Document AIA Change Order PROJECT: (name and address) Hanover Townshipl Municipal Pool 3650. Jacksonville Road Bethlehem, PA 18017 OWNER: Hanover fname rownship ando address) 3650. Jacksonville! Road Bethlehem, PA 18017 G701" -2017 CONTRACT INFORMATION: Date: ARCHITECT: BKPArchitects (name ando address) 1525 Locust Street, 5th Flr. Philadelphia. PA 19102 CHANGE ORDERI INFORMATION: Date: CONTRACTOR: (name and address) 44Pheasant Heim Construction Run Road Co. Orwigsburg, PA 17961 Contract For: Hanover Twp. Mun. Pool Change Order Number: 002 December: 22, 2023 4-11-23 THE CONTRACT IS CHANGED, ASF FOLLOWS: (Insert a detailed description of the change and, ifapplicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change. Directives.) Cost toj provide temporary powert tor nine: site/parking loti lights. Ther nine lights are currently fedi from a circuiti in they panel int the existing pump! house. This circuit will be cut when the pump! house is demolished. Temporary powert tol lights willl be from thep paneli int the existing bath house. See attached COR# #06 dated 4/7/23, The original (Contract Sum) (Guaranteed. Maximum Price) was Ther net change by previously authorized Change Orders $6.745,325.00 $1,139.24 $6,746,464.24 $3,533.19 The (Contract Sum) (Guaranteed Maximum. Price) prior tot this Change Order was The (Contract Sum) (Guaranteed: Maximum Price) willl be (increased) (decreased) (unchanged) by this Change Orderi int the amount of Thei new (Contract Sum) (Guaranteed: Maximum Price), including this Change Order, willl be $ $6,749,997.43 The Contract Time willl be (increased) (decreased) (unchanged) by Ther new date of Substantial Completion willl be )days. November: 23, 2023 NOTE: This Change Order does not include. adjustments tot the Contracti Sum or Guaranteed. Maximum Price, or the Contract Time, that) have been authorized by Construction Change. Directive until the cost andi time have been agreedi upon by both the Owner and Contractor, in which case a Change Order is executedi to supersede the Construction Change Directive. BKP Architects ARCHITECT (Firm name) SIGNATURE PRINTEDI NAMEA ANDTITLE 4-11-23 DATE NOT VALIDI UNTIL SIGNEDI BYT THEA ARCHITECT, CONTRACTOR AND OWNER. Heim Gonstruction Co. CONTRACTOR (Firm name) SIGNATURE Hanover Township OWNER (y Joseph Powell, AIALEED. AP, Principal Michael VP Wright, Operations I5 JohnJ.F Finnigan, Township Manager 04-12-2023 DATE DATE AIA Document G7017M 2017. Copyrighte1 1979, 1987, 2000, 2001 and2 2017 by The American Institute of Architects. Allr rights reserved. WARNING: This AIA" Document is protected by U.S. Copyright! Law andI International Treaties, Unauthorized reproduction or distribution oft this AIA Document, ora any portion ofit, may resulti in severe civila ando criminal penalties, andy willl bep prosecutedi tot the maximume extent possible under the law. Tor report copyrighty violations ofA AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyighi@aia.org. AIA Change Order PROJECT: (name and address) Hanover Township Municipal Pool 3650. Jacksonville Road Bethlehem, PA 18017 OWNER: Hanover lownship fname and address) 3650. Jacksonville! Road Bethlehem, PA 18017 Document G701-2017 CONTRACT INFORMATION: Date: ARCHITEÇT: 3KP. Architects (name and address) 1525 Locust Street, 5th Fir. Philadelphia, PA 19102 CHANGE ORDERI INFORMATION: CONTRACTOR: lem cor ACTORIREg and address) 44 Pheasant Run! Road Orwigsburg, PA 17961 Contract For: Hanover Twp. Mun. Pool Change Order Number: 003 December: 22, 2023 Date: 4-11-23 THE CONTRACT. IS CHANGED ASFOLLOWS: (Insert a detailed description of the change and, ifapplicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable. to executed Construction Change Directives.) Cost toi install temporary powert tot the publicv works pole barn andi the old! bath! house. Power tot both is currently. providedi from the existing pump house and will be cuti in ordert to demolish the pump! house. Work was done via Construction Change Directive #1 and costs documented" viai time andi material, See attached Construction Change Directive and COR: #05 dated 4/10/23 $6.745,325.00 $4,672.43 $6,749,997,43 $17,558.84 $6,767,556.27 November. 