuos IIB.I Burdeospuer euomppe. JoJ SI (SIOI$) eok p.y 04L "tSpPeePPMGNPS efpuoses -e41 soompeg-amodsuspepapaasmsdaePApPHPRaNSA 'BO.e uep.es Arunwwroo oy pue BO.e: ley sopIAIP YoI4M frayjeys ojuord ayjo yrou snf spoomjo uopoos Teus ay ur suoo.ypeg JoJ Burqungd pue qeIs eI9ISSO00B deoipuey eJ jo uonippe oy YJIM BO.IE. Jeyjoys oluord ay puno.e pue u Burdeospuer pue Burpe.8. JOJ pajeoore aq IIIM (SIOI$) JBOR 1s.IIJ eYL "saBe1s ur pajerduroo pue. eok-uinur aq IIIM goafod 9Y,L NOILVDIIISAr NOILdINOSIG LOarodd suroo.peg: Jo Burprg pue BurdeospueT Surpe.p puedxg asOdand, Z Aond JopIJ.OO apisayeT 1L.1Daroad oafoud jeadep/puny jeuauag :pung NOILVINOIN GNVS SYHVd quaur.edaa 9202-220Z AI Ian0a1DArola: IVLldyo NIASVIAL JOIOVTTIA VILLAGE OF MARVIN CAPITAL PROJECT REQUEST FY: 2022-2026 PARKS AND RECREATION OF CAR Department: Fund: General Fund/Capital Project PROJECT TITLE: Park' Trail Enhancements PRIORITY: 3 PURPOSE: Trail Construction Expand/ Connect PROJECT DESCRIPTION JUSTIFICATION The project would be construction of new trail segments connecting parking lots with existing trail andl heavily used areas providing walkable access toi multiple trail heads and popular park areas. This project is the construction of approximately 1,8001 linear feet of new trail at Marvin Efird. UPDATE: Modified per 2/19/21 retreat. CAPITAL COST PER YEAR CAPITAL COSTI BREAKDOWN COMMITTED PRIORTOFY20- 21 FY2 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FUTURE YEARS TOTAL PLANNING, DESIGN, AND ENGINEERING $ PURCHASE CONSTRUCTION $ MISCELLANEOUS OTHER: OTHER: OTHER: TOTAL 2,250 CURRENTI REVENUE $ 15,000 12,750 CURRENTI REVENUE $ 15,000 $ 15,000 DESCRIPTION OF SOURCE ESTIMATE: Estimate based on comparable project quotes of per linear: foot costs. REQUESTED BY: DATE: Department Head 5 9 PEeH quouredea LVG :X8 ISNOTI "anojeyo ui wragsks IIBIL A4 ayjo. aimgoegnueur oy pooM ynos wo.y SI ajonb aBesoed LVIILS ao8nos JO NOIIdIOSIQ 000'O1 $ TVLOL HLO HLO HLO SnOINVTTADSIAL NOLONRLISNO) ISVHDANd ONINAINION3 GNV 'NSISTG ONINNVId 000'0T $ TVILOL SAVIA aaLAa 92-SZOZA SZ-VZOZA VZ-EZOZA EZ-ZZ0ZA4 22-IZOZAA IZ -02 AIOLHORI ALLIAIIOD HONHARN INHNO 000'01 $ 000'01 $ NMOGHVRE LSOD TVIIdVO HVAX HId LSOD TVLIdVO (000'1$ XOI) siosuods uopeis YJIA1 1S00 aseyp.d ayp Bupesyyo jo AugIssod ay BurnelAeI SIJJe1S*** sjeTageur uoneresur pue Burddrys apnjour jou soop: inqx XE1 aojaq $66'8$ SI 1500 Bexped TIB.I SupIen B gsnfu uey oour. JoJ Buppoor sojeryge JoJ uoreupsep eIgIssod B1 4 Supyeur TeI ayjo AlHIIgEsn ey puedxa pInom IIBIL SSOuTI o4L TIB.I oy Buoge Ba.e papoom 042 ur poiesup aq1 pInom suopeis ped ayjo [oay oy BurSueyo jou eIIYA Ajuoure Jefndod Apeo.e ey ezin 01 AEM euoprppe ue sIosn IIB.I saplAod IIBIL SSOuIT e4L quosard SI sapueue oIour. IOJ peou oy yped ayjo Apepndod SuIMo.18 oy YIM TIBIL ssouIa uopeis 0zejo uopereisuy pue aseyo.nd ay1 IOJ SI goafod 0YL NOILVDHIISAE NOILdINOSIC LOTrOdd IIBIL ssouIa asOdand puedxg /eseyo.nd t AIIHOIId IIBIL ssaulla ILIL. LDarOdd oafoud jeudep/puny [e.aues :pun NOLLVNOIN GNV SMHVd quou.edoa 9202-220Z. KJ ISNOTS LOarOdd TVLIdV, NIASVIAL JO IOVTTIA VILLAGE OF MARVIN CAPITAL PROJECT: REQUEST FY2 2022-2026 PARKS AND RECREATION OF Department: Fund: General Fund/Capital Project PROJECT TITLE: Playground Replacement PRIORITY: 