MEETING MINUTES February 20, 2024 CENTRE COUNTY PLANNING COMMISSION Members Present: Rich Francke, Chair, Chris Kunes, Vice-Chair, Denny Hameister, Secretary, Bob Dannaker, Andrea Pandolfi and Deb Simoncek Members Absent: Michele Barbin and Jenn Shufran Staff Present: Others Present: Ray Stolinas, Chris Schnure, Xochi Confer, Lori Kerschner and Stacy Mann Jacob Michael, CDT and John Sepp, PennTerra Engineering 1. Call to Order - Pledge of Allegiance Mr. Francke welcomed everyone to the Planning Commission meeting and called the meeting to order at 6:00 p.m. The meeting is being recorded. 2. Citizens Comment Period None. 3. Additions to Agenda None. 4. Approval of Minutes Ar motion was made by Mr. Hameister and second by Mr. Dannaker to approve the minutes of January 16, 2024. Motion carried. 5. Planning Commission Member Updates None. 6.! New Business Subdivision /Land Development Subdivision: Barns Lane Subdivision Final Subdivision Plan Ten (10) Residential Lots Benner Township CCPCDO File #1-24 1 A motion was made by Mr. Dannaker to grant conditional final plan approval subject to the review comments from the Benner Township Zoning Officer as well as completion of the pending items and the approval signatures of the Benner Township Planning Commission and Board of Supervisors, second by Ms. Pandolfi. Motion carried. Land Development: Benner Pike Tru by Hilton Hotel & Retail Building Final Land Development Plan Two (2) Buildings Benner Township CCPCDO File #108-23 A motion was made by Mr. Kunes to grant conditional final plan approval subject to the review comments from the Benner Township Engineer as well as completion of the pending items and the approval signatures of the Benner Township Planning Commission and Board of Supervisors, second by Ms. Simoncek. Motion carried. Time Extension Requests: February 20, 2024 Meeting Benner Township. Potter Township. Wawa at Eagle Point (CFA) Benner Township. Benner Township. Benner Township. Gregg Township McDonald's Restaurant Land Development (CFA) File No. 53-23 File No. 79-23 File No. 89-23 File No. 109-22 File No. 86-21 File No. 132-21 1st Request (No Fee Required) 1st Request (No Fee Required) 2nd Request (No Fee Required) 5th Request ($100.00 Fee Required) .6th Request ($150.00 Fee Required) 9th Request ($300.00 Fee Required) Transducersworks Manufacturing Facility Land Development (CFA) The Cascade Land Development (CPA) Belle Rose Townhomes Land Development (CFA) Eli E B. & Linda Mae Esh Subdivision (Replot of Lot 6) (CFA) Bellefonte Warehouse Land Development Plan in Benner Township has been formally withdrawn (reference letter of February 9, 2024) Note: CPA = Conditional Preliminary Plan Approval CFA = Conditional Final Plan Approval A motion was made by Mr. Hameister and second by Ms. Pandolfi to approve the above- Major Subdivision and Land Development Plan Sub-Committee Meeting: The virtual meeting mentioned Time Extensions. Motion carried. will be Thursday, February 29, 2024, at 4:00 p.m. Please see. Attachment #1 - Subdivision & Land Development for more information. 2 7. Centre County Transportation Update Ms. Confer gave an update on the Upcoming Activities and answered questions of various board Please see. Attachment #2. - Centre County MPO Upcoming Activities for more information. 8. Director's Report and Other Matters to Come Before the Commission members. The Director's report was previously emailed. Mr. Stolinas briefly went over the items in the report. Walker Township Application for Conditional Use - T.P. #14-004-,007-,07-,0001-John M. & Elsie Ferguson Township Economic Development, Growth and Innovation Strategic Master Plan - Appalachian Regional Commission Area Development Program Grant Letter of Consistency Potter Township Zoning Map Amendment - Scott A. & Kimberly A Burk (T.P. #20-008- Potter Township Zoning Map Amendment - Shelby L. & Alison L. Luse (T.P. #20-008- Please see. Attachment #3 - County Planning Director Update for more information. With no further business to come before the Commission, a motion was made by Ms. Simoncek to adjourn at 6:58 p.m. and second by Mr. Francke. Motion carried. S.G Glick (1/25/2024) (1/29/24) ,005H,0000-) (1/31/24) ,002A,0000-) (1/31/24) Respectfully submitted, Ag Raymond J. Stolinas, Jr., AICP, Director THESE MINUTES WERE APPROVED AT THE MARCH 19, 2024 CENTRE COUNTY PLANNING COMMISSION MEETING. 