23, 2023 The original (Contract Sum) (Guaranteed. Maximum. Price) was Ther net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum! Price) priort tot this Change Order was The (Contract Sum) (Guaranteed. Maximum Price) willl be (increased) (decreased) (unchanged) $ Ther new (Contract Sum) (Guaranteed Maximum! Price), including this Change Order, willl be by this Change Order ini the amount of The Contract Time will be (increased) (decreased) (unchanged) by The new date of Substantial Completion willl be )days. NOTE: This Change Order does noti include adjustments. to the Contract, Sum or Guaranteed. Maximum Price, or the Contract Time, that have been authorized: by Construction Change Directive until the cost andi time have been agreed upon by both the Owner and Contractor, ini which case a Change Order is executed to supersede the Construction Change Directive. BKP Architects ARCHITECT (Firm name) SIGNATURE PRINTEDI NAME AND1 TITLE 4-11-23 DATE NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Heim Construction Co. CONTRACTOR (Firm name) SIGNATURE Hanover Township OWNER E Joseph Powell, AIALEEDAP, Principal Michael' VP Wight, Operations John, J.F Finnigan, Township! Manager 04-12-7023 DATE DATE AIA Document G7017M- 2017. Copyright e1 1979, 1987, 2000, 2001 and2 2017 by The American Institute ofA Architects.. Allr rights reserved. WARNING: This AIA°Document! is protected by U.S. Copyright Law andl International Treaties, Unauthorized reproduction or distribution oft this AIA° Document, or any portion ofit, may resulti ins severe civila and criminal penalties, andwilll bey prosecutedt tot ther maximume extent! possible under thel law. Tor reporto copyright violations OfAIA Contract Documents, e-mail" Thel American Institute ofA Architects' legal counsel, copytigh(@aia.org. HANOVER TOWNSHIP NORTHAMPTON COUNTY PROCLAMATION NO. 2023 --- AF PROCLAMATION HONORING ANNA P.DAZEWSKI ON THE ACHIEVEMENT OF HER GIRLSCOUT GOLD AWARD WHEREAS; Anna P. Lazewski has achieved a significant accomplishment in life's path earning her WHEREAS: Anna will officially- receive her award during a Girl Scout Achievément Ceremony on Girl Scout Gold Award as a memberofthe Girl Scouts ofthe USA; and Sunday, May 21, 2023 as" a member of Bethlehem, PA; and WHEREAS, Anna crafted what is now Sustainability, on the Monocacy, a virtual self-guided tour in which visitors can learn about the history of the area and the ofthe Monocacy Creek, the power of WHEREAS, Anna isa Girl Scout Bronze & Silver Award winnèr, GSEP Girl Delegate, Community Service Bar winner anda) President's Volunteer Service Award winner in 2019 &2021; and WHEREAS, Annal 1S a member of the Liberty, High School Grenadier Band, Orchestra, Jazz Band, Pit Orchestra, the'Américan Legion Band of Bethlehem, Student Government, National Honor Society, Cops 'n' Kids, Lehigh Valley Composite Biking, Mini-THONA and Model United Nations holding NOW.THEREFORE, BE ITAND IT IS HEREBY PROCLAIMED, by the Board of Supervisors of Township ofHanover, County of.Northampton, and the CamavsalafPemyanis That ANNA P. LAZEWSKI is applauded, and recognized on the occasion of her Gold Award and the Board of Supervisors congratulates hery for her dedication and devotion in preserving, the finest virtues of American life. The Board of Supervisors also proclaim Monday, May 22, 2023, as Anna P. native plants, and the importance ofs sustainability; and leadership positions' ini many, oft the organizations. MEHVI-aRe 43 8 Lazewski Day in Hanover Township. APPROVED and adopted this:251 day ofApril 2023, ATTEST: HANOVER TOMASHIPNOKTIAMTION COUNTY,PENNSYLVANIA Christina A. Thomas, Secretary Board of Supervisors JOHN N.J DIACOGIANNIS, Chairman - Board of Supervisors Benchmark CIVIL ENGINEERING SERVICES, INC. 1727 Jonathan Street . Allentown, PA 18104 Phone: (610)776-6700 . Fax: (610) 776-1190 . www.bencivil.com April17,2023 Board of Supervisors Hanover