5 PURPOSE: Replace/ Expand PROJECT DESCRIPTION JUSTIFICATION Project will remove the old playset, replacing it with ai new, larger one. The current playset atl Marvin Efird park is natural (made of wood) and has al life span of 10 (plus/ minus) years according to the install company (Charlotte Playsets). This project request is to: fund annually a large scale piece of playground equipment to replace the current playset. The new playset would accommodate toddlers as well as older kids. Fiscal Year 2022-2023 isl left outt to accommodate for the large expenditure oft thel bathrooms at thel Lakeside Corridor. UPDATE: Modified at 2/19/21 Budget Retreat. CAPITAL COST: PER YEAR CAPITAL COST BREAKDOWN COMMITTED PRIORTOFY20- 21 FY2 2021-22 FY-2022-23 FY2023-24 FY2 2024-25 FY 2025-26 FUTURE YEARS TOTAL PLANNING, DESIGN, AND ENGINEERING PURCHASE $ $ $ $ $ $ CURRENT REVENUE 20,000 20,000 25,000 90,000 $ 90,000 25,000 CONSTRUCTION MISCELLANEOUS OTHER: OTHER: OTHER: TOTAL $ 90,000 DESCRIPTION OF SOURCE: ESTIMATE: Cost estimate based on various quotes obtained via Park Equipment Vendors forj playground equipment of comparable size and standards. REQUESTED BY: DATE: Department Head 7 peeH quouredea LVE :X8C GISINO senbjuyoay uopon.suoo pue sjepegeur JeIpuurs YIM sgoafo.rd uo poseq sajeupsE LVIILST DOHnOS, JO NOILTOSIC 000'0 $ TVLOL HLO IHLO ASHLO SnOINYTT3DSIAL $ NOLONRLISNOD 000'02 ISVHDANd ONISNION3 GNV 'NOISTG ONINNVId 000'01 $ $ $ TVIOL SHVIK TAMLAS 92-SZOZAA SZ-VZOZA VZ-EZOZ Xa £Z-220Z, Au 2Z-IZ0Z. A IZ -0Z AO.LAORId QLLIAIIOD HANHAES INESNO 000'04 000'02 NAOGIVITHE LSOD TVIIdVD HVIX Hd LSOD TVLIAVO suo.med oIour egepouruoooe 011 popoou 9q IIA sjo! Bupped [euomippey jo uoponusuoo oy sopruoue a.ny JoJ suerd ey1 YIIM pourquoo ped ayjo Apeindod SuIMo.8 oy YIM "3EIA oy Aq1 paysoy osoy pue ajpAld 410q 'sqUOAO Arunwuroo eBer JoJ Ajoedeo. eou 18 SI syed pya UTAIEIAI le Bupped que.g NOILVOHIISAE NOIIdIOSIC Joaroad ed pya UIAIEIAI 8 S10[ Bupped euomppe Jo uoonsuop puedxy SOdand 9 ALIHOINId uoisuedxg Bupyed ILIL LOTrONd goafoud eadep/puny jeuauas :pung NOILVINOIN GNVS SYHVd uou.edoa 9202-2202 Aa LSINOTA LOarOdd IVIdyp NIASVIAL JO 3VTTA VILLAGE OF MARVIN CAPITAL PROJECT REQUEST FY 2022-2026 PARKS AND RECREATION $4.74 Department: Fund: General Fund/Capital Project PROJECTTITLE: RAB #3 Landscaping Provide Landscaping for Roundabout #3 PRIORITY: 7 PURPOSE: Reno/ Expand PROJECT DESCRIPTION JUSTIFICATION Thet two existing roundabouts will have landscaping by the end of 2020. This project funds thel landscaping: for the future roundabout at] Marvin Rd and] New Town Rdt toi match the two existing roundabout landscapings. UPDATE: Modified per 2/19/21 retreat. CAPITAL COSTI PER YEAR CAPITAL COST BREAKDOWN COMMITTED PRIORTOFY20- 21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FUTURE YEARS TOTAL PLANNING, DESIGN, AND ENGINEERING PURCHASE CONSTRUCTION $ MISCELLANEOUS OTHER: OTHER: OTHER: TOTAL $ $ 10,000 CURRENT REVENUE 10,000 $ 10,000 $ 10,000 DESCRIPTION OF SOURCE: ESTIMATE: Cost based on similar quote for RAB'sla and 2 with extra money for contingencies or unforeseen costs associated with thej project (i.e., adding drainage, etc....). REQUESTED BY: DATE: Department Head 9 OL peeH quouedoa LVG XEAISINORR sepedjojunu quaoefpe