INFRAMARK WATER INFHAETRUETURH OPERATIONS Ebensburg PA Municipal Authority May 2022 Management, Operations & Maintenance Report June 27, 2022 Summary During May, Inframark continued to work toward safe and compliant operations. The Ebensburg Wastewater Treatment Plant treated 32.391 million gallons int the month of May. Critical Issues Projects Project Est. Date Status Priority Approval Complete Level Operations NPDES Permit Compliance 1. Please review the following tables that summarize NPDES reporting criteria for May 2022 2. There were no permit violations for the month May 2022 Influent Parameter Influent Flow (MGD) BOD5 (mg/L) BOD5 Load (Lbs.) TSS (mg/L) TSS Load (Lbs.) Average 1.044 160.0 1,177 105.0 756.0 Min .596 150.0 174.0 862.0 1,720 40.0 273.0 1,697 Max 3.772 Limit NA NA NA NA NA Excursion NO NO NO NO NO 296.0 Effluent Parameter CBOD5 (mg/L) CBOD5 Wkly Avg (mg/L) CBOD5 Load (bs) CBOD5 Load' Wkly Avg (Lbs) TSS (mg/L) TSS Wkly Avg (mg/L) TSS Load (Lbs) TSS Load Wkly Avg (Lbs) Eff pH (SU) Eff DO (mg/L) Fecal (CFU/100 mL) Fecal (CFU/100 mL) GE MEAN Average Min Max 2.0 1.9 2.0 2.0 15.0 10.0 16.0 10.0 1.2 0.6 1.2 1.0 9.0 5.0 9.0 5.0 7.07 6.97 9.28 8.90 72.0 24.0 Limit/Max Excursion 2.2 37.5/50 NO 2.1 37.5 NO 24.0 417/626 NO 20.0 417 NO 1.6 45/60 NO 1.4 45 NO 17.0 501 NO 12.0 751 NO 7.16 6/9 NO 10.10 Min6 NO 163.0 10,000 NO 2000 NO Maintenance & Repair Preventive Made daily equipment checks and plant rounds Plant safety inspection complete for the month Cut grass and weed eat around plant several times a shift Ran centrifuge weekly Swept and mopped control building floors weekly Replaced hot water tank Work Order Statistics 05/01/2022 To 05/31/2022 **The number closed int this time whether they were due in this time or some other time period. Number of Preventative WO's that were due Number of Corrective WO's that were due Number of Skipped WO's that were due Total Number of WO's that were due Number of Preventative WO's that were closed** Number of Corrective WO's that were closed** Total Number of WO's that were closed** Number of Preventative WO's still open Number of Corrective WO's still open Total Number of WO's still open 201 0 0 201 201 1 201 0 0 0 Performance Metrics Performance Metrics Wastewater treated, average MG Month of May 1.044N MG Month of May Total MG. Month 32.391 Max. MG Day 3.772 Revenue from Hauled-In Waste thru May 2022 Septage /Sludge received, gallons Sludge Hauled to Landfill None Tons to landfill 15.071 Tons Financial Update Contract Year to Date $5,365.83 $13,470.65 Remaining Balance $17,607.79 $62,342.56 Caps Maintenance Cap Sludge Cap Monthly Cap $1,914.47 $6,317.77 May 2022 $811.92 $3,971.16 Maintenance Expenditures Vendor Expense $59.33 $51.48 $29.67 $20.15 $13.00 $31.10 $78.39 $4.20 $151.27 $48.74 $23.10 $811.92 Description Ace Hardware Ace Hardware Ace Hardware Ace Hardware EXXONMOBIL Laurel medical solutions Sheetz Ace Hardware Ace Hardware Ace Hardware Ace Hardware Sheetz Total May 2022 Clog buster, Drain snake Pushl broom, Floor cleaner, Clog! buster Round up weed killer Gasi for mower, weed eater Surgical gloves Gas for mower $301.49 Hedge trimmer, Weed and grass killer, oilf for weed eater, Teflon tape Extension cord, weed eater line, hose repair fittings 3/4" copper fitting water tanki in! basement Weed and Grass killer Gast for mower Propane cylinder, plumbers' cloth, fittings, solder, to replace hot Health & Safety 1) Through the end of May, Inframark Ebensburg employees have worked 6,329 days without al lost time injury or recordable. 