Township, Northampton County 3630 Jacksonville Road Bethlehem, PA 18017-9302 RE: Time Extension Freshpet Plan #2 Addition Benchmark Project No. 003163 Dear Board Members: On behalf ofProfessor Connor's, we are hereby requesting a 6 month extension from the Township for thej purpose of completing the improvements. The current application expires on April 28, 2023 and the extension is granted to October 28, 2023. Thank you for your consideration oft this matter, Very truly. yours, PaulA. Sgewcgak Paul A. Szewczak PAS/slc DRAFT MOTION APRIL25, 2023 MEETING FARMHOUSE VILLAGE HANOVER Q92HANOVERVILLE ROAD PRELIMINARY/RECORD SUBDIVISION PLAN HANOVER TOWNSHIP BOARD OFS SUPERVISORS The Board of Supervisors approves the Prehminaty/Record Farmhouse Village Hanover Subdivision Plan, dated as last tevised March 10, 2023, upon the following conditions: CONDITIONS 1. The Developer/Owner shall address all outstanding comments in the Hanover Engineering Associates, Inc. review letter dated. April 20, 2023 to the satisfaction oft the Township The Developer/Owner shall prepare all necessary easements and agreements, satisfactory to the Township Engineer and/orS Solicitor, and provide executed copies to the Township. A note shall be added to the Plan(s) identifying all Subdivision and Land Development Ordinance and Stormwater Management Ordinance waivers and deferrals, along with any conditions and the meeting date of the Board of Supervisors actions. The Developer/Owner shall enter into an Improvements. Agreement with the Township and provide appropriate security. (SALDO Section 159-30.D.(5)) A. The Improvements Agreement shall include a notarized statement, satisfactory to the Township Solicitor, stating that the Township shall be held harmless against any claim of damage from the downstream property owners that may result from the proposed development. (Stormwater Management Ordinance 19-01, Section 152- Engineer prior to Plan recording. 2. 3. 4. 10.E) B. The Improvements Agteement and a separate Covenant running with the land shall include provisions satisfactory to the Township Solicitor, that the stormwater collection, conveyance, BMPs and control facilities located on private property shall be properly operated and maintained by the property owner. (Stormwater Management Ordinance 19-01, Sections 152-10.M and 152-24.3) C. The Improvements Agreement shall include a statement that a BMP Operations and Management Plan (Post Construction Stormwater Management Plan) shall be recorded, listing the person(s) responsible for operations and maintenance, signed by the landowner, acknowledging that the stormwater BMPS are. fixtures that cannot be altered or removed without apptoval by the Township. (Stormwater Management Ordinance 19-01, Section 152-24.5) 2 April 20, 2023 5. The Developer/Owner shall enter into an Indemnification Agtccment satisfactory to the Solicitor regarding waiver of Stormwater Management Ordinance Sections 152-10.I(4) and This plan may: not be tecorded until after the recording of the 6292 Hanoverville Road The Developer/Owner: shall enter into a Maintenance Agreement with the Township and The Develope/Owmershal pay a Township Recreation and Open Space Area fee in the amount of 510,2000013000/acre X 0.04 acres/unit X21 residential units). (SALDO The Developet/Owner shall pay" Tapping ($1,860.06 each lot), Connection ($472.50 each lot) and Customer Facilities ($330.00 each lot) Fees at the time ofbuilding permit issuance. (9) and 152-10.1.(6)(d). Minor Subdivision. 6. 7. 8. provide appropriate security. (SALDO Section 159-30.D.(6) Section 159-16.D 9. (Sewers Section 140-13) 10. The Developer/Owner: shall pay a Traffic Impact Fee in the amount of $8,232.00 ($343.00/PM peak hour trip X2 24 trips). (Impact Fee Ordinance 91-12, Resolution 2013-20 11. The Developet/Owner: shall pay a Storm Sewer Interceptor Value of $13,987.50 ($12.50 per lineal foot of new streets X1,119 lineal feet of new street). (Stormwater Management Ordinance Section 152-12.B.