wo.y sajonb. IBIIuIIS uo peseq segeupse 15aq SJJB1S LVIILST TOHOS JO NOILINOSIQ 000'04 $ TVLOL HLO HLO HLO S10ANVTADSIA NOLONRISNOO 000'01 asvHDaNd $ ONIHIINIONI GNV NSISTG ONINNVTA 000'07 000'01 000'02 $ $ $ $ TVLOL 97-SZ0Z, Ka S2-VZ0Z. Ka V2-EZOZAA EZ-2ZOZA4 2Z-IZOZAA IZ OZAIOLHORI, QLLIAIOD $ SHVX NLAA HANHARS INEND 000's2 HONHAES INESSNO 000'SI $ NAOQIVATNE LSOD' TVLIdVO HVIA Md LSOD' TVHAVO "ea.e. IZ/61/Z por porporw LVEIn SIBOR e.gny IOJ pajers Suroq SI4T Ayym SI yo14m 'pex pue sed Ajunop uolun Aq Ajauropur pauodsod uoaq sey goefo.d SI4A 'OZ0Z Arenuer josy"Aigedptunur yopo. IOJ pousisep ApenpIAipur 1ok Kjunoo oy gnoyano.iy aigeu ur quagsIsuoo 410q O.e ey su8is BurpurAEM sIle1sur pue soseyo.nd quouedea 0ax pue sseds, SAedrogunur yoeo yoI4m ur OAIeDIuI epimAjunoo B 01 quourpuuoo S,UTA.IEIAI aq pInom 1oa[o.rd o4,L NOILVDHIISDr NOILdINOSIC LOrOdd suêis BurpuyAeA IBIsuI pue aseyod suais BuIpuIyAEA ITLIL. LDarOad puedxg SOdand 8 ALRIORId puny sipafoud jeadeg :puny NOLLVINOIN GNV SYHVd :uou.edaa 9202-2202 XJ ISNOTE LOarOdd TVLIdVD NIASVIAL JO IOVTTIA MV $A $ 6A 6A 6A 6A 6A 6A $A SA 6A 6A ZL peOH queunedo LVG :X8 GISINOT ueld JOISeAT: LVIAILST aomnos JO NOILINDSIQ 00076'EE4 $ TVLOL HLO HLO HLO SDOANYITBDSIA $ NOMONRISNO) 00'049'44I 00'026'EEV $ $ $ $ TVIOL SAVIK AALAS 92-920Z Ka 92-4202 Aa 42-EZOZ Au EZ-22OZ. XJ 27-IZ0Z. Ka IZ OZXIOLHORA, GLLIAINOD AHHO 00'ZE8'89E 00'049'441 00'049'441 ISVHDAAd $ 9NIISNIONI GINV NDISTG ONINNVIA HHHLO 00'880'99 NAOQIVARE ISODTVLIdVo HVSA Had LSOD IVLIAVO SUOISIAIPgns sMopeeyA oquy/poue. a41 puno.e dool IIy B Bupyeur 'TEIL SMopeOA paquy oy, 4IM Z oseyd goeuuoo PInom E oseyd TIB.IL aoueLlta.o oyjo uorsuedxg NOILVDIIISIE NOIIdINOSIC LOarOud ajo.ouoo poysn.o :E eseyd .OWIEIINL zo uopoas IIL'ITSEOI puedxg ISOdnd ALIOINd EHd OWEIINL 20 TLIL LOTroud oafoud jeadep/puny je.auas :pung NOILVINOI8 GNV SyHVd quou.edaa 9202-2202 Aa ISNOTE LOarOdd TVLIdVD NIASVIAL JO IOVTTIA OV H EOF VILLAGE OF MARVIN CAPITAL PROJECT REQUEST FY: 2022-2026 OF Department: PARKS AND RECREATION Fund: General Fund/Capital Project PROJECTTITLE: Sla: Saddle Ave-Newtown Loop PRIORITY: PURPOSE: Expand PROJECT DESCRIPTION JUSTIFICATION 2,138 linear feet of Asphalt Greenway Expansion oft the Marvin Loop connecting Saddle. Avei to Newtown Rd with 2,138 linear feet of Asphalt Greenway. CAPITAL COST PER YEAR CAPITAL COST BREAKDOWN COMMITTED PRIOR TOFY20- 21 FY2021-22 FY 2022-23 FY2023-24 FY2024-25 FY2025-26 FUTURE YEARS TOTAL PLANNING, DESIGN, AND ENGINEERING $ PURCHASE 64,140.00 OTHER $ $ $ $ $ $ 85,520.00 85,520.00 85,520.00 85,520.00 427,600.00 85,520.00 CONSTRUCTION $ 363,460.00 OTHER MISCELLANEOUS OTHER: OTHER: OTHER: TOTAL $ 427,600.00 DESCRIPTION OF SOURCE ESTIMATE: Master Plan REQUESTED: BY: DATE: Department Head 13 4L pestuoupeded LVG :X80 GISNORRI ueld IOISEYAI LVIILST IOHnoS JO NOILdINOSIQ 00'000'E8LT $ TVLOL HLO AHLO HJLO 00'000'E8LT $ 00'009'99E 00'009'9SE 00'009'99E TVLOL 92-9202 AA 92-0202. Ka VZ-EZOZ AA EZ-2Z0ZA4 Z2-IZ0Z Aa IZ -0Z AJOLHORIA GLLIAINIOD SnO1NYTTDSIA 00'009'9SE $ SAVIA TANLAN $ $ $ $ IHHLO 00'0SS'SIST $. NOLONRISNOD 00'009'9SE ISVHDANd $ ONIZAINIONA GINV NSISTG NINNVId AHHLO 00'0SVL92 NAOGIVANE LSOD TVLIAVO HVIX aad LSOD TVLIAVO "QURT auruuser MOIIOA 011 peos UMOIMON pue onuoAy eIppes 