oU Baker Cowity PublioSchook Sherrie Raulerson, Superintendent of Schools CH 270 South Boulevard East, Macclenny, Florida 32063 Telephone: (904)259-6251 www.bakerki2.org Fax: (904)259-1387 "The vision oft the Baker County School. Board is toj prepare individuals to be lifelong learners, self-sufficient and responsible citizens ofg good character." " AGENDA SCHOOL BOARD WORK SESSION (Open to thel Public) Thursday, February 25, 2021. - 1:00 p.m. SUPPLEMENTALMINUTE BOOK #491 PAGE: #14 District School Board Room (270 South Boulevard Bast, Macclenny, Florida) 1:00 p.m. Work Session on the New Kindergarten-1 Fifth Grade Elementary School. AGENDA SCHOOL BOARD MIDDIING (Open to thel Public) Approximately 1:45 p.m. Thursday, February 25, 2021 - Immediately Following the Conclusion of thel Prior Work Session District School Board Room (270 South Boulevard East, Macclenny, Florida) SUPPLEMENTAL MINUTE BOOK #491 PAGE #14 .. A. Invocation B. Pledge of Allegiance II. CALL' TOORDER -1 1:45 P.M. mI. ROLL CALL OF MEMBERS IV. PUBLIC HEARINGS - 1:45P.M. (ifany) V. RECOGNITIONS/PRESENTATIONS VII. REMOVAL OF ROUTINEI ITEMS VIII. APPROVAL OF ITEMS FOR ACTION VI. APPROVALTO CORRECT AND/OR ADD ITEMS TOTHE FINAL. AGENDA A. Approval of Items CONTACT Baker County School Board Meeting Agenda (Thursday, February 25, 2021) - Page 1 of2 "Preparing individuals tol be! lifelong learners, self-sufficient, andr responsible citizèns of good character" Minute Book #3 39 Supplemental Minute Book #491 Page #14 DISTRICT SCHDDL BIARD MEMBERS Tiffany Mclnarnay, Districtl * Richard Deant Griffis, District2 * Paulal.B Barton, District3 de Charlie M. Burnett, IILD District4 & Amanda Hadges. District5 ANEQUALACCES/EQUALOPPORIUNTYINSTTUTION SM-A, 1.Approval of AIA Document A133-2019 Exhibit A Guaranteed Sherrie Raulerson Maximum Price. Amendment for thel New Baker County Elementary School in the Amount ofs25,227,413.00 with Perry- McCall Construction, Inc. (GMP Book Dated 02/23/2021 Included) (259-0401) IX. CITIZEN INPUT (A Citizen. Input form must be completed and: submitted to the Board Secretary PRIOR to the beginning of the meeting f you wish to address the Board. You will be called on by the Chairman at the appropriate time. Presenlatonscomments are limited to ten (10), minutes.) X. INFORMATION AND ANNOUNCEMENIS XI. ADJOURN NOTICE Any person who desires to appeal any decision made by the School. Board with respect, to any matter considered at the above mentioned meeting will need a record of the proceedings, and for such purpose may need to ensure that a1 verbatim record of the proceedings is made, which record includes the testimony and evidence upon which an appeal may be based. PERSONNEL ITEMS LIST FOR APPROVALON: FEBRUARY 25,2021 N/A Baker County School Board Meeting Agenda (Thursday, February 25, 2021) Page 2 of2 Minute Book #3 39 Supplemental Minute Book #491 Page #14 - AIA Document A133 - 2019 Exhibit A Guaranteed Maximum Price Amendment This Amendment dated the 23rd day of February int the year 2021, is incorporatedi into the accompanying AIA Document. A133TML-2019, Standard. Form of Agreement. Between Owner and Construction Manager as Constructor where thel basis of! payment is the Cost ofthe Work] Plus al Fees with a Guaranteed. Maximum Price dated the 8th day of ADDITIONS ANDI DELETIONS: The author ofthis document has addedi Information needed1 for its completion. The author may also have revised the text oft the original AIA: standard form. An Additions and Deletions Reportt that notes added Information as well asr revisions to the standardi form texti is avallable from the author and should be reviewed. A verticali linei in thel left margin oft this document indicates where the author has added necessary information: and where the author has added to or deleted from the original AIAt text. This document has important legal consequences. Consultation" with an attorney is encouraged with respect toi its completion or modification. AIAI Document, A201/M-2017, General Conditions oft the Contract for Construction, is adoptedi int this document by reference. Dor not use with other general conditions unless this document is modified. September in the, year 2020 (the "Agreement") (nwords, indicate day, month, andy year.) for, the following PROJECT: (Name and address or location) 19042- New) Baker County Elementary Macclenny, Florida 