(2) 12. The Developer/Owner shall pay all current fees, including any outstanding plans and 13. The Developer/Owner shall provide two (2) Mylats for recording the plans and ten (10) sets of plans which are signed and notarized by the Owner and sealed by the Surveyo:/Engineer. appeals account charges. (SALDO Section 159-36.J) (SALDO Section 159-34.B) 14. The Developer/Owner shall meet all conditions of the Preliminaty/Record Plan approval, and the Preliminary/Record. Plan shall be recorded within twelve (12) months of Conditional Plan approval, and agrees that ifs such conditions are. not met, the conditional Preliminary/Record Plan approval shall be considered void, and the application for Preliminary/Record Plan approval shalll be considered void and withdrawn. Ifurther move, the granting of conditional Prelminaty/Kecord Plan approval recognizes the The Board of Supervisors waives the maximum 600-foot cul-de-sac length to allow a cul-de- The Board of Supervisors waives the requirements to identify all existing features within 200 Township is agreeing to the following on the Subdivision Plan: 1. 2. sac length of 1,119 feet. (SALDO Section 159-11.D) feet of any part oft the property. (SALDO Section 159-29.C.(1). 3 April 20, 2023 3. The Board of Supervisors waives the requirement to obtain Preliminary Plan approval prior tos submission ofa a Record Plan and allow a combined Prcliminaty/Record Plan submission. The Board of Supervisors waives the requirement to. line the proposed infiltration basin with The Board of Supervisors waives the requirement that the interior side slopes oft the wetlands area: not be steeper than a: ration of 4:1 horizontal to vertical. (SMO Section 152- The Board of Supervisors waives the requirement that the water surface limit oft the proposed. infiltration basin and wet pond water surface limit be no closer than 100 feet toa The Board of Supervisors waives the requirement that the minimum slope of the bottom of the wet pond be 2%1 towards the outlet structure. (SMO Section 152-10.I.(10)) (SALDO Section 159-34) 4. 5. as synthetic impervious liner. (SMO Sections 152-10.I.(4) and (9)) 10.I.(6)(c)) 6. residential building. (SMO Section 152-10.L.(6)(d), 7. Ifurther move, the Township Secretary be authorized to notify the Developer of the Board's action. SPociamispalVimorlepwDAifammbou-Vlagsabinw ion'Do:0:023tamhoumeVlagllmoreab-Pcianleend"lam-Dafhbotion.dos DRAFTI MOTION APRIL25, 2023 MEETING HANOVER TOWNSHIP BOARD OF SUPERVISORS 6292 HANOVERVILLE ROAD PRELIMINARY/RECORDSUBDIVISIONI PLAN The Board of Supervisors approves the Prelminaty/Record Subdivision Plan of 6292 Hanoverville Road, dated as last revised Februaty 22, 2023, upon the following conditions: CONDITIONS 1. The Developer/Owner shall address all outstanding comments in the Hanover Engineering Associates, Inc. review letter dated April 20, 2023 to the satisfaction oft the Township The Developer/Owner shall prepare all necessary easements and agreements, satisfactory to the Township Engineer and/or Solicitot, and provide executed copies to the Township. Ai note shall be added to the Plan(s) identifying all Subdivision and Land Development Ordinance waivers and deferrals, along with any conditions, time limits, and the: meeting date The Developer/Owner shall enter into an Improvements Agreement with the Township and The Developer/Owner shall enter into a Maintenance Agreement with the Township and The Developer/Owner shall pay a residential Tapping Fee ($1,860.06), Connection Fee ($472.50) and Customer Facilities Fee ($330.00) at the time of building permit issuance. Engineer prior to. Plan recording. 2. 3. oft the Board of Supervisors actions. 4. 5. 6. provide appropriate security. (SALDO Section 159-30.D.(5)) provide approptiate security. (SALDO Section 159-30.D.