01 OAIICI PIeygeoyA apnjour suoroes euomIppy JopIIIOD UMOJuMoG ay puno.e dooT oy Buperduoo IeMepIs LOGI O ABMUBO.D yeydsvjo1aay BouII SI6'8 jo uopon.suop NOILVOILISAE NOIdINDsIG LOaroud AEMuOO.D peydsy. jo1 goay BOuII SI6'8 (dooT) gIS A7IILIDIrOud puedxg asOdad E AROIdd oafold jendep/puny [euauas :pun NOIVINOIN GNV SYHVd quou.edad 9202-220Z. KJ LSNORS Loarodd TVLIdVD NIASVIAL JO IOVTTIA HVO VILLAGE OFI MARVIN CAPITAL PROJECT REQUEST FY2022-2026 M EFAINS 4 CARO Department: PARKS ANDI RECREATION Fund: General Fund/Capital Project PROJECT TITLE: C7: Preserve Internal Trail PRIORITY: PURPOSE: Expand PROJECT DESCRIPTION JUSTIFICATION 4,000 linear feet ofTrail: Natural Surface/ Crushed concrete Construction of 4,000 linear feet ofl Natural Surface Trail inside Thel Preserve neighborhood from Golden Bell Drive to White Dogwood Lane, expanding the current network of trails by .75 miles. UPDATE: Modified at the 2/19/21 Budget Retreat. CAPITAL COSTI PER YEAR CAPITAL COST BREAKDOWN COMMITTED PRIORTOFY20- 21 FY2 2021-22 FY2022-23 FY 2023-24 FY 2024-25 FY2 2025-26 FUTURE YEARS TOTAL PLANNING, DESIGN, AND ENGINEERING $ PURCHASE CONSTRUCTION $ MISCELLANEOUS OTHER: OTHER: OTHER: TOTAL $ $ 50,000.00 50,000.00 OTHER $ 50,000.00 $ 50,000.00 DESCRIPTION OF SOURCE ESTIMATE: Master Plan REQUESTED BY: DATE: Department Head 15 9L peeH quauedea LVG :X8 AIISNOTR "TMJo rapureua. JOJ 1500 KoAms JoJ pred osjB s.ayo.1g IIOL "l0aj eour ped SL'8$ X IIBI [e.geuy jo1 goay BOurI OSI LVIILST IDHnoS JO NOILdTDSIC 00'096'6L $ TVLOL HLO HLO HLO SnOINYTTADSIAL $ NOLONRISNOD 00'096'6L 00'096'64 $ $ TVLOL SHVIX IHALAA 97-S20Z Ka S7-VZOZAA 17-EZ0Z2 Aa EZ-2202 Aa Z2-IZ0Z. AH IZ -0Z AJOLHORId GILLIAINOD HEHLO OS'LS6'L9 ISVHDANd $ ONIAINION3 GNV 'NOISTG 'NINNVId HHHLO 09'266'II NAOGIVITNE LSOD TVLIAVO HVIX aad ISODTVIIdVo pooyroqyBON sKouuyo eyjo. Jop.toq ay1 uo IBIL aje.ouop paysno /ooems jengeNJojoay JBourI Z81'E Jo uopon.suop NOILVOIIISIE NOIIdIOSIC LOTrOld poouroqygjou SAouuyyo-BAL ooejs B.INgEN :oay Bour Z8I'E puedxg ISOdand 9 AIIHOIId IIBIL SXeuunyo :EIO A1IIL.IDaroud, oafoud jendep/puny [e.aues :pung NOILVINOIN GNV SYHVd quou.edaa 9202-2Z0Z. KJ LSNOR aroadTVilayo NIASVIAL JO I9VTTIA VILLAGE OF MARVIN CAPITAL PROJECT: REQUEST FY2022-2026 I Department: PARKS AND RECREATION Fund: General Fund/Capital Project PROJECT TITLE: C18c: Waxhaw-Marvin Rd/Crane Rd (Powerline) 1Mile; Natural Surface Trail Powerline (Wax-Mar Rd to Crane Rd) PRIORITY: PURPOSE: Expand PROJECT! DESCRIPTION JUSTIFICATION Construction of1 1 mile of Natural Surface Trail along thej power line easement (no current easement for entire trail). CAPITAL COST PER YEAR CAPITAL COSTBREAKDOWN COMMITTED PRIOR TOFY20- 21 FY2021-22 FY2022-23 FY2023-24 FY2024-25 FY2 2025-26 FUTURE YEARS TOTAL PLANNING, DESIGN, AND ENGINEERING $ PURCHASE CONSTRUCTION $ MISCELLANEOUS OTHER: OTHER: OTHER: TOTAL 19,826.25 OTHER $ 132,175.00 112,348.75 OTHER $ 132,175.00 $ 132,175.00 DESCRIPTION OF SOURCE ESTIMATE: Master Plan REQUESTED BY: DATE: Department Head 17 8L peeH quaureda LVG :X8 AILSNOTE ueld JaISeJAL OLVINILSE JDHnoS, JO NOIdIOSI0, 00'000'099T $ TVLOL HLO HLO AHLO SnOINVTTDSIA 00'000'099'1 $ 00'000'000'1 $ TVLOL SAVIX TANLAS 9Z-SZOZA 97-020ZAa VZ-EZOZA EZ-220Z AE 22-IZ0ZA X IZ OZAIOLHORIA, GLLIAIAOD