32063. THE OWNER: (Name,; legal status, and. address) The Schoo! Board of] Baker County, Florida 392 South Blyd. East" Macclenny,. Florida 32063 THE CONSTRUCTION: MANAGER: (Namé, legal status, and address) Perry-McCall Construction, Inc. 6104: S., Gazebo Park Place. Jacksonville; Florida 32257 TABLEOFA ARTICLES A.1 GUARANTEED MAXIMUM PRICE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED A.4 CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, ANDS SUPPLIERS ARTICLEA1 GUARANTEED MAXIMUM PRICE SA.1.1 Guaranteed Maximum Price Pursuant to Section 3.2.6 oft the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. As agreed by the Owner and Construction Manager, the Guaranteed Maximum! Pricei is an amount that the Contract Sum shall not exceed. The Contract Sum consists oft the Construction Manager's Feej plus the Cost ofthe Work, as that term is defined in Article 6oft the. Agreement. SA.1.1.1The Contract Sum is guaranteed by the Construction Manager: not to exceed Twenty-Five. Million, Two. Hundred' Twenty-Seven Thousand, Four Hundred" Thirteen Init. AIAI Document A133"-: 20191 Exhibit A. Copyright 01 1991, 2003, 2009, and2 2019byl The American Institute ofA Architects. Allr rights reserved. The" American Institute ofA Archilects," "AIA," the AIALogo, and" "AIA Contract Documents" arer registered trademarks and may notb be ysed withoutp permission. This document was produced byA AIAs software at 15:20:30 ETC on 02/23/2021 under Order No.1 1252973707 which expires on1 11/30/2021,isr notf forr resale, isli licensedf ford one-lime 1 I use only, andr may only be usedi ina accordance witht the AIA Contracti Documentse Terms ofs Service. Tor report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA3E) Dollars ($:25,227,413.00 ), subject to additions and deductions by Change Order as] provided in the Contract SA1.1.21 Itemized Statement of the Guaranteed Maximum Price. Provided belowi is ani itemized statement of the Guaranteed Maximum Price organized by trade categories, including allowances; the Construction Manager's contingency; alternates; the Construction Manager's Fee; and other items that comprise the Guaranteed Maximum Documents. Price as defined in Section 3.2.1 oft the Agreement. (Provide itemized. statement below or reference an attachment.) See Exhibit One GMP, Book dated 2/23/21 SA.1.1.3 The Construction, Manager'sl Feei iss set forthi in Section 6.1.2 oft the Agreement. SA.1.1.4 The method of adjustment oft the Construction Manager's Fee for changes int the Work is set forth in Section 6.1:3 ofthe Agreément. SA.1.5A Alternates Item 2/23/21 SA1151-Altemates; ifany, included int the Guaranteed Maximum Price: Price See Exhibit One GMP Book dated SA.1.1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following exeçution ofthis Exhibit A: Upon acceptance, the Owner shalli issue a Modification tot the Agreement. (Insèrt below each alternaté and the conditions that must be met for the Owner to accept the alternate.) Item Price Conditions for Acceptance See Exhibit Onez GMP Book dated 2/23/21 $A.1.1.6Unit priçes, ifany: Item: (Identify thei item ands state the unit price and quantity limitations, ifany, to which the unit price will be applicable.) Units andl Limitations Price per Unit ($0.00) See Exhibit One GMP Book dated 2/23/21 ARTICLEA.2. DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION SA.2.1The date of commencement of the Work shall be: (Check one ofthej following boxes.) [1 The date of exeçution oft this Amendment. [X1 Established: as follows: March 8, 2021 execution oft this Amendment. (Inserta date or a means to determine the date of commencement of the Work.) Ifac date of commencement oft the' Work isi not selected, then the date of commencement shalll be the date of SA.2.2Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allottedi in the Contract. Documents for Substantial Completion oft the Work. The Contract Time shall be measured SA.2.3.1 Subject to adjustments oft the Contract' Time as provided in the Contract Documents, the Construction Init. AIAI Document A133"-20191 Exhibit A. Copyrighi 01 1991, 2003, 2009, and: 20191 by The American Institute ofA Architects.. Allr rights reserved. The" "American Institute ofA Architects," "AIA,"t the AIAL Logo, and" "AIA Contract Documents" arer registeredt trademarks andi may not be used without permission. This document was