3 Attachment #1 SUBDIVISION & LAND DEVELOPMENT February 20, 2024 Subdivisions: 1. Barns Lane Subdivision Final Subdivision Plan Ten (10) Residential Lots Benner Township CCPCDO File #1-24 Land Developments: 2. Benner Pike Trul by Hilton Hotel & Retail Building Final Land Development Plan Two (2) Buildings Benner Township CCPCDO File #108-23 Time Extension Requests: 1. McDonald's Restaurant Land Development (CFA) File No. 53-23 Filel No. 79-23 File No. 89-23 File No. 109-22 File No. 86-21 Benner Township.. Potter Township.. 3. Wawa at Bagle Point (CFA) Benner Township.. Benner Township.. Benner Township.. Gregg Township.. 1st Request (No Fee Required) 1st Request (No Fee Required) .2nd Request (No Fee Required) .5th Request ($100.00 Fee Required) .6th Request ($150.00 Fee Required) .9th Request ($300.00 Fee Required) 2. TransducerWorks Manufacturing Facility Land Development (CFA) 4. The Cascade Land Development (CPA) 5. Belle Rose Townhomes Land Development (CFA) 6. Eli B. & Linda Mae Esh Subdivision (Replot ofLot 6 of Plat Book 81, Page 174) (CFA)File No. 132-21 Note: CPA = Conditional Preliminary Plan Approval CFA = Conditional Final Plan Approval This office acknowledges receipt of written requests from the above-referenced applicants asking the Commission to favorably consider the granting of ninety (90) day time extensions for the completion of the remaining conditions pending plan approval. Accordingly, staffr recommend the granting of ninety (90) day Note: The Bellefonte Warehouse Land Development Plan in Benner Township has been formally time extensions. withdrawn (see letter of February 9, 2024). Page 1 of1 #1 Barns Lane Subdivision Final Subdivision Plan Ten (10) Residential Lots Benner Township (plan dated: January 4, 2024; last revised: February 15, 2024) Location: Along the southern boundary of Barns Lane (T-343), approximately 2/3 ofar mile west from its intersection with Spring Creek Road (State Route 3001) and 1 34 miles east from its intersection with Rock Road (T-376) located in Benner Township. Surveyor /1 Engineer: PennTerra Engineering, Inc., State College, Pa. Tract History: a) The property being subdivided comprises 24.945 acres and is owned by Barns Lane Development, LLC. b) This proposal constitutes a Final Plan submission showing the subdivision of ten (10) lots; nine (9) lots being proposed for single-family residences and one (1) lot having an existing single-family residence located thereon. ARTICLEV- = MAJOR RESIDENTIAL: SUBDIVISION 512. D. 518. A. A.3. Final Plan Submission Provide this office with a completed copy oft the Department of Environmental Protection (DEP) Sewage Facilities Planning Module and corresponding written evidence of DEP approval. Additional Supplemental Requirements Supporting Data Provide written confirmation from the Benner Township Zoning Officer indicating the proposal meets or exceeds all applicable regulations per the Benner Township Zoning Ordinance. site, provide this office with written evidence from the Bellefonte Fire Department indicating A.3. (cont.) In order to ensure that emergency vehicles are able to safely provide adequate services for the they" ve had an opportunity to review the plan, noting any comments. This office acknowledges receipt oft the following drafts for staffreview. Declaration of Sewer Easement (on Lot 8 serving Lot 10); Declaration of Sewer Easement (serving Lot 9); and, A.6. Declaration of Shared Access and Utility Easement and Maintenance Agreement. Once found acceptable, the applicant will be instructed to execute, record, and note source of title (where recorded) for each on the plot plan. And once recorded, provide this office with a recorded copy of each instrument for our file. Barns Lane Subdivision - Continued Page 2 of2 B. Improvements B.1.