MS-94407-21 PROPOSAL & CONTRACT (WHEN EXECUTED) (THIS PROPOSAL INCLUDES INSTRUCTIONS TOI BIDDERS) pennsylvania DEPARTMENT OFT TRANSPORTATION A. DEPOSIT OF PROPOSALS. All envelopes containing Bidj proposals shall be clearly marked' "Pave. Bid" proposals for Sealed Proposals willl be received on or before Bids willl be opened and read at approximately Milton Borough Jessie Novinger 2Filbert Street Milton, PA 17847 Municipality Name and' Type Borough Manager Address letting July 10,2024 Date 10:30 AM Time 11:00 AM Time on the above letting date on the above letting date. Proposals must be mailed or otherwise delivered to the above address. 1. The contractor proposes to furnish and deliver all materials (including Form CS-4171, CERTIFICATE OF COMPLIANCE and/ or TR-465 DAILY ASPHALT: MIXTURE CERTIFICATION) and to do and perform all work on the following project as more specifically set forth int the Schedule of] Prices (Attachment), in and special requirements contained herein and/ or attached hereto and current PennDOT Specifications (Publication 408), except (a) bidders need not bej prequalified by PennDOT (Sec.102.01), and (b) Volumetric 2. Ifdesignated as the successful bidder, the contractor willl begin work on the date specified in the notice to proceed. Or isn not completed on time, liquidated damages will be assessed at the rate of$ 975.00 per additional working day. 3. Accompanying this proposal is a certified check or bid Bond in the amount of_ 10 %ofBidi made payable to the municipality as aj proposal guarantee which, iti is understood, willl be forfeited in case the contractor fails to comply with accordance with drawings and specifications on file at testing of Asphalt paving materials is not required (Sec. 413). as otherwise provided int the special requirements, and will complete all work on or before Oct.31 2024. Ifall work the requirement oft the proposal. B. PROPOSAL OF: Name of Contractor Address CONTRACTORS CERTIFICATION Itis hereby certified as follows: 1. The only person(s) interested in this proposal as principal(s) is (are): 2. None oft the above persons are employees oft the municipality. 3. This proposal is made without collusion with any other person, firm, or corporation. 4. All plans and specifications referred to above and the site of the work have been examined' by the contractor. The contractor understands that the quantities indicated herein are approximate and are subject to change as may be required; and that all work is payable on the basis of the unit prices listed on the Schedule of Prices (Attachment 1). -1- 5. The contractor will comply with all requirements oft the laws and implementing regulations ofthe Commonwealth of Pennsylvania and the United States relating to human relations, equal opportunity and non-discrimination in employment, and will pay to workmen employed int the performance oft the contract the wages to which they may be entitled." 6. The contractor will provide the municipality with aj performance bond, conditioned upon the faithful performance of the contractor in accordance with thej plans, specifications and conditions thereof, and aj payment bond conditioned on the prompt payment ofall material furnished and labor supplied or performed in the prosecution ofthe work, in accordance with the Public Work's Contractors' Bond Law of 1967; and an affidavit accepting the provisions oft the Workmen's 7. "Thej parties agree that the relationship between the Contractor and the Township is one ofi independent contractor and not the employer/employee and that the individual employees oft the Contractor who will be performing the work pursuant tot this contract are not employees oft the Township. Contractor hereby certifies, represents and warrants to the Township that all persons performing any aspect oft the work pursuant to this Contract who are required to have commercial driver's license are subject to aj program for drug and alcohol testing in accordance with the Omnibus Transportation Employee Compensation Act of1915, as amended. Testing Act of1991 and the federal regulations adopted pursuant thereto." Contractor BY: Title WITNESSED OR ATTESTED BY: (Seal) Title SEAL TO: BE EXECUTED ONLY IN THE EVENT THE ABOVE PROPOSAL IS ACCEPTED ACCEPTED ON: Date Municipality ATTESTED BY: Title BY: Title Title Title SEAL ATTACHMENTH1 LOCATION OF WORK: Milton Borough, Northumberland County STREET/ROADI NAME Turbot Av SR 254 Broadway to Center Turbot Av Start 50' prior to bridge South to SR6 642 Mahoning Turbot Av Susq to Columbia Turbot Av King to Wood Fairview Av Turbot Eastward L' 880 W D" TYPE OF WORK UNITS QUANTITY 30 2.00 Milling of Asphalt. Pavement Surface SY 880 30 2.00 Asphalt Wearing Course, Fine Grade Ton 1,650 28 2.00 Milling of Asphalt Pavement Surface 1,650 28.0 2.00 Asphalt Wearing Course, Fine Grade Ton 190 23.0 2.00. Milling of Asphalt Pavement Surface SY 190 23.0 2.00 Asphalt Wearing Course, Fine Grade Ton 375 26.0 2.00 Milling of Asphalt Pavement Surface 375 26.0 2.00 Asphalt Wearing Course, Fine Grade Ton 2,934 352 1 5,134 616 1 486 59 1,084 130 1,750 219 Traffic Signal Loop Sensor Ea SY Ea Traffic Signall Loop Sensor SY 630 25 2.00 Pavement Milling of Asphalt Surface SY Includes asphalt curb] Lt &F Rt 630 26 2.00 Asphalt Wearing Course, Fine Grade Ton DESCRIPTION OF WORK: Milling of Asphalt Pavement Surface This work is the milling and removal of an existing Asphalt pavement surface, with specified equipment, to1 the depth indicated in accordance with Publication 408 Section 491 and as directed by the municipality. Borough toi retain all. millings, coordinate disposition ofmillings with the Borough. Asphalt Wearing Course 9.5mm Fine Grade includes Asphalt Curb on Fairview Avenue as directed. Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, <0.3 Million ESALS, 9.5 MM: FG Mix, SRL-L Furnish and place Asphalt Wearing Course: material at 1.5" compacted depth across entire cross-section ofroadway, Superpave Asphalt Mixture Design, Wearing Course, PG64S-22, <0.3 Million ESALS, 9.5. MMI FG Mix, SRL-L (60 lb Scratch Course): Furnish and place Asphalt Wearing Course toi restore the cross-section ofr roadway. Incidental to this item of work is Asphalt Tack Coat in accordance with the Publication 408 Section 460 on existing roadway. And -3a- ATTACHMENTH1 Continued DESCRIPTION OF WORK: Loop Sensor This work ist the furnishing and installation of devices to sense the presence or passage ofv vehicles or pedestrians. Ina accordance with Publication 408 Section 956, the attached Standard Special Provision and Traffic Plans. STANDARD SPECIAL. PROVISION Provision Name: t030467 ITEM 4956-0101 - LOOP SENSOR (3TURNS) ITEM 4956-0101 - LOOP SENSOR (3 TURNS) Provision Body In accordance with Section 956 and as follows: 956.3 CONSTRUCTION 965.3(a)1. Loop Detector. Revise sixth sentence of first paragraph to read: Install three (3) turns of loop sensor wire for all loops. Add the following: Contact the District Traffic Engineer three (3) days in advance of loop sensor installation at (570) 368-4250 or (570) 368-4260 for spotting loop sensor location. All loop sensor locations must be spotted in the presençe of the District Traffic In areas of bituminous pavement, install loop sensors the same time as performing Ensure detector lead-in is connected to the appropriate terminal and loop amplifier is Ensure the signal controller is receiving input from the loop detector amplifier and is Engineer or their representative. milling operations and before placing the wearing course. tuned and functioning. providing operation in accordance with the traffic signal permit. Notify the Project Manager of any detected malfunction(s). -3b- ATTACHMENTHI Continued DESCRIPTION OF WORK: NOTES: The contractor is responsible to insure that the proper material is provided by supplying: 1. A copy ofa an approved PennDOT. Asphalt Mix Design ai minimum of5 working days prior to the start oft the 2. The contractor will also supply the municipality with al Daily Asphalt Material Certification on a TR-465 or CS- 4171, supported by testing, within 241 hours of placing the Asphalt material for each day's placement. work. 3. Furnish all Certified Weigh Slips. The municipality will withhold payments if all the above requirements are not met. Note: Incidental to the above items is Mobilization, cleaning and sweeping ofroadway prior to applying tack coat, milling ofp paving notches at beginning, endings and allj paved driveways and paved intersections and picking up and disposal of all milled joint materials, furnish and place Asphalt Tack Coat on existing roadway, sealing all finished joints, Grade Adjustment of Existing Miscellaneous Structures and Traffic Control according to the Publication 408 Section 901. All work must be completed in accordance with the current PennDOT Publication 408 Specifications and its supplement. All work ist to be completed by October 31, 2024. Price. Adjustment of Asphalt Material - Section 110.04 Asphalt Price. Adjustment and a copy with the final invoice. Milton Borough, Northumberland County The contractor must also provide the municipality a copy of the price adjustment calculation prior toj placing any material Schedule of Prices Description of Work Milling of Asphalt Pavement Surface Item No. Quantity Unit 1 11,388 SY Unit Price Total 2 3 4 1,376 Ton Asphalt Wearing Course9.5 mm, Fine Grade 2 Ea 1 LS Loop Sensor Materials /Ton June 2024, District 3-0 Asphalt Price. Adjustment of Asphalt N/A N/A IB=$ Total Amount of Contract 3c- CountyMILT SR 642 LMAHONING STI ANE HIN LTNE TURBOT AVENVE 06 USE PAVED ALLEY FAE STOUSE PAVED ALLEY SR 254 sT AND TURBOT 03 FLASHING a D3 B G8B) *O WAY LINEa DADWAY SREET LEGAL INE a 6 3 g EGAL RIGHT F-WAY obar STREET LEGAL RIGHTOFW WAY MFARCPPSSAENA- MS-944 PROPOSAL AND CONTRACT INSTRUCTIONS - FORM944 1. Thej proposal must bet typewritten or printed. 2. Ifmore than one proposal on any project is submitted by any individual, firm or partnership, corporation or association under the same names, only one. lowest proposal willl be considered. 3: Description of work--- A. Ifadditional space is needed, insert appropriately numbered attachment and note "Continued on B. Where Binder Surfaces are aj part ofthis Contract, Average Daily Traffic (ADT) Count must be Attachment No. included in the description. 