produced by AIAS software at1 15:20:30E ET ond 02/23/2021 under Order No.1 12529737071 whiche expires on1 11/30/2021, isr notf forr resale, isli licensed1 for one-time 2 I use only, andr may only beu usedi ina accordance with theA AIA Contract Documentse Terms of Service. Tor report copyright violations, e-mail copyrighi@aia.org. fromi the date of commencement of the Work. SA.2.3Substantial Completion Manager shall achieve Substantial Completion oft the entire Work: User Notes: (3B9ADA3E) (Check one ofthej following boxes and complete the necessary information.) L Not later than ( )calendar days from the date of commencement ofthe Work. [XJ By the following date: June 16, 2022 SA.2.3.2 Subject to adjustments oft the Contract Time as provided int the Contract Documents, ifportions of the Work aret to be completed prior to Substantial Completion ofthe entire Work, the Construction Manager shall achieve Substantial Completion ofs such portions by the following dates: Portion ofl Work: Substantial Completion Date SA.233fft the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages, ifany, shall be assessed as set forthi in Section 6.1.6 oft the Agreement. SA,3.1The Guaranteed: Maximum Price and Contract' Time set forthi in this Amendment are based on the Contract ARTICLE A.3/ INFORMATION UPONI WHICH AMENDMENT IS BASED Documents and the following SA.3.1.1 The following Supplementary and other Conditions of the Contract: Document Seel Exhibit One. GMP Book dated 2/23/21 SA.3.1.2The following Specifications: See Exhibit One GMP:Book dated 2/23/21 Title Date Pages (Either: list the Specifications here, or refer to an exhibit attached to this Amendment.) Section Title Date Pages $A:3.1.3 The. following Drawings: See Exhibit One GMP: Book dated 2/23/21 (Either list the Drawings here, or7 refer to an exhibit attached to this Amendment.) Number Title Date SA.3.1.4The Sustainability Plan, ifany: (fthe Owner identifiedas Sustainable Objective in the Owner's Criteria, identif the document or documents that comprise the Sustainability Plan by title, date and number of pages, and include other identifying information. The Sustainability Plan identifies and describes the Sustainable Objective; thet targeted. Sustainable Measures; implementation strategies selected to achieve the, Sustainable Measures; the Owner's and Construction Manager's voles and responsibilities associated with achieving the Sustainable. Measures; the specific details about design reviews, testing or metrics to verify achievement ofe each. Sustainable Measure; and the Sustainability Documentation rèquired for thel Project, as those terms are defined ini Exhibit Ct to the Agreement.) Title Date Pages Otheri identifyingi information: Init. AIAI Document A133" - 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and: 20195 by" The American Institute of Architects.. Allr rights reserved. The' "American Institute ofA Architects," "AIA," the AIAL Logo, and" "AIA Contract Documents" are registeredt trademarks: andr mayr noti beu used withoutp permission. This document 3 was produced by AIAs software at1 15:20:30 ET on 02/23/2021 under Order No.1 12529737071 which expires on1 11/30/2021, Isr noti forr resale, isl licensed for one-time I use only, and may only be usedi ina accordanco witht theA AIAC Contract Documentse Terms of Service. Tor report copyright violations, e-mail copyrightcaia.org User Notes: (3B9ADA3E) SA.3.1.5. Allowances, if any, included: in the Guaranteed Maximum Price: (Identify each allowance.) Item 2/23/21 Price Seel Exhibit One- GMP Book dated $A.3.1.6 Assumptions and clarifications, ifa any, upon which the Guaranteed. Maximum Pricei isl based: (Identify each assumption and clarification.) See Exhibit'One - GMP] Book dated 2/23/21 SA.3.1.7 The Guaranteed Maximum Pricei is based upon the: following other documents andi information: (List any other dociments'o or information. here, or refer to an exhibit altached to this Amendment.) See Exhibit One GMP Book dated 2/23/21 ARTICLEA.4 CONSTRUCTION, MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, ,AND SA.4.1 The Construction: Manager shall retain the consultants, contractors, design professionals, and suppliers, SUPPLIERS identified below: (List) name, discipline, address, and otheri information.) Seel Exhibit One GMP Book dated 2/23/21 This Amendment to the Agreement entered into as