HEHLO 00'000TIV'T $ NOMONRISNOD 00'000'099 $ asvHDaNd $ ONITSNION3 GNV NOISTG ONINNVIa IHHJLO 00'000'642 NAOGIVANE LSOD' TVLIAVO HVIA ad ISODTVIIdV, Too4os yH a3pr UTA.IEIAI pue. raquep aBETIA TH aBeIA 01 ATAIoouuoD sepIAo.d peos oueID 011 peos OIMOH Kooeis wo.y peou UTA.TeAI MEYXEM umop Supuun. IIBMepIs ageouop JO AEwueOD greydsy: Jo1 goay JBOurI 00E'83 jo uoponsuop, NOIIVOIIISAE NOILdINOSIC LDarodd IEMapIS DOII /AEMuOOID eydsy :oay JBOuII 00E'8 Pa aue.D 01 OIMOH Aaoe1s-92S 31IILIDArOHd, puedxg SOdnd ALRORd pafold eadep/puny je.auag :pun, NOIIVINOIN GNV S>HVd uou.edoa 9202-22OZ AJ LSINOTA LOrOdd TVLIdVD NIASVIAL JO IOVTTIA OF VILLAGE OFI MARVIN CAPITAL PROJECT REQUEST FY: 2022-2026 Department: PARKS AND RECREATION Fund: General Fund/Capital Project PROJECT TITLE: C5: Six Mile Creek Connector 1,508 linear feet of Asphalt Greenway PRIORITY: PURPOSE: Expand/ Connect PROJECT DESCRIPTION JUSTIFICATION Construction of1,508 linear feet of Asphalt Greenway connecting the intersection of. Joel Kerr and Marvin Road to the Six Mile Creek bridge at the Union County/) Mecklenburg County Line on Marvin Road. CAPITAL COSTI PER YEAR CAPITAL COST BREAKDOWN COMMITTED PRIORTOFY20- 21 FY2 2021-22 FY 2022-23 FY 2023-24 FY2024-25 FY 2025-26 FUTURE YEARS $ TOTAL PLANNING, DESIGN,AND ENGINEERING $ PURCHASE CONSTRUCTION $ 45,150.00 OTHER 255,850.00 OTHER 301,000.00 MISCELLANEOUS $ 301,000.00 OTHER: OTHER: OTHER: TOTAL $ 301,000.00 DESCRIPTION OF SOURCE: ESTIMATE: Master Plan REQUESTED BY: DATE: Department Head 19 0Z PEeH quaumedaa ILVE AEA3.ISINORR ueld JOISBJAI ILVIILST OHNOS JO NOILdIOSIQ 00'019'08E $ TVLOL AGHLO HLO HLO 00'019'08€ $ TVLOL 92-SZOZA SZ-VZOZA VZ-EZOZA EZ-220Z4 Aa Z2-IZOZAA IZ -OZAIOLHORIA, GLLIAIAIOD SnOINVTTDSIA 00'049f08E $ NOLDNRLISNOD ISVHDANd $ ONINTINION3I GNV'NSISIG ONINNVId $ saVas TAALAA HHHLO 00'VVS'EZE dAHLO 00'960'LS NAOGPIVTHE LSOD TVLIdVO HVIX H3d LSOD TVIIAVO 'peos UMOJMON pue peos [ooyos UTA.IEIAI 18 101 ou.Oo ay 01 (uOISIAIPgns o0.p UTA.IETAI ay opisur) op eL poqured oouuoo PInOM IIBIL ooej.ns [emgeNJo sollu 06' jo uoponsuoo oY NOLVDAISDr NOILdINOSIC Loarodd IIB.I aoejs InEN-SOIN6 oouuop /puedx aSOdand 6 AOld [004os WIA.IEIAI UMOL MON-40 e1nL pajued :300 TILIL. LDarodd, pafoud edep/puny leuauas :pun NOIIVINOIN GNV Syavd quou.edoa 9202-2202 Aa ISNOTA LOTrOdd TVLIdVD NIASVIAL JO IOVTTIA VILLAGE OF MARVIN CAPITAL PROJECT. REQUEST FY 2022-2026 Department: PARKS AND RECREATION Fund: General Fund/Capital Project PROJECTTITLE: C1lc: Crane Rd 2,456 linear feet: DOT Sidepath PRIORITY: 10 PURPOSE: Expand/ Connect PROJECT DESCRIPTION JUSTIFICATION Construction of2,4561 linear feet ofDOT Sidepath on thel Duke Energy ROW along Crane Road: from Newtown Road and south to Waxhaw Marvin Road. CAPITAL COST PER YEAR CAPITALCOST BREAKDOWN COMMITTED PRIOR TO) FY20- 21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 20245-26 FUTURE YEARS $ TOTAL PLANNING, DESIGN, AND ENGINEERING $ PURCHASE CONSTRUCTION $ 73,680.00 OTHER 417,520.00 OTHER 491,200.00 MISCELLANEOUS $ 491,200.00 OTHER: OTHER: OTHER: TOTAL $ 491,200.00 DESCRIPTION OF SOURCE: ESTIMATE: Master) Plan REQUESTED BY: DATE: Department Head 21 22 peoH quouedea LVA :X8 GISNOT ueld eISeAI LVIILST DOHNOS JO NOLLIDSIQ 00'010'EOL $ TVLOL HLO AHLO HLO 