4. Part A of Page 1 to be completed by municipality. Part B of] Page 1 to be completed by contractor. Schedule of Prices- - Column #1 (Item), #2 (Approximate Quantities), #3 (Unit, i.e., ton, square yard, linear feet, etc.) and #4 (Description, i.e., Asphalt materials- - ID-2, FJ1, FB1, BCBC, etc.) must be filled in by the municipality to insure équitable bidding. Column #5 (Unit Price), #6 (Total), and total amount oft bid must be filled in by the contractor. Ifmore space is needed, add note at bottom oft the page: Continued on. Attachment No. 1-A," and add additional sheet designated as Attachment No. 1-A, 1-B, etc. Repeat for each additional sheet required. 5. Ifliquidated damages are to be assessed, add the following sentence to Part A #2. "Ifall work is not completed 6. Payment and Performance bonds are provided only by the successful bidder. Contracts under $5,000- - bonds must bei in 50% of the contract amount. Contracts in excess of $5,000 - bonds must be in 100% of the contract amount. Bond Form MS-944 Attachments 2 and 3 and Workmen's Compensation Affidavit Attachment 4 must be submitted by the successful bidder within 20 days oft the contract award. Failure to submit the bonds shall 7. Construction projects, where the estimated cost oft the total project exceeds $100,000, are subject to the provisions oft the Pennsylvania Prevailing Wage Act 442. It is the responsibility ofthe municipality to obtain the Prevailing Wage Scale for the area and include iti in the proposal. IF the Prevailing Wage Act applies, this fact On projects utilizing Federal revenue Sharing Funds, ifthe project cost exceeds $2,000 and is financed with 25% or more. Federal Revenue Sharing Funds, the Davis Bacon Act applies. Again it is the responsibility of the municipality to obtain the Davis Bacon Wage Rates, include them int the proposal and note the fact in the advertisement. Ifboth Acts are applicable, the Davis Bacon Act has preference over the Pennsylvania Prevailing 8. An ESCALATOR CLAUSE is optional; however, ifused, it must bei included in the proposal prepared by the on time, liquidated damages will be assessed at the rate of$ working day." (OR"...as set forth in the attached schedule.") per additional constitute grounds to cancel the contract. shall be noted int the advertisement. Wage. Act. municipality. An escalator clause may not bei inserted by the contractor. *(1961, Aug. 15, P.L. 987; 431 P.S. . 165) 4- MS-944 (02-01) (REPRODUCE LOÇALLY) PERFORMANCE BOND (With Corporate Surety) Attachment 2 KNOW ALL: MEN BY THESE PRESENTS, that we, (NAME AND. ADDRESS OF CONTRACTOR) as Principal and (SURETY COMPANY) ac corporation incorporated under the laws oft the State of as Surety (NAME OF STATE) are. held and firmly bound unto Int the full and just sum of ($ dollars lawful money ofthel United States of America, tol be paid to the above Municipality or its assigns, to which payment well and truly to bei made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, the above bouden Principal has entered into a contract with the above Municipality, bearing even NOW, THEREFORE, the condition of this obligations such that ift the bounden Principal, as Contractor, shall in all respects comply with and faithfully perform the terms and conditions of said Contract, including the Specifications and conditions referred to and made aj part thereof, and such alterations as may be made in said Specifications as therein provided, and shall well and truly, and in ai manner satisfactory to the Municipality fulfill all obligations as therein set forth, then this Obligation shall be void, but otherwise the same shall be and remain ini full: force, virtue and effect. Itis further provided that any alteration which may bei made int the terms oft the contract or its specifications with the express approval oft the Municipality or1 the Principal tot the other, shall not in any way release the Principal and Surety ore either or any ofthemi, their heirs, executors, administrators, successors or assigns from their liability hereunder, notice date herewith, for the undertaking of certain obligations as therein seti forth. tot the Surety ofa any such alteration or forbearance being hereby waived. IN WITNESS WHEREOF, the said Principal and Surety have duly executed this Bond under Seal, pursuant to due and legal action authorizing the same to be done on (DATEOFE BOND) SEAL Attest / Witness CONTRACTOR BY: TITLE TITLE SEAL Attest/ / Witness SURETY COMPANY BY: TITLE -1- TITLE MS-944 of PAYMENT BOND Attachment3 KNOW. ALLI MEN: BY THESE. PRESENTS, that we, as. PRINCIPAL and corporation incorporated under the laws oft the State of as SURETY, are in the full andj just sum of dollars, lawful money of the United held and firmly bond unto the. ($ States of America, to be paid to the said ori its assigns, to which payment well and true to be made, we. bind ourselves, our heirs, executors, administrators, successors and assigns,. jointly and severally, firmly by these WHEREAS, the above bounden Principal has entered into a contract with the above municipality, hereinafter called Obligee, bearing even datel herewith, for the improvement ofa certain section ofl highway or bridge in said presents. Municipality consisting of: for approximately the sum of ($ dollars. NOW, THEREFORE, the condition of this obligation iss such that ift the above bounden PRINCIPAL shall and willj promptly pay or cause tol be paid in full all sums of money