oft the day and year OWNER (Signature). Bakèr County, Florida (Printed name and title) OWNER (Signature) Sherrie Raulerson, Superintendent ofThe School Board ofl Baker County, Florida (Printed name and title) (Signature) Paula T. Barton, Chairman of The School Board of - Carson) McCall Vicel President zt (Printed name and title) AIAI Document A133"- 2019 Exhibit A. Copyright 01 1991, 2003, 2009, and 2019by Thel American Institute of/ Architects. All rights reserved." The" "American Init. Institute ofA Architects," "AIA," theA AIAI Logo, and" "AIA Contract Documents" arer registered trademarks andi mayr not be used withoutp permission. This document 4 Was produced! by AIAs software at1 15:20:30 ETo on 02/23/2021 under Order No.1 1252973707 which expires on1 11/30/2021, isr notf forr resale, Isli licensed ford one-time use anly, andr may only be usedi ina accordances with the AIAC Contract Documentse" Terms of Service. Toreport copyright violations, e-mail copyrighi@aia.org. I User Notes: (3B9ADA3E) Exhibit 1- GMP Book dated 2/23/21 Baker Gounty Elementary Guaranteed Maximum-Price Febuary23,202 BAKERONNRAKENFAEA n 904.292:2645 pEMNV-madixcom 0O Pery 6104south gazebo park place I jacksonville, florida 32257 cgc017574 Exhibit1 1-GMPI Book dated 2/23/21 February 23, 2021 m Perry-McCall CONSTRUCTIONING JACKSONVILLE CONSTRUCTION. DAYTONA MANAGEMENT BEACH GENERAL DESION/BUILD CONTRACTING The School Board of Baker County, Florida Ms. Sherrie Raulerson, Superintendent 392 South Blvd. Macclenny, Florida 32063 Re: Guaranteed Maximum Price 19042 New Baker County Elementary School Dear Ms. Raulerson, Perry-McCall Construction, Inc. is pleased to present this Guaranteed Maximum Price ("GMP)proposal for Twenty-Five Million, Two Hundred Twenty-Seven Thousand, Four Hundred Thirteen Dollars the above referenced project in the amount of: ($25,227,413.00) This proposal is based on the 100% construction documents prepared by Clemons Rutherford & Associates dated December 16, 2020, and is further defined by the qualifications and clarifications contained herein, Please make note of thel Phasing Plan in Attachment, A fori visual clarity oft the scope of work included in our GMP. The project was publidyadvertised. and sealed competitive bids were received on. January 21, 2021. Those bids have been reviewed for completeness and adherence to the construction documents. Where decided, those recommended trade contractor awards are identified ini the estimate. A complete copy of all bids received and thet tabulation of same willl be proved under a separate cover. Please find thet following documents attached for your review: GMP Estimate Document Log Drawing Review Project Schedule GMP Assumptions and Qualifications GMP Value Alternative Detailed Descriptions Approval of this proposal is time critical. Material inflation is increasing at an alarming rate and we need to lock in pricing ASAP. We anticipate this GMP will be presented for board approval on February 25, and we will be ready to mobilize immediately thereafter. We look forward to the successful completion of this important project. Inc. A Exhibit1- - GMP Book dated 2/23/21 n Perry-McCall CONSIRUCTION/INC: GMPTABLEOFC CONTENTS Estimate Summary, Base! Scope. page 04 page 06 page08 page 10 page 17 page22 page23 page37 page45 Estimate Summary, Base Scope w/ Value Alternates. General Conditions Detail (based on Alternate #4). Estimate Assumptions and Qualifications. Value. Alternates Detailed Descriptions Phasing Plan DocumentLog. Drawing Review. Project Schedule. 3 Exhibit1-GMP Book dated 2/23/21 BAKER COUNTY SCHOOL BOARD MACCLENNY "C" ELEMENTARY SCHOOL 2/23/2021 Perry-MeCall m ONSIRUCTON.INC: base scope estimate summary scope pckg 100000 Descriptions TotalAmounts base project scope as desigened 014529/MATERIALSTESTING 019I0OCOMMISIONING SERVICES 030000CONCRETE 040000/MASONRY 051200 MISC. & STRUCTURAL STEEL 054400LIGHT GAGE TRUSSES AND ROOF DECK OGIOOPOUGHCARPENTAY 064000/PLAM CABINETS, PILASTERS & WALL TREATMENTS 072100,BUILDING INSULATION-: SPRAY APPLIED INSULATION 07413PREFORMED WALL ANDI ROOF PANELS 019200WATERPAOOFNG AND SEALANTS 081000 DOORS, FRAMES & HARDWARE (FURNISH & INSTALL) 083333 OVERHEAD DOORS 084000 GLASS, ENTRANCES & STOREFRONTS, AND WINDOWS 092900 GYPSUM DRYWALL & FRAMING 095100 ACOUSTICAL CEILINGS & WALL PANELS 33,000 24,450 1,645,000 3,459,613 1,117,702 