00'010'EOL $ TVLOL 92-S20Z Aa SZ-VZOZAA V2-EZOZ Aa EZ-22OZ, Aa 22-1202, Xa IZ -OZXIOLHORIA, GLLIAIOD SnOINVTTDSIA 00'040'EOL $ NOLONRLISNOD SVHDAAd $ ONINIINIONA GNV 'NOISG ONINNVId $ SAVIX TANLAA HHHLO 00'489'L6S HHHLO 00'9SV'SOI NAOGIVTNE LSOD TVLIdVO HVIX ad LSOD' TVIIdV 'peos UIA.IETAI MEYXEM 01 peos eueD wro.y youe.Ig UIOYMOD ay Suoje IIB.IL ooejs [BINgENJO sellur 99'1301 uoponsuop NOIIVOIIISAE NOIIdINOSIC LOaroud IIBL aopjng [B.INgEN - sellur 99'1 jpauuop/putdxy ISOdnd II ALIROIId youeig WIOYMOO /PA WIAIBIAI MEYXEA-PA oueID: :ZIO TLIL LOTrOad goafoudi [eadep/puny je.auag :pung NOIVINOIN GNV SMHVd quour.edad 9202-2Z0Z. Aa ISTNOTS LOarOdd IVLldy NIARVIAL JO I9VITIA lo VILLAGE OF MARVIN CAPITAL PROJECT REQUEST FY2022-2026 EOFR CAI Department: PARKS AND RECREATION Fund: General Fund/Capital Project PROJECT' TITLE: C18d: Waxhaw-Marvin toN NC/ SC line 681 linear feet-Natural Surface Trail Road to the NC/ SC state line. PRIORITY: 12 PURPOSE: Expand/ Connect PROJECT DESCRIPTION JUSTIFICATION Construction of 681 linear feet ofNatural Surface' Trail along thej power line easement from Waxhaw Marvin CAPITAL COSTI PER YEAR CAPITAL COST BREAKDOWN COMMITTED PRIORTOFY20- 21 FY2021-22 FY2022-23 FY 2023-24 FY2 2024-25 FY 2025-26 FUTURE YEARS $ TOTAL PLANNING, DESIGN, AND ENGINEERING $ PURCHASE CONSTRUCTION $ 2,553.75 OTHER 14,471.25 OTHER 17,025.00 MISCELLANEOUS $ 17,025.00 OTHER: OTHER: OTHER: TOTAL $ 17,025.00 DESCRIPTION OF SOURCE ESTIMATE: Master Plan REQUESTED BY: DATE: Department Head 23 42 peeH queuredea ILVGI XEGISIOII ueld JeISeJAI SLVINILSE JOHnoS JO NOILdIOSIQ 00'000's0z $ TVLOL HLO HLO HLO 00'000's0Z $ TVLOL 92-SZ0ZA4 SZ-VZOZAa VZ-EZOZA Xa EZ-ZZOZA4 Z2-IZ0Z. Aa IZ OZAIOLHORI4, GLLIAIOD IOANVTaJSIA 00'000's0Z $ NOLLONRLISNOD ISVHDAd $ ONIISINIONI NV'NSISIC ONINNVIA $ SHVIA ANAH IHHLO 00'OSZ'VLI JHHLO 00'0SL'0E NAOQIYANE LSOD TVLIAVO HVIA Had, LSOD' IVHdVO "dooT UTA.IETAL oy 01 VOISIAIPqnS IIPH weypukA o4p Bupoouuoo 'peoy JIOSI pof pue peos UTA.IEAL MEYXEM Buore 'yedaprs LOGIJO1 1a0j. BOuII SZO'IJO uoponnsuop NOILVDlLISAE NOILdINOSIC oroad yedapis JOaoay BOuII SZOT oouuop /puedxg SOdand EI AROIdd JIOYI aor/PA [ooups UIAJE/-IIEH uepuaM :9E0 311LIDaroid, oafoud eadep/puny je.euag :pung NOILVINOIN ENV SYHVd :quau.edaa 9202-2202 AJ LSINOTH LOarOdd TVLIdVD NIASVIAL JO IOVITIA S 4 $A 6A 6A 6A 6A 92 PeOH quoueded souy" D OZOZ/E/Z LVG X8 AISINORR 0afoid sI4A JOJ quouso.de aseyo.md: queuyeisur ue ansmd IIIM BeTIA eYL LVINILST JOHnoS JO NOILdIDSIQ 00'000'000T $ TVLOL AHLO HLO HLO SIOANVIBDSIA $ NOMONRISNO) ISVHDAAd ONINAANION3 GNV 'NSISTC ONINNVTA 00'000'000T $ TVLOL SHVIK TANLAA 97-92021 Ka S7-420ZA Xa VZ-EZOZ. Ku EZ-ZZOZA4 Z2-IZ0Z. A IZ OZAIOLODA, GLLIAINIOD HHHIO 00'000f000'1 00'000f000T $ NAOGVITHE LSOD IVLIaVD HVIA Had LSOD TVLIdVO (unousun Apua.mo O.IE Koyl SE sageusa osay ojuy ind uaaq, LONI OAEY oup SI47 aours passnosip uaaq OABY 1841 IEH aBETA oj sued O suorssnasip Auy 020Z Kren.qoa aours pajepdn uaaq jou SEY pue uerd dio pano.dde Ajquasa. gsour 04 uy pagsanba. zunours ay SBM ageupsa SIYL :LON) TIPH OBEIIA e JoJ 'uouur I$ poooxa 01 jou uopon.suoo. Mou 01 suopdo PAIeu.eyIe ansmd 01 asep sounop uO poseq unouy NOIIVOIIISAE NOILdINosIC OTrOad IH 03EIA :ISOdnd AJIIOINd IIEH a3BI1A ATIILIOarOud oafoud egdep/puny