2) Held daily tailgate meetings with staff. Personnel Name Title Region Plant Manager Lab Manger Operator Operator in Training Operator in Training Wastewater Operator Certifications Jerry Shupe Jr. Vice President, Mid-Atlantic Mike Montgomery Sharon Burkett Randy Lauer Ryan Lanzendorfer Kyle Smiley PA Class A, E Subclass 1,2,3,4 PA Class A, E Subclass 1,2,3,4,5 PA Class A, E Subclass 1,2,3,4 None None Appendix May's 2022 Discharge Monitoring Report is available upon request. Michael J.J Montgomery Plant Manager INFRAMARK WATER INFRASTRUCTURE OPERATIONS Ebensburg Municipal Authority May monthly report for WTP INFRAMARK WATER INFRASTRUCTURE OPERATIONS June 27, 2022 Ebensburg Borough 300 West High Street Ebensburg, PA 15931 Dear Authority Members, Attached is the monthly report detailing the operations and maintenance of the Ebensburg water treatment facility fori the month of May. Sincerely, Luke Byrne Water Treatment Plant Summary The water treatment plant facility operated continuously for the month of May Items Requiring Approval None Operations Plant operated 744 hours. Water treatment plant produced 31,426,000 gallons of water Saltlick pump station supplemented 2,796,456 gallons of water All routine monthly compliance samples were collected All monthly state reports were submitted Work Orders Inframark staff completed 53 work orders for the month of May Maintenance & Repair Inframark staff completed the following tasks in the month of May Calibrated all online compliance analyzers Calibrated all lab instruments weekly Adjusted the flows and chemical feed rates according to system demand Performed comparative grab samples for chlorine analyzers Verified online turbidity measurements against the bench top analyzer weekly Lubricated blower motor Ladder inspection Replaced push block tubbing on CL17 chlorine analyzer Greased DAF recycle pump Adjusted tensioners on the DAF weir Installed new sump pump in raw water meter vault Sump pumps exercised Installed LED lighting in clarifier room Chlorine room alarm test Greased finished water pumps/motors Alternated finished water pumps weekly Jar testing to optimize chemical usage Cleaned pH and turbidity meters weekly Monitored filter beds for deficiencies Cleaned facility Monthly Report Page1 Financial Update Maintenance Expenditures Vendor Hach The Meter Guy LLC Expense $677.07 $550.00 Description Raw water valve seal kit installation Plumbing supplies for raw water valve Caps Caps For WTP Maintenance Cap Health & Safety Contract' Total per Year $26,010.00 Previous Balance $22,179.67 Total Spent This Month Remaining Balance $1,227.07 $20,952.60 There were no accidents in the month of May. Personnel have worked 851 days without an accident/injury. Inframark Training and Presentations Weekly tailgate meetings COVID-19 news and updates Personal Protective Equipment Tool safety DEP hold study SOP Noteworthy Events On May 3rd second quarter disinfection by-product samples were collected. Sample site 701 airport exceeded the maximum contaminant level (MCL). A public notice was issued via swift reach and all appropriate paperwork was On May 11"staff discovered the raw water meter vault was filling with water due to sump pumpi failure. The vault was pumped out and a new sump pump Onl May13th the hillcrest tank washoutinspection project was completed, and On May 15th Inframark increased water production at the WTP and began On May 17th Mr. Dwayne Lowry, Inframark's senior technical manager, visited Ebensburg to develop recommendations to resolve the reoccurring filed with PA DEP. was installed. the south tank was placed back online. supplying Nanty Glo with 300GPM. Monthly Report Page2 disinfection by-product violation. Ar meeting with Mrs. Cook and Stiffler McGraw has been scheduled for June 23rd to discuss Inframark's OnN May 19th the water treatment plant flow meters were calibrated. This annual requirement ensures the accuracy of the plant influent and effluent On May 27th Nanty Glo closed the interconnect and stopped purchasing water. Flows and chemicals were adjusted throughout the day to return the recommendations. flows. plant to normal operating conditions. Personnel Name Luke Byrne Kyle Smiley Title Wastewater Operator Certifications PA Class A, E, Water Subclass 1,7,8,10,11 PA Class A, E, Subclass 1 Water Plant Manager Operator Ryan Lanzendorfer Operator in Training May 2022 lab results are available upon request. Luke Byrne, Plant Manager Monthly Report Page3