1,273,966 69,484 243,372 48,548 1,929,000 53,642 617,650 6,390 335,250 998,212 299,897 664,489 246,599 329,339 90,946 147,262 11,740 605,615 16,054 277,930 1,242,000 2,750,538 3,350,296 5,003,973 13,420 118,226 225,830 27,249,433 096000FLOORING 099100PAINTING TOOSPECALITYTRAD5S 101440/SIGNAGE 105310,ALUMINUM WALKWAYCANOPYSYSTEM 109900,WINDOW: BLINDS 114000FOODS SERVICE EQUIPMENT 116143STAGE CURTAINS 210000FIRE: SPRINKLER 220000PLUMBING 3000/MVACACONTROIS 260000ELECTRICAL &LOWVOLTAGE: SYSTEMS 310000SITEWORK. &UTILITIES 313116,TERMITE CONTROL 320293,SODDING, SEEDING, AND MULCHING 323100FENCES & GATES 100000 base project scope as desigened Baker County Elementary School v04. - 2021-02-23 4 Exhibit1-GMP Book dated 2/23/21 BAKER COUNTY SCHOOL BOARD MACCLENNY "C" ELEMENTARY SCHOOL 2/23/2021 jm Perry-MeCall NSIRLCTNINC base scope estimate summary Totals Amount Description Totals 27,249,433 27,590,051 Rate sub default insurance, cost of work bldrs risk commercial general liability p&pbond subtotal preconstruction subtotal 340,618 340,618 103,714 291,690 168,650 564,054 81,025 1,546,957 1,627,982 893,463 893,463 1,380,400 1.2509 % 28,154,105 general conditions (base scope) 29,782,087 construction contingency design contingency owner contingency subtotal p&o escalation building permit special fees, assessments subtotal Total 3.0009 % 30,675,550 4.5009 % 1,380,400 32,055,950 32,055,950 Baker County Elementary School v04- - 2021-02-23 5 Exhibit 1-GMP Book dated 2/23/21 BAKER COUNTY SCHOOL BOARD MACCLENNY "C" ELEMENTARY SCHOOL estimate summary with allocated markups 2/23/2021 im Perry-MoCall CONSIRUCTKINC scope 100000 300000 va Description TotalAmount 32,055,950 1,910,446 (7,616,480) (5,706,035) (10,491) (8,967) (5,399) (12,453) (3,652) (4,250) (3,772) (504) (3,173) (5,044) (1,681) (560) (22,417) (16,813) (99,176) (136,519) (57,163) (56,042) (47,527) (86,529) (27,529) base project scope as desigened potential alternates alt001 ALTERNATE #1: Additive cost for Classroom Wing 700 alt004 ALTERNATE #4: Reduced Scope - Removing' Wings 300, 500, &600 potential value analysis if Alternate #1 is accepted VE03.1 Masonry Bond Beams in lieu of Concrete Tie Beams at Exterior VE05.1 Light Gauge Guard Ralls in lieu of Angled Guard Ralls at VE05.2 12 Gauge Bent Metal in lieu of 1/4" Bent Plat at Eaves, Gable Ends, VE07.1 2" Double Lock Peterson Roof Panels in lieu of Specified VE09.1 Tarkett IDI Latitudes LVT in lieu ofTarkett Contour LVT VEO 09.2 Tarkett Resonate Carpet in lleu ofTarkett Blocade Carpet VE09.3 Delete the inside and outside Vinyl Base Corners VE09.4 Resinous Floorinfi inl lie ofTile Flooring at Restrooms VE22.1 Utilize CPVC inl lieu of Copper Piping VE 22.2 Alternate Plumbing Fixture Package VE22.3 Alternate Ball Valves VE23.1 HVAC & Controls' Value Engineering VE26.1 Electrical & Low' Voltage Value Enigineering 300000 potential alternates 320000 Walls Mezzanines and Expansion Joints VE 09.0 Type-XG GWB in lieu of Abusive GWB 320000 potential value analysis if Alternate #1 is accepted potential value analysis if Alternate #4 is accepted 330000 VE01.1 Reimbersable GC's Not Required VE03.1 Masonry Bond Beams in lieu of Concrete' Tie Beams at Exterior VE05.1 Light Gauge Guard Rails in lieu of Angled Guard Rails at VE05.2 12 Gauge Bent Metal in lieu of 1/4" Bent Plat at Eaves, Gable Ends, VE07.1 2" Double Lock Peterson Roof Panels in lieu of Specified Walls Mezzanines and Expansion. Joints VE09.0 Type-XGWB in lieu of Abusive GWB Baker County Elementary School v04- --2021-02-23 6 Exhibit1-G GMP Book dated 2/23/21 BAKER COUNTY SCHOOL BOARD MACCLENNY "C" ELEMENTARY SCHOOL estimate summary with allocated markups 2/23/2021 jm Perry.MeCal OASIRLCTONNE. scope Description TotalAmount VE09.1 Tarkett ID Latitudes LVTI In lieu ofTarkett Contour LVT VE09.2 Tarkett Resonate Carpet inl lieu of Tarkett Blocade Carpet VE09.3 Delete the inside and outside Vinyl Base Corners VE09.4 Resinous Floorinf in lie of Tile Flooring at Restrooms VE09.5 Resinous Flooring in lleiu of Quary Tile at Kitchen VE11.1 Allow Alternate Manufacturers for the Kitchen Equipment VE22.1 Utilize CPVCI in lieu of Copper Piping VE22.2 Alternate Plumbing Fixture Package VE22.3 Alternate Ball Valves VE23.1 HVAC8 & Controls' Value Engineering VE26.1 Electrical & Low' Voltage Value Enigineering VE31.1 HDP Storm Water Piping inl lieu of RCP VE 32.1 Grass Seeding in lieu of Sodding (22,623) (13,346) (1,345) (14,769) (25,336) (16,813) (44,834) (10,704) (5,324) (7,846) (134,502) (162,523) (38,201) (64,121) (49,730) (1,023,327) VE22.4 LP Gas' Tanks providedI by Owner's Vendor in lieu of Contractor VE32.2 Reduce/Redesign Fencing Around Retention Ponds 330000 potential value analysis if Alternate #4 is accepted eliminated value analysis from base project scope 400000 410000 eliminated alternates Estimate Totals Amount Description Totals. 