INFRAMARK MATERIMPRASTAVCTUNE OPERATIONS Ebensburg Municipal Authority Effluent Quality and Permit Compliance for [February] Monthly Report [02/28/22] Operations Plant returned 30.786million gallons of clean water to Howells Run All tests and operational requirements were met for January 5.850 tons of sludge sent to landfill No excursions for month Made plant rounds and equipment checks daily several times a shift Maintenance & Repair Made daily equipment checks and plant rounds several times a shift Cleaned influent screening unit daily back in service with no issues Replaced influent screening unit auger motor, unit Plant safety inspection complete for the month Ran generator 10 hours Friday 2-4-22due to power outage. Plant was manned and no issues due to the power failure Work orders complete for the month Ran centrifuge as needed for the month Caps This Month $572.72 $235.85 Contract Year to Date $12,195.99 $58,765.09 Remaining Balance $10,777.63 $17,048.12 Maintenance Cap $22,973.62 Sludge Disposal Cap $$75,813.21 INFRAMARK WATER INFRASTRUCTURE OPERATIONS MichaelJ. Montgomery Plant Manager- Ebensburg WWTP INFRAMARK WATER INFRASTRUCTURE OPERATIONS Ebensburg Municipal Authority January monthly report for WTP INFRAMARK OINFRAMARK WATER INFRASTRUCTURE OPERATIONS February 28, 2022 Ebensburg Borough 300 West High Street Ebensburg, PA 15931 Dear Authority Members, Attached is the monthly report detailing the operations and maintenance of the Ebensburg Water Treatment Facility for the month of. January. Sincerely, Luke Byrne Water Treatment Plant Summary The water treatment plant facility operated continuously for the month of. January Items Requiring Approval None Operations Plant operated 744 hours. Water treatment plant produced 26,537,000 gallons of water Saltlick pump station supplemented 1,861,103 gallons of water All routine monthly compliance samples were collected All monthly state reports were submitted Work Orders Inframark staff completed 53 work orders for the month of January Maintenance & Repair Inframark staff completed the following tasks in the month of January Calibrated all online compliance analyzers Calibrated all lab instruments weekly Adjusted the flows and chemical feed rates according to system demand Performed comparative grab samples for chlorine analyzers Verified online turbidity measurements against the bench top analyzer weekly Sump pumps exercised Dehumidifier replacement in DAF room Installed new gate at entrance DAF heater replacement Rebuilt raw' water valve solenoid Cleaned clarifier troughs Quarterly plant shut down test performed Chlorine room alarm test Greased finished water pumps/motors Alternated finished water pumps weekly Jar testing to optimize chemical usage Cleaned pH and turbidity meters weekly Sampled sludge blanket levels Monitored filter beds for deficiencies Cleaned facility Monthly Report Page1 1 Financial Update Maintenance Expenditures Vendor Ace Hardware Scanlan Electric Grainger Lowes Expense $380.35 $8.87 $911.65 $210.94 Description Dehumidifier/ Hardware for gate Brackets for gate sign DAF heater/ Raw water solenoid Electric Power washer Caps Caps For WTP Maintenance Cap Health & Safety without an accident/injury. Contract Total per Year $25,500.00 Previous Balance $3,566.11 Total Spent This Month $1,511.81 Remaining Balance $2,054.30 There were no accidents in the month of January. Personnel have worked 731 days Inframark Training and Presentations Weekly tailgate meetings COVID-19 news and updates Personal Protective Equipment Bulk chemical transfer SOP review Noteworthy Events On January 5th 2022, A new gate was installed at the entrance oft the WTP On. January 6th 2022, Inframark installed a new unit heater in the DAF room. On January 13th 2022, Inframark staff rebuilt a failing solenoid in the raw On. January 21th 2022, The facility experienced a power outage. During this On. January 26th 2022, Inframark staff completed first quarter Method 334.0 driveway. water vault. time staff tested quarterly shut down capabilities. on our chlorine analyzers. Monthly Report Page2 Personnel Name Luke Byrne Kyle Smiley Title Wastewater Operator Certifications PA Class A, E, Water Subclass 1,7,8,10,11 PA Class A, E, Subclass 1 Water Plant Manager Operator Ryan Lanzendorfer Operator in Training January 2022 lab results are available upon request. Luke Byrne, Plant Manager Monthly Report Page3