je.aues :pung NOLLVHISINIANOV 9202-220Z. AJ ISINOTS LDarodd TVLIdVO NIASVIAL JO IOVITIA uou.edaa OMVOH E 3 OHVD VILLAGE OF MARVIN CAPITAL PROJECT REQUEST FY2022-2026 UF CAR Department: PLANNING AND DEVELOPMENT Fund: General Fund/Capital Project PROJECT' TITLE: Village Center District PRIORITY: 2 PURPOSE: Village Center District PROJECT DESCRIPTION JUSTIFICATION This project was a desired project in the community survey and Council is assessing total costs now. (NOTE: The amount requested in the most recently approved CIP plan has not been updated since February 2020. Any discussions or plans for this district that have been discussed since this time have NOT been put into these estimates: as they are currently unknown.) CAPITAL COSTI PER YEAR CAPITAL COST BREAKDOWN COMMITTED PRIOR' TO) FY: 1204 21 FY 2021-22 FY2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FUTURE YEARS TOTAL PLANNING, DESIGN, AND ENGINEERING $ PURCHASE 135,000.00 OTHER $ $ $ $ 450,000.00 300,000.00 150,000.00 CONSTRUCTION $ 765,000.00 OTHER MISCELLANEOUS OTHER: OTHER: OTHER: TOTAL 900,000.00 $ 900,000.00 DESCRIPTION OF SOURCE ESTIMATE: Preliminary estimates only--need professional for more quotes. The revenue willl bei from the creation ofa a special tax district. REQUESTED BY: Rohit Ammanamanchi DATE: 2/3/2020 Department Head 27 82 PBeH quauedea sowy OZOZ/E/Z LVA :X8 GIISINOTR soeupsa LAIV LVIAILST OHNOS, JO NOIIdIDSIQ 00'000'0Z1 $ IVLOL HHLO AHLO HLO SnOINYTTDSIA $ NOIONRLISNOD SVHDANd $ ONINIINION3 GNV NSISTG ONINNVId 00'000'0Z1 $ TVLOL SHVIA AALAS 97-SZ0ZA 92-4202 Aa 12-EZOZAI EZ-ZZOZX4 27-IZOZAA IZ -02 XJC O.Laord GALLIAIAOD IHHJO 00'000'0I1 00'000'09 00'000'09 $ $ HHHLO 00'000'01 NAOGVITHE LSOD TVLIdVO HVIX Had LSOD IVLIdyo B0es p.Bog IZ/61/Z oy 18 peuypoyw ELVGIn "soppold pue suorssnosIp Iounop uo poseg j00-qstuul Bou pue. IOSI eorpjaeo UIA.IEJAL 18 SIBMSSO.ID peyaIT NOIIVOIISAE NOIIdINOSIQ LOTrONd SIIBMSSO.DD aSOdand E ALIRIOINd (E)saanyoy uepsaped TTLIL. LOTrOHd goafold eadep/puny jenouap :pun, NOLVHISINIAGV 9202-220Z. AI ISINOTS OarOdd IVLIdyo NIASVIAL JO IOVTTIA squaur.edad OMV PANE OMV2 VILLAGE OF MARVIN CAPITAL PROJECT REQUEST FY 2022-2026 ADMINISTRATION DE CARO Department: Fund: General Fund/Capital Project PROJECTTITLE: Farmers' Market PRIORITY: PURPOSE: PROJECT DESCRIPTION JUSTIFICATION Farmers Market at] New Town/Marvin School Road use. UPDATE: Modified at the 2/19/21 Board Retreat. Toj provide community amenities to thej public, al better use of Village-owned property, for passive recreational CAPITAL COST: PER YEAR CAPITAL COST BREAKDOWN COMMITTED PRIORTOFY20- 21 FY2 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FUTURE YEARS TOTAL PLANNING, DESIGN, AND ENGINEERING $ PURCHASE CONSTRUCTION $ MISCELLANEOUS OTHER: OTHER: OTHER: TOTAL 10,000.00 OTHER $ $ 10,000.00 50,000.00 50,000.00 OTHER $ 60,000.00 $ 60,000.00 DESCRIPTION OF SOURCE! ESTIMATE: Staff estimate--not official; would: need to obtain quotes. REQUESTED BY: DATE: Department Head 29 0E peeH queuedea LVG :X8 AAISINOTE 'sejonb uIe1qo 011 poou PINOM jeroyyo gou--ageuso, Je1s LVIAILLST ao8nos JO NOILdINoSIQ, 00'000'09 $ TVLOL HLO HLO AHLO S10ANVIBSIA $ NOLLNRISNOD ISVHDANd $ ONIISNION3 ANV'NSISG ONINNVIA 00'000'09 $ TVLOL SAVIA ALAA 92-920Z AJ S2-020Z. A