25,227,413 Raté - Total GMP Baker County Elementary School v04- - 2021-02-23 7 Exhibit1-G GMP Book dated 2/23/21 m Perry-McCal ONSTRUCTION,NC, sjmonthis 65.18 wks Labor Mat Macclenny' "C" School, Baker Comty Date: January? 21,2021 CODE DESCE RIPTION Staff- Project Duration 1-012 Superintendent 1-013 Asst., Supt. () 1-013 Asst. Supt. (2) 1-026 Project Executive 1-010 Sc. Projeat Manager 1-011 Asst, PM Administrative Assistant- Office ODP help MEPFP Coordinator 1-016 Generall Labor- Cleanup #I 1-016 Generall Labor- Cleanup #2 1-017 Living Expense Staff- Closeout/ /Pmch 1-013 Assistant Superintendent 1-011 Assistant Project Manager 1-016 BIMC Coordinator- Consultant 1-016 GeneralLabor Travel Expenses 1-015 Superintendent Truck- -Company Owned 500 mo 1-515 Superintendent Gas 1-015 Asst. Supt. Truck- Allowance 1-515 Asst. Superintondent Gas 1-014 Project Executive's' Travel Expense 1-014 Project Manager Truck- Allowance 1-515 Project Manager Gas 1-515 Asst, Project Manager Gas 1-516 job! Related" Travel Expense Field Engincering 1-021 Layout/E Engineers supplies 1-024 Survey Safety/ /First Aid 1-019 Safety Consultant Visits 1-020 AED- Automated External Defibrillator 3100 Is 1-513 First Aids supplies 1-594 Safety Equipment 1-594 Hardhatsf forJ Jobsites Staff, AE, Owner 3000 ea Submittals 1-304 Overall Project Construction Schedule mo 1-304 Progress Schedules and Reports 1-301 Shop Drawings, Product Datad & Samples 1-305 Constructionl Photographs 1-305 Digital Camera Temporary Utilities 1-504 Temporary clectricily setup 1-505 Temporary electricity n monthly 1-505 Temporary clectricity generator 1-501 Temporary' Telephone- installation 1-502 Temporary" Telephone- monthly 1-509 Temporary Wator- setup 1-510 Temporary Water- monthly 1-503 Temporaty Toilets (6lea) 1-508 Temporary Heat Temporary Gas 1-586 Permenant Power 1-507 Barly HVACs start-up 915445 TOTAL Inclndes 277,530 157,325 277,534 109,330 8,120 121,800 57,536. 57.536, 8,991, 8.025 7:223 $.025. 7,223 $,025 7.223 7.223 1,605 10,000 7.500) 1,500 401, 2,140 145 QTY UNIT Unit LABOR Unit MATERIALS: SUB Cost NoBurden Cost NuTaN BID Emadants-Ta 65.00 wks 2,900 191,400 62,003 wks 1,750 108,500 wks 1,750 wks 3,300 66,00 wks 2,900 191,400 62,00 wks 1,450 75,400. 1:00 wks 800 5,600 wks 2,200 4262.00 wks 640 39,680 662,00 wks 640 39,686 15:00 400 wks 1,550 6,200 wks wks wks 500 mo AS09 mo 444500 mo 9 mo 13.09 mo 1500 mo 1500 mo A mo MAASDS mo 51007 Is 5,00 mo 5.00 mo 00 Is Administrative Assistant- Reimbursable GC's 70,00 wks 1,200 84,000 500 7,500 450 6,750 500 7,500 450 6,750 200 500 7,500 450 6,750 450 6,750 200 100 1,500 10,000 500 1,500 25 375 2,000 2,000 45 1,350 25 50 2,500 125 1,875 250 2,000 2,000 750 11,250 1,500 6,000 150 250 500 500 12,500 400 125 11,250 500 500 #H 50,000 mo Is 1500 mo Is 001 Is 15094 mo 001 Is mo 1F00 Is mo 4 90:00, mo 1004 mo ls 2.130 12.038 6,420 13.035 12.035 53,500. 9,255 Perry-McCallC Construction, Inc. printed: 2/23/2021 8 Exhibit 1- GMP Book dated 2/23/21 Perry-McCall ONSTRUCTION,NO E0months 65,18 wks Labor Mat 85 1.275. 20 500 2,500 2,500 500 4,800 25 1,650 500 500 500 100 800 800 100 1.500 1,250 1,250 100 100 120 100 1,200 120 90 1,080 1,000 250 3,750 3,000 2,000 3,500 500 7,500 200 3,100 2,000 450 58,950 600 9,000 2,500 2,500 250 3,750 100 1,500 50 50 750 1,500 1.500 500 1,00 800 800 2,500 2,500 120 8,400 1,000 2,000 65 3.770 1,000 1,000 100 1,400 90 180 2,000 2,500 500 1,000 1,000 38.868 2,082 744,200 308,856. Macclenny' "C" School, Baker County Date: January 21,2021 CODE 244 TOTAL Includes f364 2,675. 2.500 5,136 1.760.; 500 535: L00T 1,605 1,33S: 1458 1330. 4.013 2,140 3:500. 8,025 3210 63:077 9:630 5.000 2,500 .013 1,605 803 1,605 1070 $56 2.075 8,988 2,140 4:034 1,090. 