&B.2. The cartway within the proposed 50-foot wide shared driveway shall be constructed to standards found in Section 5.101 Private Driveway Access Easements of the Benner Township Street Standards Ordinance (i.e., private driveway access easements shall be designed to provide a driveway to accommodate the type and volume oft traffic anticipated to be generated and shall be constructed toj provide a sound, all-weather driving surface, reasonably smooth and free from mud, dust or standing water. The private driveway access easement shall be a minimum of fifty (50) feet in width with a maximum allowable grade oft the constructed cartway to not exceed twelve (12) percent slope finished grade. The private right-of-way must be maintained in ai non- The private driveway access easement must be constructed and found acceptable by Township review and inspection prior to Final Plan approval. Accordingly, provide written documentation from Benner Township indicating the 50-foot wide private right-of-way is in compliance with erodible condition. the Benner Township Street Standards Ordinance. C. C.4. C.7. C.2. C.3. Certificates Obtain the original signature of the owner of the property being subdivided and execute the Obtain the original signature of the Benner Township Sewage Enforcement Officer and exècute Obtain the approval signatures ofthe Benner Township Planning Commission and Benner. Upon completion of the above, obtain the approval signature of the Centre County Planning Certification of Ownership Certification Block. the Sewage Disposal Review Block. Township Board of Supervisors. Commission. General Comments Through routine review by the staff, the above-referenced property may be subject to the regulation per Act319, entitled: Pennsylvania Farmland and. Forest Land. Assessment Act of1974. (More commonly Accordingly, the proposed subdivision activity might impact the property's existing taxing structure, For clarification, we encourage the Applicant to contact the Centre County Assessment Office (as soon as possible) to obtain the necessary information pertaining to this matter - Phone: (814)355-6721. referred to as the "Clean & Green Law"). including the possibility of"rollback taxes". Subject to the review comments from the Benner Township Zoning Officer as well as completion of the items noted above, including the approval signatures of the Benner' Township Planning Commission and the Benner Township Board of Supervisors, staffrecommends conditional Final Plan Approval. #2 Benner Pike Tru by Hilton Hotel & Retail Building (plan dated: December 7, 2023; last revised: February 15,2 2024) FinalLand Development Plan Two (2) Buildings (Commercial) Benner' Township Location: Along the eastern boundary of Benner Pike (State Route 0150), across from the bowling alley and approximately 800 feet south of the entrance to the Penn Eagle Industrial Park in Benner Township. Engineer: PennTerra Engineering, Inc., State College, Pa. Tract History: a) Thej property being developed comprises 6.356 acres, is home to, and contains the existing executive offices of G.M. McCrossin, Inc. c) This proposal constitutes a Final Plan submission showing the development ofas 98- guestroom hotel and a 12,000 square foot retail building along with corresponding infrastructure (i.e., stormwater management, access road, parking, lighting, etc.). ARTICLE VII - LAND DEVELOPMENT 718. A.10. Final Plan Requirements Once the gas lines have been installed, locate and label the 20-foot wide easement to the benefit ofColumbia Gas ofl Pennsylvania, Inc., per Record Book 2154, Page 359, noting the width and source oftitle. A.17. 719. A. A.1. Label the material type and size of the proposed gas line that will serve the hotel. Additional Supplemental Requirements Supporting Data engineering details. Awaiting receipt oft the Benner Township Engineer's review and approval of the required A.3. (cont.) Provide a completed copy of the approved Traffic Impact Assessment (TIA) and corresponding A.3. (cont.) Provide written evidence from PennDOT indicating the existing low volume driveway permit is evidence of PennDOT approval. adequate for this proposal. If PennDOT determines a new driveway permit is required for this proposal, provide a copy of an approved Highway Occupancy Permit (HOP), noting the permit number on the plot plan. A.3. (cont.) Provide written evidence from Columbia Gas indicating their willingness and ability to provide service for this proposal. Benner Pike Tru by Hilton Hotel and Retail Building