which: may be due to contract or otherwise, to any individual, firm, partnership, association or corporation, for all material furnished or labor supplied or performed in the prosecution oft the work, whether or not the said material or labor entered into and became component parts of the work and for rental of the equipment used and services rendered by public utilities in, or in connection with the prosecution of The PRINCIPAL and SURETY, hereby, jointly and severally, agree with the Obligee herein that any individual firm, partnership, association or corporation, which has performed labor or furnished material in the prosecution of the work as provided, and any public utility. which has notl been paid in full therefor, may sue in assumpsit on this Payment Bond in his, their, or its own: name and may prosecute the same to final for such sum or sums as. may be justly due him, them or it, and have execution thereon. Provided, however, that the Obligee RECOVERY by any individual, firm, partnership, association or corporation hereunder shall be subject to the provisions oft the "Public Works Contractors' Bond Law of 1967", Act] No. 385, approved December 20, 1967,P.L. 869, which Act shall bei incorporated herein and made aj part hereof, as fully and completely as though its provisions were: fully Itis further provided that any alterations which may be made in the terms oft the contract or: ini the work to be done or materials to be furnished. or labor to be supplied or performed under it or the giving by the Obligee ofa any extension oftime for the performance oft the contract or any other forebearance on thej part of either the Obligee or the Principal to the other, shall not in any way release the PRINCIPAL and the SURETY or such work; then this obligation to be void, otherwise to remain in full force and effect. shall not be liable for the payment ofany costs of expenses of such suit. and at length herein recited. SURETIES of any such alteration, extension of forebearance being hereby waived. IN WITNESS WHEREOF, the said PRINCIPAL and SURETY: have duly executed this Bond under seal this Day of 20 WITNESS: CONTRACTOR BY: TITLE TITLE WITNESS: SURETYC COMPANY BY: TITLE -2- TITLE MS-944 Attachment 4 AFFIDAVIT RE ACCEPTING PROVISIONS OF THE WORKMEN'S COMPENSATIONACT State of ) ) )SS: ) ) County of he has It Being duly sworn according to law deposes and says that they have accepted the provisions oft the Workmen's Compensation Act of1 1915 of the Commonwealth ofl Pennsylvania, with its supplements and amendments, and have insured their liability hereunder ini it accordance with the terms of said has his its Act with (SURETY COMPANY). (TYPE ORI PRINT) BY: CONTRACTOR SIGNATURE Sworn to and subscribed before me this day of A.D.20 SIGNATURE My Commission Expires (DATE) -3- D-7126(7-21) ANTI-COLLUSION AFFIDAVIT County Municipality Project Number Fed. Project No. pennsylvania DEPARTMENT OF TRANSPORTATION State of County of (IfApplicable) The undersigned deponent deposes and says that they are the of the Company; that they are authorized to make this affidavit on behalf of said company in compliance with section 102.06 (e) of Department Specifications, Publication 408, as. amended and that the said company has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint oft free competitive bidding in connection with such contract. (Contractor) BY Sworn to and subscribed before me the undersigned notary public this day of Notary Public My Commission expires -4- MS-NCP pennsylvania DEPARTMENT OF TRANSPORTATION MUNICIPALITY NOTICE OF COMPLETION INF REFERENCE TO PROJECT: # Name of Contractor Performance of work as specified on the above numbered contract is completed and final pavement inspection has been made by the contractor and municipality in accordance with the terms of the contract awarded. DATE OF AWARD Signature of Municipality Signature of Contractor Both copies oft this form to be filled by the Contractor-Municpally on completion of final pavement restoration. THIS PORTION TO BE COMPLETED BY MUNICIPALITY FINAL COMPLETION CERTIFICATE By the affixing of my signature I hereby certify that final inspection has been made and all work has been performed in accordance with the above contract # and is hereby accepted by the municipality as completed. Authorized Agent for the Municipality *DATE * The contractor is responsible for maintenance of permanent pavement repairs fora period of one year from this date. -5- COMMONWEALTH OF PENNSYLVANIA PUBLIC WORKS EMPLOYMENT VERIFICATION FORM Date. Business or Organization Name (Employer). Address. City. State_ Zip Code ontractor S sJontractor (checkone) Contracting Public Body. Contract/Project No Project Description Project Location Asacontractor/subcontractor for the above referenced public works contract, Ih hereby affirm that as of the above date, our companyi is in compliance with thel Public Works Employment Verification. Act ('the Act') through utilization of the federal E-Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired post. January: 1, 2013 are Iti is also agreed to that all public works onracto/ubcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each authorized to work int the United States. new hire shall be maintained in the event of an investigation or audit. ,. law. authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by Authorized Representative Signature CS-4171 (11-11) pennsylvania DEPARTMENT OF TRANSPORTATION CERTIFICATE OF COMPLIANCE 1. COUNTY: OLR/SR: SEC/SEG: :- To be completed byt the party that will ship the material tot the project, otherwise leave ECMS#: blank.) 