1.498 [93 2,000 2,500 3,400 1,070 41,589 2.228 1,460,066 DESCRIPTION Temporary Consiruetion 1-591 Employee) Background Checks 1-591 Employee Badges 1-303 Drawing Reproduction (construction) 1-520 Topping Out Party 1-591 Protected Pedestrian Walkways 1-580 Construction Area Fence 1-580 Temporary Fence Maintenance (-581 Temporary Site Barriers 1-581 Temporary Signage 1-592 Project Identification/ /Signs 1-522 Ice Water & Cups 1-305 Construction Photographs- Drone 1-305 Construction Photographs- Webcam 1-521 Radio Communication- Jobsite! Radios 1-522 Fire Extinguishers 1-523 Fire Extinguisher Stands 1-581 Light Dewatering 1-524 Small Tools 1-524 Small Tools- Tool) Box 1-582 Construction Entrances 1-634 Miscellaneous) Equipment! Rental 1-634 Miscellaneous! Equipment! Rental -F Fuel 1-583 Tree Protection 1-526 Trash Hauling &I Dumpl Fees Field Oflice 1-560 Ofice Trailer (12x60) 1-561 Selup/Takedown' Trailers 1-561 Oftice Sleps/Deck 1-562 Temporaty) Holding Tank (officet trailer toilet) 1-563 Temporary Blectric forJ Jobsite Offico I-563 Temporary Waterf for] Jobsite Office 1-511 Jobsite Oflices supplies 1-512 Express Mail 1-601 Jobsite Office Furniture- -Per Office 1-601 Jobsite Oflice Furniture- Conference Room 1-601 Computers, Printer &S Software 1-602 PMS Sofware- BIM360 1-601 Tablet 1-601 Cell Phones 1-602 Copy Machine 1-576 Storage Trailer- 8'x40' 1-561 Delivery/Pickup Facility Stari-up & Contract Closeout 1-529 As-Built Drawings 1-531 Warranties & Closeout) Documents 1-530 Punchlist 1-530 Punchlist Cart 1-528 Final Cleaning- Building SF 1-528 Tinal Cleaning- -Glass SP T'oinl QTY UNIT Unit LABOR Unit MATERIALS SUB Cost NuBurden Cost NuTa BID HurkeatsATax If wks 100 mo Is mo mo ea 10 12,00 ea 10 mo 1500 mo A Is 100 Is 500 mo Is 1300./pulls, 00 mo - mo mo Is ea is 79,003 wks Is 58001 mo RAE100 Is 409L mo 200. ea 74003 Is 09 Is AL0O Is 2,000 2,000 001 Is 92,544.00 sf 14882.004 sf Perry-McCall Construction, Inc. printed: 2/23/2021 9 Exhibit1- GMP Book dated 2/23/21 n Perry-McCall CONSIRUCTON,INC: GMP ASSUMPTIONS ANDI EXCLUSIONS This Guaranteed Maximum Price ("GMP") includes the first phase of constructing a new elementary school. The first phase will include areas 800 (cafetorium), 100 administration), 200 (media), partially 300 (central corridor), 700 (aka Alternate #1" classrooms), and 400 (classrooms and covered play). The cost: for all associated earthwork, site utilities, and site improvements is included in this estimate. This GMP does not include buildings 500 (classrooms) and 600 (classrooms), hereinafter referred to as "Phase 2." Phase 2 is expected to be added to this scope of work via change order, contingent upon the Owner obtaining additional funding. The cost associated with Phase 2 (today) has an estimated value of $32.5M. However, the Construction Manager cannot guarantee the cost associated with Phase 2 will Fora visual representation oft the scope ofwork included in this GMP, see Campus Plan Phasing This estimate is based on the Construction Documents prepared by Clemons, Rutherford and Associates Inc. dated December 16, 2020, addenda 1-2, preconstruction RFI responses, the Geotechnical Engineering Study Report prepared by Meskel Engineering & Consulting, Inc. dated March 11, 2020 and the Addendum Report dated January 27, 2021 and the qualifications below. This GMP Proposal is valid until February 26, 2021. After February 26, 2021, there will be price remain as they are at the date oft this GMP due to inflation. drawing dated 2/22/21 ("Attachment A"). increases. The increases are not quantifiable at this time. Division 01 - General Conditions 1. Phase 1: The estimate assumes an overall construction duration of 15 months and one week to project completion, with an anticipated start date of March 8, 2021. Anticipated construction 2. Phase 2: Ifnotified prior to. June 15, 2021 (and assuming materials are available to not interrupt construction flow), the anticipated completion date for Phase 1 and Phase 2 would be July 29, 2022. 3. Construction will be accomplished during normal working hours which will include various 4. AC Construction Manager's Contingency of 3%i is included to cover unforeseen conditions, minor discrepancies in the construction documents, and unexpected events in the construction process and completion is June 16, 2022. activities causing loud noises. 10 The School Board ofBaker County, Florida - New Baker County Elementary School GPAsumplons/Qulaton/Cartiatbant Exhibit1-C GMP Book dated 2/23/21 schedule. The estimate does not include separate owner or architect contingencies. The Construction Manager recommends that the Owner carry their own contingency. 