(6) (Sewers Section 140-13) 7. The Developer/Owner shall pay all current fees, including any outstanding plans and appeals account charges. (SALDO Section 159-36.J) 8. The Developer/Owner shall provide two (2) Mylars for recording the plans and ten (10) sets of! plans which are signed and notarized by the Owner and sealed by the Surveyor/Engineer. The Developer/Owner shall meet all conditions oft the Prelminaty/Record Plan approval, and the Preliminaty/Record Plan shall be recorded within twelve (12) months of Conditional Plan approval, and agrees that if such conditions are not met, the conditional Prelminaty/Record Plan approval shall be considered void, and the application for Prehminatry/Record Plan approval shall be considered void and withdrawn. (SALDO Section 159-34.B) 9. 2 April 20, 2023 Ifurther move, the granting of conditional Prelminaty/Record Plan approval recognizes the Township is agreeing to the following on the Subdivision Plan: 1. The Board of Supervisors defers the requirement to widen the Jacksonville Road cartway to a minimum 17-foot half cartway width with curb for a period of two (2) years from the date The Board of Supervisors defers the requirement to install sidewalks along the Jacksonville Road frontage for a period oft two (2) years from the date of] Plan recording. (SALDO The Board of Supervisors waives the requirement that the lot depth shall vary between one (1) and 2 %2 times the lot width and allows a lot depth gteater than 2 % times the lot width. The Board of Supervisors waives the requirement to meet the Township recreational and The Board of Supervisors defers the requirement toj plant street trees along the Jacksonville Road frontage for a period of two (2) years from the date of Plan recording. (SALDO The Board of Supervisors defers the requirement to plant replacement trees for five (5) trees previously removed from the site without a valid permit/approval foraj period of two (2) years from the date of] Plan recording. (SALDO Section 159-17.F.(2)) The Board of Supervisors waives the requirement to: identify the widths ofa all existing streets within 200 feet ofany part of the property. (SALDO Section 159-29.C.(1)) The Board of Supervisors defers the requirement to ptovide a soil erosion control plan and narrative for the proposed construction associated with the sanitary sewer extension and water. lateral for a period oft two (2) years from the date of] Plan recording. (SALDO Section The Board of Supervisors waives the requirement to obtain Preliminary Plan approval prior to submission ofa Record Plan and allows a combined Prelminaty/Kecord Plan submission. of] Plan recording. (SALDO Sections 159-10.H and 159-11.C: and) J) 2. Section 159-13.B) 3. (SALDO Section 159-15.B.(3)) 4. 5. open space area requirements. (SALDO Section 159-16.D) Section 159-17.C.(4)) 6. 7. 8. 159-29.E.(6) 9. (SALDO Section 159-34) Ifurther move, the Township Secretary be authorized to notify the Developer of the Board's action. SAPojgcsialuidpllinmordlepVap3ians.uhrisio'Dosos 249Alsomalalonsa) Whitehall Turf Equipment 3691 Eberhart Road Whitehall, PA 18052 Phone: (610)432-0299 Invoice Estimate fee of 10% on alle electrical parts. 91191 Thank youf for your business! We hope tos see you back soon. Items must be returned int the original package. Receipt required forf full credit. Restocking - : Hanover" Township 3630. Jacksonville Rd. Bethlehem, PA 18017 Bill To Ship To Customer 1227 Bob Milander Section 1 Model LZX993EBV726X1 Contact: Ext 224 Marty Publ Bob Milander Customer Tax Number Phone Cell Phone Transaction Email Address impareharovenwpmcorg PON Number Department Counter Amount (610) 866-1140 (610): 390-2175 Estimate Counter Persone Sales Pérson Date Printed Reference 04/12/23 91191 Line Description. EXEW 72" 993EFIVANGUARD Ordered B/O'd Shipped 2 List Net 2$19,899.99 $15,306.20 $30,612.40 Section 1SubTotal Section 2 SubTotal $30,612.40 $0.00 $0.00 Section 2 State Contract 4400020097 number Invoice Total $30,612.40 Sales Tax Grand Total $30,612.40 Thank you for your business! We hope to see you back soon. Items must be returned in the original package. Receipt required for full credit. Restocking fee of 10% on all electrical parts. Notes: Customer acknowledges receipt thereof: Whitehall Turf Equipment Invoice Estimate # 91191 Hanover Township Page 1of1