2. I/WE hereby certify that the material listed on line 5 was: Manufactured Fabricated Coated Precasted Produced By (Name of Manufacturer, Fabricator, Coater, Precaster or Producer) (Supplier Code) 3. and the party listed above certifies that the material(s) on line 5 meets the requirements of Publication 408, Section(s) AASHTO, ASTM, Federal or other designation 4. The material listed below is being shipped to: (Company Name) 5. LOTNO. QUANTITY APPROVED MATERIAL AS LISTED IN BULLETIN #1 14 or1 15 BULLETIN: #4 41 or 42 PRODUCERS, LIST HMA/PCC JMF. 6. CHECK, HERE IF YOUR PRODUCT CONTAINS IRON OR STEEL (AND check one of the following boxes, as appropriate.) I/WE certify the material identified above conforms with Section 106.01 of Publication 408 'Identifiable Stee!' or Fabricated Structural Steel (Section 1105). Either Steel products that contain permanent that identify that the material was melted and manufactured int the United States or which! have received inspection by the Department or a Department representative where verification of Mill Test reports was in-plant verify conformance with the PA Steel Procurement: Act. Only Form CS-4171 is required, J'Unidentified Steel" - Attach supporting documentation including invoices, bills of lading and mill test reports that positively identify thatt the steel was melted and manufactured in the United States. All manufacturing processes including coatings application (e.g. epoxy, galvanizing, or United States and we are maintaining copy(s), in our files ina accordance with Section106.03b)s. painting) Note: have While occurred in the materials themselves are not covered by Buy America, the application of these materials on steel or #1 Manufacturer, Fabricator, Coater, Precaster D#2 Distributor, Supplier or *Private below. asi indicated markings performed to coating iron must occur in the United States. 7. VENDOR CLASSIFICATION (CHECK ONE BLOCK ONLY)- Listed in Bulletin # 15, or Producer Listed in Bulletin # 14,41 or 42 Icertify that the above statements are true and to the best ofr myk knowledge, fairly and accurately describe the product(s) listed. 8. NAME (print): : COMPANYNAME: SIGNATURE Notl Listed in Bulletin # 15. Also, complete line9 Icertify that the material being provided to us by the manulacturer. supplied TITLE: Label Company and the same. as is one quantities listeda above are accurate. listed on this document. and DATE: (Company Name) By Responsible Company Official (QC Staff only ify you checked block #1 on! line 7) 9. List company that sold you the material(s) documented. above: (Complete ify you checked Block # 2 on line #7, otherwise leave blank.) BUREAU OF LABOR LAW COMPLIANCE PREVAILING WAGES PROJECT RATES Project Name: General Description: Project! Locality Awarding Agency: Contract Award Date: Serial Number: Project Classification: Determination Date: Assigned Field Office: Project County: Asphalt Paving Furnish and place approximately 1,3761 Ton Asphalt Wearing Course; 2E Ea Traffic Loop Sensors and perform 11,388 SY Milling Asphalt Pavement Surface. Northumberland County Milton Borough 7/15/2024 24-05918 Highway 6/17/2024 Harrisburg Field Office Phone Number: (717)787-4763 Toll Free Phone Number: (800)932-0665 Norhumberland County Commonwealth of Pennsylvania Report) Date: 6/18/2024 Department ofLabor &1 Page 1of8 Industry BUREAU OF LABOR LAW COMPLIANCE PREVAILING WAGES PROJECT RATES Project: 24-05918. -E Building Effective Expiration Hourly Rate Fringe Total $59.00 $62.00 $65.25 $55.84 $86.57 $87.82 $56.58 $58.43 $60.28 $62.13 $61.85 $64.10 $66.10 $68.10 $52.78 $54.28 $50.50 $52.50 $54.50 $56.50 $55.60 $56.60 $54.82 $64.40 $66.03 $92.27 $99.95 $51.89 $65.14 $67.64 $41.14 $43.14 $45.23 $46.73 $47.23 $43.14 $52.54 $54.49 Department ofLabor &1 Page2of8 Date 7/1/2023 7/1/2024 7/1/2025 3/1/2024 1/1/2023 1/1/2024 4/30/2023 4/28/2024 5/4/2025 5/3/2026 1/1/2023 1/1/2024 1/1/2025 1/1/2026 6/1/2023 6/1/2024. 4/30/2023 4/28/2024 5/4/2025 5/,1/2023 5/1/2024 5/1/2023 9/1/2022 9/1/2023 1/1/2023 1/1/2024 5/1/2023 7/1/2021 7/1/2023 5/1/2023 5/1/2023, 4/30/2023 4/30/2023 4/30/2023 5/1/2023 5/1/2023 5/1/2024 Date Benefits $37.08 $21.92 $37.08 $24.92 $37.08 $28.17 $36.71 $19.13 $51.27 $35.30 $52.10 $35.72 $35.06 $21.52 $34.16 $24.27 $36.01 $24.27 $37.86 $24.27 $40.63 $21.22 $42.13 $21.97 $43.38 $22.72 $44.63 $23.47 $35.06 $17.72 $36.56 $17.72 $28.23 $22.27 $30.23 $22.27 $32.23 $22.27 $34.23 $22.27 $32.90 $22.70 $33.80 $22.80 $31.24 $23.58 $35.93 $28.47 $36.50 $29.53 $53.93 $38.34 $60.76 $39.19 $31.23 $20.66 $34.01 $31.13 $36.26 $31.38 $23.11 $18.03 $25.11 $18.03 $27.01 $18.22 $28.51 $18.22 $29.01 $18.22 $25.11 $18.03 $34.80 $17.74 $35.25 $19.24 Asbestos &1 Insulation Workers Asbestos & Insulation' Workers: Asbestos & Insulation' Workers Boilermaker (Commercial, Institutional, and Minor Repair Work) Boilermakers Boilermakers Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners Carpenters - Piledriver/Welder Carpenters Piledriver/Welder Carpenters - Piledriver/Welder Carpenters Piledriver/Welder Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft FloorLayers Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floorl Layers Cement Finishers & Plasterers Cement Finishers & Plasterers. Cement Finishers &F Plasterers Cement Masons Cement Masons' Drywall Finisher Electricians Electricians Elevator Constructor Elevator Constructor Glazier Iron' Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing) Iron' Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing) Laborers (Class 01 See notes) Laborers (Class 02- See notes) Laborers (Class 03 See notes) Laborers (Class 04- See notes) Laborers (Class 05- See notes) Laborers (Class 06- See notes) Marble Mason Marble Mason Commonwealth of Pennsylvania Report Date: 6/18/2024 Cement Finishers &F Plasterers 5A 13 5/3/2026 Industry BUREAU OF LABOR LAW COMPLIANCE PREVAILING WAGES PROJECT RATES Project: 24-05918-E Building Effective Expiration. Hourly Rate Fringe Total $56.44 $58.39 $62.16 $64.02 $65.95 $67.92 $71.81 $73.81 $75.81 $77.81 $74.72 $76.72 $78.72 $80.72 $71.44 $73.44 $75.44 $77.44 $74.36 $76.36 $78.36 $80.36 $67.91 $69.91 $71.91 $73.91 $66.44 $68.44 $70.44 $72.44 $65.86 $67.86 $69.86 $71.86 $64.72 $66.72 $68.72 $70.72 $84.97 $87.37 $89.77 $92.17 $84.52 $86.92 Department ofLabor & Industry Page3of8 Date 5/1/2025 5/1/2026 6/1/2023 6/1/2024 6/1/2025 6/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 43626 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026. 5/1/2023 5/1/2024. Date d. Benefits $19.24 $19.24 $22.95 $22.95 $22.95 $22.95 $29.24 $30.08 $30.92 $31.76 $29.90 $30.74 $31.58 $32.42 $29.15 $29.99 $30.83 $31.67 $29.82 $30.66 $31,50 $32.34 $28.34 $29.18 $30.03 $30.87 $28.02 $28.85 $29.70 $30.54 $27.89] $28.73 $29.56 $30.41 $27.62 $28.46 $29.30 $30.14 $33.34 $34.27 $35.21 $36.14 $33.24 $34.17 Marble Mason Marble Mason Millwright Millwright Millwright Millwright $37.20 $39.15 $39.21 $41.07 $43.00 $44.97 $42.57 $43.73 $44.89 $46.05 $44.82 $45.98 $47.14 $48.30 $42.29 $43.45 $44.61 $45.77 $44.54 $45.70 $46.86 $48.02 $39.57 $40.73 $41.88 $43.04 $38.42 $39.59 $40.74 $41.90 $37.97 $39.13 $40.30 $41.45 $37.10 $38.26 $39.42 $40.58 $51.63 $53.10 $54.56 $56.03 $51.28 $52.75 Operators (Building, Class 01- See Notes) Operators (Building, Class 01- See Notes). Operators (Building, Class 01 Seel Notes) Operators (Building, Class 01 See. Notes) Operators (Building, Class 01A- See Notes) Operators (Building, Class 01A- See Notes) Operators (Building, Class 01A- See Notes) Operators (Building, Class 01A- See Notes): Operators (Building, Class 02- See Notes) Operators (Building, Class 02- See Notes): Operators (Building, Class 02- See Notes) Operators (Building, Class 02- See Notes) Operators (Building, Class 02A- See Notes) Operators (Building, Class 02A- See Notes) Operators (Building, Class 02A- See Notes) Operators (Building, Class 02A- See Notes) Operators (Building, Class 03- See Notes) Operators (Building, Class 03- See Notes). Operators (Building, Class 03- Seel Notes) Operators (Building, Class 03- Sée Notes) Operators (Building, Class 04- See Notes) Operators (Building, Class 04- See Notes) Operators (Building, Class 04- See Notes) Operators (Building, Class 04- See Notes). Operators (Building, Class 05 See! Notes) Operators (Building, Class 05- See Notes) Operators (Building, Class 05- See Notes) Operators (Building, Class 05- See! Notes) Operators (Building, Class 06- See Notes) Operators (Building, Class 06- See! Notes) Operators (Building, Class 06- See Notes) Operators (Building, Class 06- See Notes) Operators (Building, Class 07A- See Notes) Operators (Building, Class 07A- See Notes): Operators (Building, Class 07A- Seel Notes) Operators (Building, Class 07A- See Notes) Operators (Building, Class 07B- Seel Notes) Operators (Building, Class 07B- See Notes) Commonwealth of Pennsylvania Report Date: 6/18/2024 BUREAU OF LABOR LAW COMPLIANCE PREVAILING WAGES PROJECT RATES Project: 24-05918- Building Operators (Building, Class 07B- Seel Notes) Operators (Building, Class 07B- See Notes) Painters Class 1 (see notes) Painters Class 2( (see notes) Painters Class 3 (see notes) Pile Driver Divers (Building, Heavy, Highway) Pile Driver Divers (Building, Heavy, Highway) Pile Driver Divers (Building, Heavy, Highway) Pile Driver Divers (Building, Heavy, Highway) Effective Expiration Hourly Rate Fringe Total $89.32 $91.72 $53.26 $57.16 $63.76 $79.92 $82.92 $85.54 $88.17 $60.35 $62.60 $64.60 $66.60 $52.16 $54.01 $71,08 $77.25 $50.75 $54.95 $53.75 $57.95 $64.86 $67.36 $54.89 $56.39 $72.37 $75.07 $55.04 $56.42 $55.79 $57.18 $57.51 $58.95 $48.40 $50.35 $52.30 $54.25 $52.54 $54.49 $56.44 $58.39 $37.72 $38.28 $36.68 Department ofLabor &1 Page4 4of8 Date 5/1/2025 5/1/2026 5/1/2023 5/1/2023 5/1/2023 1/1/2023 1/1/2024 1/1/2025 3 1/1/2026 1/1/2023 1/1/2024 1/1/2025 1/1/2026 5/1/2023 5/1/2024 5/1/2023 5/1/2023 5/1/2020; 5/1/2023 5/1/2020: 5/1/2023 5/1/2023 5/1/2024 7/15/2022 7/15/2023 4/1/2023 4/1/2024 5/1/2023: 5/1/2024 5/1/2023 5/1/2024 5/1/2023 5/1/2024 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2021 5/1/2021 5/1/2019 Date Benefits $35.10 $36.03 $23.28 $23.58 $23.58 $21.22 $21.97 $22.72 $23.47 $21.22 $21.97 $22.72 $23.47 $20.83 $21.08 $29.72 $34.62 $21.25 $22.10 $21.25 $22.10 $29,82 $31.23 $24.35 $24.63 $28.04 $28.62 $19.25 $20.76 $19.25 $20.76 $21.00 $22.51 $15.49 $16.99 $16.99 $16.99 $17.74 $19.24 $19.24 $19.24 $0.00 $0.00 $0.00 $54.22 $55,69 $29.98 $33.58 $40.18 $58.70 $60.95 $62.82 $64.70 $39.13 $40.63 $41.88 $43.13 $31.33 $32.93 $41.36 $42.63 $29.50 $32.85 $32.50 $35.85 $35.04 $36.13 $30.54 $31.76 $44.33 $46.45 $35.79 $35.66 $36.54 $36.42 $36.51 $36.44 $32.91 $33.36 $35.31 $37.26 $34.80 $35.25 $37.20 $39.15 $37.72 $38.28 $36.68 Piledrivers Piledrivers Piledrivers Piledrivers Plasterers Plasterers Plumber/Pipefiter Roofers (Composition) Roofers (Shingle): Roofers (Shingle) Roofers (Slate & Tile). Roofers (Slate & Tile) Sheet Metal Workers Sheet Metal Workers Sign Makers and Hangars Sign Makers and Hangars Sprinklerfitters Sprinklerfitters Terrazzo Finisher Terrazzo Finisher Terrazzo Grinder Terrazzo Grinder Terrazzol Mechanics Terrazzo Mechanics Tile & Marble Finisher Tile & Marble Finisher Tile & Marble Finisher Tile & Marble Finisher Tile Setter Tile Setter Tile Setter Tile Setter Truckdriver class 1(see notes) Truckdriver class 2( (see notes) Truckdriver class 3( (see notes) Commonwealth of! Pennsylvania Report Date: 6/18/2024 , Industry BUREAU OF LABOR LAW COMPLIANCE PREVAILING WAGES PROJECT RATES Project: 24-05918. - Building Effective Expiration Hourly Rate Fringe Total $36.60 Date 6/1/2019 Daté Benefits $12.08 Window Film /Tintl Installer $24.52 Commonwéalth of! ennsylvania Report] Date: 6/18/2024 Department Page 5of8 ofLabor Industry & BUREAU OF LABOR LAW COMPLIANCE PREVAILING WAGES PROJECT RATES Project: 240518-Heasy/lghway Effective Expiration Hourly Rate Fringe Total $54.41 $55.91 $57.36 $58.81 $55.16 $56.66 $58.11 $59.56 $55.16 $56.66 $58.11 $59.56 $48.88 $90.74] $93.69 $93.69 $65.14 $67.64 $43.80 $45.10 $50.42 $51.72 $47.41 $48.71 $47.76 $49,06 $48.43 $49.73 $47.85 $49.15 $48.14 $49.44 $48.62 $49.92 $64.84 $66.79 $68.79 $70.85 $69.96 $71.96 $73.96 $75.96 $72.87 Department ofLabor & Industry Page 6of8 Date 5/1/2023 5/1/2024 5/1/2025 5/1/2026 43 5/1/2023 5/1/2024 5/1/2025 5/1/2026 1/1/2023 1/1/2024 1/1/2025 1/1/2026 5/1/2016 8/29/2022. 840S3 9/4/2023 1/1/2024 7/1/2021 7/1/2023 5/1/2023 5/1/2024 5/1/2023 5/1/2024 5/1/2023 5/1/2024 88 5/1/2023 5/1/2024: 5/1/2023 5/1/2024 5/1/2023 5/1/2024 5/1/2023 5/1/2024 5/1/2023 5/1/2024 6/1/2023 6/1/2024 6/1/2025 6/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 Date Benefits $35.32 $19.09] $36.12 $19.79] $36.87 $20.49 $37.63 $21.18 $36.07 $19.09 $36.87 $19.79! $37.62 $20.49 $38.38 $21,18 $36.07 $19.09 $36.87 $19.79 $37.62 $20.49 $38.38 $21.18 $26.40 $22.48 $62.66 $28.08 $64.68 $29.01 $64.46 $29.23 $34.01 $31.13 $36.26 $31.38 $24.81 $18.99 $25.61 $19.49 $31.43 $18.99 $32.23 $19.49 $28.42 $18.99 $29.22 $19.49 $28.77 $18.99 $29.57 $19.49 $29.44 $18.99 $30.24 $19.49 $28.86 $18.99 $29.66 $19.49 $29.15 $18.99 $29.95 $19.49 $29.63 $18.99 $30.43 $19.49 $41.51 $23.33 $43.46 $23.33 $45.46 $23.33 $47,52 $23.33 $41.14 $28.82 $42.30 $29.66 $43.46 $30.50 $44.61 $31.35 $43.39 $29.48 Carpenter Carpenter Carpenter Carpenter. Carpenter Welder Carpenter Welder Carpenter Welder Carpenter Welder Carpenters - Piledriver/Welder Carpenters- - Piledriver/Welder Carpenters Piledriver/Welder Carpenters Piledriver/Welder Cement Finishers Electric Lineman Electric Lineman Electric Lineman Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing) Iron Workers (Bridge, Structural Steel, Omamental, Precast, Reinforcing) Laborers (Class 01 See notes) Laborers (Class 01- See notes): Laborers (Class 02- See notes) Laborers (Class 02- See notes). Laborers (Class 03- See notes) Laborers (Class 03- See notes): Laborers (Class 04- See notes) Laborers (Class 04- See notes) Laborers (Class 05- See notes) Laborers (Class 05- See notes). Laborers (Class 06- See notes) Laborers (Class 06- See notes): Laborers (Class 07- See notes) Laborers (Class 07- See notes) Laborers (Class 08- See notes) Laborers (Class 08- See notes) Millwright Millwright Millwright Millwright Operators (Heavy, Class 01- See Notes) Operators (Heavy, Class 01 See Notes) Operators (Heavy, Class 01 See Notes) Operators (Heavy, Class 01- See! Notes). Operators (Heavy, Class 01A- Seel Notes) Commonwealth of Pennsylvania Report Date: 6/18/2024 BUREAU OF LABOR LAW COMPLIANCE PREVAILING WAGES PROJECT RATES Project: 24-05918-H HeavylHighway Operators (Heavy; Class 01A- See Notes) Operators (Heavy, Class 01A- See Notes) Operators (Heavy, Class 01A- See Notes) Operators (Heavy, Class 02- See Notes) Operators (Heavy, Class 02- See Notes) Operators (Hèavy, Class 02- See Notes) Operators (Heavy, Class 02 See Notes) Operators (Heavy, Class 02A- See Notes) Operators (Heavy; Class 02A- See Notes) Operators (Heavy, Class 02A- See Notes) Operators (Heavy, Class 02A: See Notes) Operators (Heavy, Class 03- See Notes) Operators. (Heavy, Class 03- See! Notes) Operators (Heavy, Class 03- See Notes) Operators (Heavy, Class 03- See. Notes). Operators (Heavy, Class 04- See Notes) Operators (Heavy, Class 04- See Notes): Operators (Heavy, Class 04- See Notes) Operators (Heavy, Class 04- Seel Notes). Operators (Heavy, Class 05- See Notes) Operators (Heavy, Class 05- Seel Notes) Operators (Heavy, Class 05- Seel