V2-EZOZ. Aa EZ-ZZOZAA ZZ-IZOZA IZ -OZXIOLHOTA, GLLIAIIOD HEHLO 00'000'09 00'000'09 00'000'01 $ $ IHHLO 00'000'01 NMOQIVANE LSOD TVLIVO HVX ad LSOD TVLIdVO e0.og p.eog IZ/61/Z oy 1e poyipori LVGdn 'osn euoneO.oo.I OAISSEd JoJ Ajodo.d pauMo-a3EIEA jo osn pa1aq B 'ouqnd ay 01 sepluoue Agjunuwroo aprAo.Id OL NOILVDIISAr NOILdINOSIC LOrOdd asOdnd ALIHOIId aeaypydury ITLIL. LDarOdd oafoud eAdeo/Pungjerouay :pung NOLVHISINIANGV quow.tedaa OMVD T 9202-22O2 AJ LSNOTA LOarOdd TVLIdVD NIASVIAL JO IOVTTIA $ 6A 6A 6A $A 6A ZE peeH queur.edea LVG X8 GISINOTH sojeupsg/ABAmS Bupoeg.nsos peou SLAIV IVIAILST JDHNOS JO NOILdTNOSIQ 00'L69'60Z $ TVLOL HLO HLO AHLO SIOANYTIDSIN $ NOMONRISNOD asVHDand 9NI3INION3 GNV NOISTG ONINNVId 00'L69'60Z 00'682'001 00'804'60I $ $ $ TVLOL SHVIX THNLAS 9Z-SZOZA S7-V20Z1 Xa VZ-EZOZ. Aa EZ-2202. Aa 22-1202 Aa IZ OZXIOLHORA, GLLIAIAIOD HONEAEN INESNO 00'169'60Z NAOGVATNE LSOD TVLIAVO HVIX Hd LSOD TVLIdVD (009Z$ SI goofoid SIY, IOJ o.eys a1e1S pageuse oy 9ZKAuI :1OND AEMuaa.ID. jo selrur 21 pue joa.o UIAIEIAIJO suopoes faseyo uogaurppem Pley.equep JoJ suonipuop peoxs jos suopepupuuooar pue Apnys Bupoourdug SLIAIV uO poseq sageursa peprAo.d NOILVDISIr NOILdTOSIC LOarodd aoueuogupe OAIeguoAa.d SOdand ALIIOIId ueld 67-2ZAI jeas B01 ITLIL. LOTfOHd, 118 lemod/puny je.eues :pun, NOIVIHOANVALSCYON uau.edoa 9202-2Z0Z. Aa LSNOTA LOTrOdd TVLIdVD NIASVIAL JO IOVITIA OF VILLAGE OF MARVIN CAPITAL PROJECT REQUEST FY2022-2026 Department: ROADS/TANSPONTAION Fund: General Fund/Powell Bill PROJECT TITLE: Fog Seal FY22-29 Plan PRIORITY: PURPOSE: Preventative Maintenance PROJECT DESCRIPTION JUSTIFICATION Provided estimates based on AMT's Engineering study and recommendations of Road Conditions for Amber Meadows, Beechwood, Firethorne, Preserve, Tullamore and Woodcliff. (NOTE: In) FY25, the estimated State Share cost is $11,600.) CAPITAL COST PER YEAR CAPITAL COST BREAKDOWN COMMITTED PRIORTOFY20- 21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FUTURE YEARS $ TOTAL PLANNING, DESIGN, AND ENGINEERING PURCHASE CURRENT REVENUE $ $ 143,317.00 CONSTRUCTION $ 131,209.00 MISCELLANEOUS 274,526.00 274,526.00 OTHER: OTHER: OTHER: TOTAL $ 274,526.00 DESCRIPTION OF SOURCE ESTIMATE: AMT's! Road Resurfacing Survey/Estimates. REQUESTED BY: DATE: Department Head 33 6 peeH: queuredea LVG :X8 AIISNOTRI sageunse. eyeq oJ sajonb jengoe poou P/nom--ageurse, Jye1s LVIILST IDHnoS JO NOILdINDSIQ, 00'000'994 $ TVLOL HLO HLO HLO SnOINVTTDSIA $ NOLONRISNOD ISVHDAAd ONIAANIONA GNV 'NOISTC ONINNVId 00'000's9y $ IVIOL SHVIX TANLAA 92-9202. KJ S2-420Z. Xa VZ-EZOZA EZ-2Z0Z Aa 22-1Z0Z. Xa IZ -02. AO.LHORId ALLIAIIOD HONHAR LNENNO 00'000'994 00'000f0SI 00'000f00Z 00'000'SII $ $ $ NAOGIVATNE LSOD TVLIdVo AVIA Had LSOD TVIIIVO uopon.suoo Jo/pue Bupoaurauo 'uerd Bupy8y JOJ S1S00 Kue apnjour jou seop SIYL sun.LOAO O.eys 1500 pageuso SI VE-EZKI quouroo.de poyipour a.gny IOJ gsonba. NOD1 pageurso EZ-ZZK foe.nuoo Burpurg que.no SI 22-IZKH Be.1es 108png IZ/61/2: 1e porypo LVGIn O.Ieys IWOA pageupss NOILVDIIISAE NOILdTHOSIC LOTrOHd peos UMOL MON pue peos UIA.IETAI 18 8VA aeys 1500 E# 8VA ILIL. LOarOud, ISOdnd ALTROTHd III8 amod/puny jeuauas :pun, NOLVIHOASNVALSCYON uou.edaa 9202-220Z KJ LSNOTH arodd IVLIdyp NIASVIAL JO5 OVTTIA Iten 2 $ A w jun