Land Development - Continued Page e2of3 A.3. (cont.) In order to ensure that emergency vehicles are able to safely provide adequate services for the site, provide this office with written evidence from the local fire chiefindicating they' ve had an Awaiting receipt of the Centre County Conservation District's (or DEP, as applicable) review and approval oft the required Erosion and Sedimentation Pollution Control Plan. Provide this office with a draft copy ofa a grading easement for staff review. Once found acceptable, the applicant will be instructed to execute, record, and note source of title (where recorded) on the plot plan. And once recorded, provide this office with ai recorded copy for our opportunity to review the plan, noting any comments. A.5. A.6. file. A.6. (cont.) This office acknowledges receipt oft the following for staff review. Declaration ofTermination and Abandonment of Easement; Agreement ofTermination and Abandonment ofl Easement; and, Declaration of Amended Stormwater Drainage Easement. Once found acceptable, the applicant will be instructed to execute, record, and note source of title (where recorded) for each instrument on the plot plan. And once recorded, provide this office with ai recorded copy of each for our file. A.6. (cont.) Provide this office with a draft copy oft the proposed 50-foot wide utility and access easement for staff review. Once found acceptable, the applicant will be instructed to execute, record, and note source oftitle (where recorded) on the plot plan. And once recorded, provide this office with a Clarify ift this proposed easement will include language for the two (2) proposed future access recorded copy for our: file. easements. Improvements B. B.1.&B.2. Upon satisfactory completion of the above plan requirements (per subsequent written concurrence from this office), the applicant shall construct all required improvements as a condition pending final plan approval; or in lieu of, post adequate surety to guarantee same. Note: In either case, the applicant shall request a final site inspection (in writing) by the Benner Township Engineer and Planning Staff, with written correspondence noting approval to be generated by the Benner Township Engineer upon satisfactory completion ofa all required improvements. Certificates C. C.1. Obtain the signature of the Professional Engineer responsible for the plan (i.e., Execute the Engineer's: Stormwater Certification Block). Professional Land Surveyor Certification Block). C.1. (cont.) Obtain the signature of the Professional Land Surveyor responsible for the plan (i.e., Execute the Benner Pike Tru by Hilton Hotel and Retail Building Land Development = Continued Page: 3of3 C.4. Obtain the original signature oft the owner oft the property being developed and execute the Certification of Ownership Block. C.4. (cont.) Execute the Storm Water Facilities Acknowledgement block (Landowner). C.2. C.3. Obtain the approval signatures oft the Benner Township Planning Commission and Benner Upon completion oft the above, obtain the approval signatures oft the Centre County Planning Township Board of Supervisors. Commission. General Comments Execute the Benner Township Stormwater Certification Block. Subject to the review comments from the Benner' Township Engineer as well as completion oft the items noted above, including the approval signatures of the Benner Township Planning Commission and the Benner' Township Board of Supervisors, staff recommends conditional Final Plan Approval. Development Investment Advisory SunCap PROPERTY GROUP" February 9, 2024 Mr. Christopher Schnure 420 Homes Street Bellefonte, PA 16823 RE: Bellefonte Warehouse Penntech Boulevard Subdivision and] Land Development Planner Centre County Planning & Community Development Office Benner' Township, Centre County, PA 16823 Dear Chris: On behalf of our client, we: request a formal withdrawal of the land development plan application for the We respectfully request that this land development plan be removed from pending conditional plan approval status as further time extensions will not be requested. Please feel free to contact mei ify you have questions or Bellefonte Warehouse. located on tax parcels 12-5-500Y, 12-5-500L, and 