Notes) Operators (Heavy, Class 05- See Notes) Operators (Heavy, Class 06- Seel Notes) Operators (Heavy, Class 06- Seel Notes): Operators (Heavy, Class 06- Seel Notes) Operators (Heavy, Class 06- See Notes) Operators (Heavy, Class 07A- See Notes) Operators (Heavy, Class 07A- See Notes) Operators (Heavy, Class 07A- See Notes) Operators (Heavy, Class 07A- See! Notes) Operators (Heavy, Class 07B- - See Notes) Operators (Heavy, Class 07B- See Notes) Operators (Heavy, Class 07B- See Notes) Operators (Heavy, Class 07B- : See Notes) FMN 5/1/2026 Operators (Highway, Class 01- See Notes) Operators (Highway, Class 01 See Notes) Operators (Highway, Class 01 See Notes) Operators (Highway, Class 01- See Notes) Operators (Highway, Class 01a- See Notes) Operators (Highway, Class 01a See Notes) Operators (Highway, Class 01a See Notes) Operators (Highway, Class 01a- Seel Notes). Operators (Highway, Class 02- Seel Notes) Commonwealth of Pennsylvania Report] Date: 6/18/2024 Effective Expiration Hourly Rate Fringe Total $74.87 $76.87 $78.87 $69.59 $71.59 $73.59 $75.59 $72.51 $74.51 $76.51 $78.51 $65.81 $67.81 $69.81 $71.81 $64.34 $66.34 $68.34 $70.34 $63.76 $65.76 $67.76 $69.76 $62.62 $64.62 $66.62 $68.62 $82.76 $85.16 $87.56 $89.96 $82.31 $84.71 $87.11 $89.51 $68.80 $70.80 $72.80 $74.80 $71.73 $73.73 $75.73 $77.73 $67.28 Department ofI Labor &1 Page 7of8 Date 5/1/2024, A3 RE 5/1/2025 5/1/2026. 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/20241 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024: 5/1/2025 5/1/2026 5/1/2023 Date Benefits $30.32 $31.16 $32.01 $28.73 $29.57 $30.41 $31.25 $29.40 $30.24 $31.08 $31.92 $27.86 $28.70 $29.55 $30.38 $27.54 $28.38 $29.22 $30.06 $27.41 $28.25 $29.09 $29.93 $27.14 $27.98 $28.82 $29.66 $32.83 $33.77 $34.71 $35.64 $32.73 $33.67 $34.60 $35.54 $28.55 $29.39 $30.24 $31.08 $29.23 $30.07 $30.92 $31.76 $28.20 $44.55 $45.71 $46.86 $40.86 $42.02 $43.18 $44.34 $43.11 $44.27 $45.43 $46.59 $37.95 $39.11 $40.26 $41,43 $36.80 $37.96 $39.12 $40.28 $36.35 $37.51 $38.67 $39.83 $35.48 $36.641 $37.80 $38.96 $49.93 $51.39! $52.85 $54.32 $49.58 $51.04 $52.51 $53.97 $40.25 $41,41 $42.56 $43.72 $42.50 $43.66 $44.81 $45.97 $39.08 Industry BUREAU OF LABOR LAW COMPLIANCE PREVAILING WAGES PROJECT RATES Project: 24-05918- HeavylHighway Operators (Highway, Class 02- See Notes) Operators (Highway, Class 02- Seel Notes) Operators (Highway, Class 02- See Notes) Operators (Highway, Class 03- See Notes) Operators (Highway, Class 03- Seel Notes) Operators (Highway, Class 03- See Notes) Operators (Highway, Class 03- See Notes) Operators (Highway, Class 04- See Notes) Operators (Highway, Class 04- See Notes) Operators (Highway, Class 04 Seel Notes) Operators (Highway, Class 04- See Notes) Operators (Highway, Class 05- See Notes) Operators (Highway, Class 05- See! Notes) Operators (Highway, Class 05- See Notes) Operators (Highway, Class 05- See Notes) Operators (Highway, Class 06- See Notes) Operators (Highway, Class 06- See Notes) Operators (Highway, Class 06- See Notes) Operators (Highway, Class 06- See Notes) Operators (Highway, Class 06/A- Seel Notes) Operators (Highway, Class 06/A See Notes) Operators (Highway, Class 06/A- See Notes) Operators (Highway, Class 06/AH See. Notes) Operators (Highway, Class 07/A- See Notes) Operators (Highway, Class 07/A- Seel Notes) Operators (Highway, Class 07IA- See Notes) Operators (Highway, Class 07/A- See Notes). Operators (Highway, Class 07/B Seel Notes) Operators (Highway, Class 07/B - See Notes) Operators (Highway, Class 07/B. - See Notes) Operators (Highway, Class 07/B -S See Notes): Painters Line Stripping Painters Class 2 (see notes) Painters Class 3( (see notes) Pilel Driver Divers (Building, Heavy, Highway) Piledrivers Piledrivers Piledrivers Piledrivers Effective Expiration Hourly Rate Fringe Total $69.28 $71.28 $73.28 $66.38 $68.38 $70.38 $72.38 $65.80 $67.80 $69.80 $71.80 $65.14 $67.14 $69.14 $71.14 $69.10 $71.10 $73.10 $75.10 $72.01 $74.01 $76.01 $78.01 $81.37 $83.77 $86.17 $88.57 $79.54 $81.94 $84.34 $86.74 $69.53 $52.24 $58.34 $76.90 $54.41 $55.91 $57.36 $58.81 $88.71 $37.72 $37.79 $36.68 Department ofI Page 8of8 Labor &I Industry Date 5/1/2024: 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026. 5/1/2023 5/1/2024 5/1/2025 5/1/2026: 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 5/1/2023 5/1/2024 5/1/2025 5/1/2026 12/1/2023 5/1/2020. 5/1/2020 1/1/2022. 5/1/2023 5/1/2024: 5/1/2025 5/1/2026 5/1/2021 aal 5/1/2021 5/1/2019: Date Benefits $40.24 $29.04 $41.39 $29.89 $42.55 $30.73 $38.39 $27.99 $39,55 $28,83 $40.70 $29.68 $41.87 $30.51 $37.94 $27.86 $39.10 $28.70 $40.26 $29.54 $41.41 $30.39 $37.42 $27.72 $38.58 $28.56 $39.73 $29.41 $40.89 $30.25 $40.48 $28.62 $41,64 $29,46 $42.80 $30.30 $43.95 $31,15 $42.73 $29.28 $43.89 $30.12 $45.05 $30.96 $46.21 $31.80 $48.86 $32.51 $50,32 $33.45 $51.79 $34.38 $53.25 $35.32 $47.44 $32.10 $48.91 $33.03 $50.37 $33.97 $51.84 $34.90 $42.10 $27.43 $31.53 $20.71 $37.63 $20.71 $56,40 $20.50 $35.32 $19.09 $36,12 $19.79 $36.87 $20.49 $37.63 $21.18 $48.43 $40.28 $37.72 $0.00 $37.79 $0.00 $36.68 $0.00 Steamfitters (Heavy and Highway- Gas Distribution) 5/1/2022 Truckdriver class 1(see notes) Truckdriver class 2 (seer notes) Truckdriver class 3 (seer notes) Commonwealth of Pennsylvania Report) Date: 6/18/2024