12-5-500X. require any additional information. Respectfully Submitted, Brian Dunn Development Associate CC: Ray Stolinas The Carnegie Building 6101 Carnegie Blvd, Suite 180 Charlotte, NC2 28209 (704)945-8000 Main (704) 945-8001 Facsimile suncappg.com Attachment #2 February 2024 Centre County MPO Upcoming Activities Month Committee Day Date Wed 2/14/24 9:30AM Wed 4/10/24 9:30AM Wed 6/12/24 9:30AM Time Technical Technical Technical 2024 CCMPO Technical and Coordinating Committee(s) MEETING SCHEDULE February Coordinating Tues 2/27/24 6:00PM April Coordinating THURS 4/25/24 6:00PM June Coordinating Tues 6/25/24 6:00PM Month Committee Day Date Wed 9/11/24 9:30AM Wed 11/13/24 9:30AM Time Technical Technical September Coordinating Tues 9/24/24 6:00PM November Coordinating Tues 11/26/24 6:00PM CCMPO Duties and Function The CCMPO is a transportation planning organization that works in partnership with the Pennsylvania Department of Transportation (PennDOT), Federal Highway Administration (FHWA), and the Federal Transit Administration (FTA) to fulfill federal and state metropolitan transportation planning requirements for Centre Members oft the MPO serve as transportation decision makers, monitoring the planning process, receiving information from staff and other planning agencies, and making decisions considering that information and The policy-making body of the CCMPO is the Coordinating Committee, which is responsible for the The Coordinating Committee is advised by the Technical Committee, which provides comments and County (the State College PA Urbanized Area). their knowledge of the transportation needs within Centre County. transportation planning activities mandated in federal laws and regulations. recommendations on an ongoing basis. 2055 Long Range Transportation Plan Development has Begun The CCMPO has begun working on the 2055 Long Range Transportation Plan which will be adopted not later than September 23, 2025. The LRTP is the foundation of transportation planning and program 1 development or programming. It identifies transportation needs from a variety of sources: County, plans that identify transportation needs as well as other infrastructure needs and uses int the public municipal, and specialized right-of-way. 2025-2028 Centre County Transportation Improvement Program (TIP) MPO: staff received aj presentation regarding the draft 2025-2028 Transportation Improvement Program (TIP). Staff reviewed the preliminary project priorities for the 2025-2028 TIP. Key inclusions of state bridge projects include 18 carryover projects, 14 new bridge projects, with 71 bridge preservation projects in 4 years. Highway project priorities include: Centre County Concrete Preservation Project - construction phase - $3,000,000 Route 150/Phoenix Avenue Intersection Improvements - all phases-s $5,734,535 Atherton Street Drainage/Repaving Section 154 - prelim engineering/final design/Utility/ROW $2,630,450 Allen Street Improvements TIF = construction phase - $3,000,000 Route 26. Jacksonville Road Betterment construction phase $1,033,418 State College Area Connector - preliminaryenginerineering-51,000,000 2024 Centre County MPO Work Plan The CCMPO's staff will continue working to implement the actions recommended in the CCMPO Strategic Plan adopted in. June 2023. The workplan is intended to aid members in planning for and participating in committee activities. The work plan includes listings for the following: 0 Anticipated opportunities for public comment on plans and major projects O Committee Meetings Schedule o Al listing of expected opportunities o Scheduled bicycle outreach activities o Potential focus areas fori the Technical Committee o Expected reports and action items for each meeting Submitting Comments to the CCMPO Through they year members of the CCMPO committees and other stakeholders can expect several opportunities to provide comment on plans and projects. The following list highlights upcoming known or expected comment periods: CCMPO 2025-2028 TIP - 30-day public comment period - April - May SCAC - Public input meeting on alternative development Centre County Active Transportation Plan - survey, meetings and public comment period Centre Region Comprehensive Plan Update - survey, meetings and public comment period 2 Carbon Reduction Program (CRP) Through the CRP Program, Centre County will be receiving an allocation of $693,954 in 2024, and an allocation expected to total $2,836,000 over the FY 2023-2026 TIP. During previous meetings CCMPO Based on the eligible project list found in the guidance, and in consultation with FHWA, PennDOT District 2-0 staff, CCMPO staffi is suggested the following project ideas in order of preference: o Design Phase South Atherton Street that intersects East Branch Road and University Drive O Projects awarded TA Set-Aside funds but do not have enough funds to finish the project that o Possibly previously unfunded TA Set-Aside projects applications with further review o Possibly TA Set-Aside projects currently ini the review phase by PennDOT and awaiting award staff have identified a number of potential uses for the 2024 funds. signa/intersection upgrade construct a newi facility such as a new bike path or sidewalk CCMPO Updates Effective with the CCMPO Coordinating Committee meeting to be held Tuesday, February 27, 2024, MPO members and the public should be aware that all CCMPO meetings recorded by C-NET for re- The Bridge investment Program is currently taking Bridge Project Applications for FY 2023 and 2024 with a deadline of March 19, 2024.The deadline for requesting PennDOT support for Bridge Project applications is March 4, 2024. Additional funding years are provided and can be found here: BIP - Funding Programs - Bridges & Structures FHWA. PennDOT factsheet for their involvement can be On January 30, 2024 PennDOT announced their ARLE grant recipients and the following two o College Township $146,320 fori traffic signal upgrades on the Route 26 corridor including advanced radar units, new signal heads with reflective back plates, louver systems and review split phasing or new pavement marking gnmenv/atrangement at Route 26 and U.S. 322 Ramps. o Harris Township $298,349 to designate, design and install a bike/pedestrian crossing point on Boal Avenue at the Pennsylvania Military Museum entrance/Old Boalsburg Road intersection. On March 26, 2024 from 9:001 to 11:00 a.m., CCMPO staff will host an MPO 101 information session at the Centre Region Council of Governments building (2643 Gateway Drive, State College). All CCMPO Technical and Coordinating committee members are welcome to attend. broadcast will feature closed captioning. found here: PennDOT Grant Alert Bridge Investment Program. municipalities were awarded funds: 3 Attachment #3 CENTRE COUNTY PENNSYLVANIA PLANNING AND COMMUNITY DEVELOPMENT OFFICE Willowbank Office Building 420 Holmes Street Bellefonte, Pennsylvania 16823-1488 Telephone (814)355-6791 FAX (814)355-8661 www.centrecounypagor BOARD OF COMMISSIONERS MARK HIGGINS, Chair AMBER CONCEPCION STEVEN G. DERSHEM DIRECTOR RAYMOND. J. STOLINAS, JR., AICP ASSISTANT DIRECTOR ELIZABETHA. LOSE CENTRE COUNTY PLANNING COMMISSION MEETING February 20, 2024 oft their status. The following County Planning Director Update consists of summaries of all initiatives or updates completed within the previous month for the purpose of informing County Planning Commission members COUNTY PLANNING DIRECTOR UPDATE 1. WALKER TOWNSHIP APPLICATION FOR CONDITIONAL USE I T.P. 4004,001,000-OHA M. On January 4, 2024, our office received a copy of the Walker Township Conditional Use Application executed by John M. Glick for property at 126 Hoy Road. Consequently, our office performed a prior Zoning Map Amendment review on September 19, 2023, where Mr. Glick requested a zoning change of the 2.0 ac. parcel designation from Agricultural (A) to General Commercial (C). As a result, we received adopted Walker Township Ordinance #220, dated December 11, 2023, that includes "Contractor's Shop and Yard" as a Conditional Use in the Agricultural (A) District, as opposed the original zoning district map amendment. The tax parcel contains an existing +9,000 ft.2 metal building that originally housed agricultural produce processing, and now, the owners have modified the use to operate a roofing business that is not permitted under the current ordinance and zoning district. Staff provided input to "Criteria for Conditional Uses", whether the proposed use will adversely affect the neighborhood or create an undue hazard or nuisance to adjoining properties, in addition to parking, loading, circulation, pedestrian: safety ands screening and buffering. 2. FERGUSON TOWNSHIP ECONOMIC DEVELOPMENT, GROWTH AND INNOVATION STRATEGIC MASTER PLANJAPPALACHAN REGIONAL COMMISSION AREA DEVELOPMENT PROGRAM GRANT Our office received a request from Assistant Township Manager, Jaymes Progar, that Ferguson Township intends to apply for Appalachian Regional Commission Area Development Program Grant funds to assist in the formulation of an Economic Development, Growth and Innovation Strategic Master Plan. Ferguson Township retains a proactive approach in developing various Strategic Planning elements, since 2006, to the most recent Strategic Plan from 2023 that embraces public involvement and input through both surveys and focus groups. Staff determined that this effort is consistent with the. 2013 Centre Region Comprehensive Plan &ELSIE S. GLICK (1.25.2024) LETTER OF CONSISTENCY (1.29.2024) and various parts of Phase llof the Centre County Comprehensive Plan. 3. POTTER TOWNSHIP ZONING MAP AMENDMENT I SCOTT A. & KIMBERLY A. BURK (T.P. #20-008- OnJ January 18, 2024, Gerald Stover, Potter Township Zoning Officer supplied an email request for this officet to review the proposed Zoning Map Amendment for 25.55 acres currently zoned Agricultural (A) to be considered Planned Commerclal-industrlal (PCI). The application request supplied a narrative that outlines the reason for the zoning change: "To allow) for future build out of any commercial business. Due to the size of the property to have the entire property to be zoned PCI to allow) for more compatible commercial uses". The current parcel contains a plant nursery, office, outbuildings and greenhouses. This is the second Zoning Map Amendment request this year as a result of potential State College Area Connector alternatives that have been proposed through the Planning & Environmental Linkages (PEL) Study, which recently removed the PA4 45 connection from the study. This request isi inj proximity to the proposed alternative routes. Staff commented that thes subject parcel is adjacent to other parcels within the PCIZ zoning district and consistent with minimum lot size, coverage and setback standards. However, it may be appropriate for Potter Township to revisit their future land use mapi that was originally developed through the Penns Valley Region back in. January 30, 2006. 4. POTTER TOWNSHIP ZONING MAP AMENDMENT I SHELBY L. & ALISON L. LUSE (T.P. #20-008- OnJ January 18, 2024, Gerald Stover, Potter Township Zoning Officer supplied an email request for this office to review the proposed Zoning Map Amendment for 7.3 acres currently zoned Agricultural (A) to be considered Planned Commerclal-Industrial (PCI). The application request supplied a narrative that outlines ther reason for the zoning change: "To allow for future build out of any commercial business. Due to the proposed State College Connector by PENNDOT, either route option will significantly impact the property usefulness and appeal for anything other than commercial". The current parcel contains a personal residence served by a private well and septic system, and, upon further inspection of 2020 aerial photography, at least three adjacent outbuildings all encompass the eastern third of the parcel. The remaining acreage is wooded with a Spring Creek traversing the southwestern portion of the parcel along S.R. 322. This is the third Zoning Map Amendment request this year as a result of potential State College Area Connector alternatives that have been proposed through the Planning & Environmental Linkages (PEL) Study, which recently removed the PA45 connection from the study. This request is in proximity to the proposed alternative routes. Staff commented. that the subject parcel is adjacent to other parcels within the PCI zoning district and consistent with minimum lot size, coverage and setback standards. However, it may be appropriate for Potter Township to revisit their future land use mapt that was originally developed through the Penns Valley Region backi in. January 30, 2006. 006F4000,0.31.2024 002A,00001.31.2024 2