5. Contingency for market escalation is not included for any phase. 6. The cost ofaj performance and payment bond is included. 7. Builder'si risk insurance isi included and provides protection to property that is damaged during the course of construction, in transit to the job site or temporarily stored offsite on the designated 8. General liability insurance is included and provides protection for injuries or damages caused toa third party that is not covered by automobile or professional liability. Workers comp, automobile, 9. Subcontractor default insurance is included and mitigates the Owner and Construction Manager's risk ofl loss, through the statute ofi repose period, for subcontractors who fail to meet the terms of 10. No costs have beeni included for permits (including building permits and Right of Way permits) of 11.No allowances are included for any changes that may result from the final reviews, approvals or 12. We assume all permitting, including but not limited to, SJRWMD, DEP, ACOE, DOT, and all other 13. We have included an allowance for material testing for the: following: asphalt, concrete, masonry, project. and professional liability insurance costs are incorporated into this line item. their subcontract. any kind, impact fees, or utility connection charges. permitting by a required regulatory. related agencies has been approved. steel & soils testing. 14. No costs for threshold: inspection fees have been included. 15. This GMP assumes that the water service, as noted on C701, willl bei installed prior to the Construction Manager installing the water line. The Construction Manager does not take 16. This GMP assumes permanent power will be brought to the site prior to the Construction Manager needing permanent power. The Construction Manager does not take responsibility for delays caused 17.No special provisions have been included for sustainable design or construction certifications. 18. It is expressly stated that there could be labor and material impacts of COVID-19 and these impacts are beyond the Construction Manager'sreasonablc control and are not foreseeable by the Construction Manager at thet time ofexecuting this GMP. Iffaced with detrimental impacts due to COVID-19during the performance of this Project, the Construction Manager will mitigate the resulting schedule and monetary impacts. However, the Construction Manager does not guarantee nor assume the schedule responsibility for delays caused by third party entities. by third party entities. or monetary impacts of COVID-19. 11 The School Board of Baker County, Florida - New Baker County Elementary School MPAsumpton/Quliatom/Canatbant Exhibit1- -GMP Book dated 2/23/21 19.A detailed estimate of general conditions costs is included as required under Attachment C. Upon approval ofs same, general conditions will convert to lump sum and! be billedi in equal monthly amounts. Division 01-A Allowances 1. Some Value. Alternatives ("*VA") items are allowances. See VA section for detailed breakdown. 2. Brick veneer: $350 per thousand. The specifications do not call out brick type. Division 02 - Existing Conditions 3. Hazardous materials survey, removal and mitigation is noti included. Division 04 - Masonry 1. Brick veneer included as standard, modular size. 3. See VA list for alternative masonry solutions. 2. Brick veneer: $350 per thousand. The specifications do not call out brick type. Division 03 - Concrete 1. Noi moisture mitigation is included. Ifneeded, the expense for moisture mitigation will first be drawn from Owner Direct Purchase budget. The reimbursement would bei in the form ofa change order from the Owner to the Construction Manager. Ifthe Owner Direct Purchase savings is not sufficient to cover the cost for moisture mitigation, the Construction Manager's Contingency (if remaining) shall cover the balance. 2. See VA list for alternative concrete solutions. Division 05 = Steel 1. Steel angle rails are located at both sides oft the hall in the mezzanines. We assume all the locations where steel angle rails are depicted (4/A4.2) are also Type 10 walls (with gypsum-sheathed walls). See VA list for reduction of the steel rails. IfVA taken, wood rails have been added to the 2. Price does not include 16-guage top cord minimum per note 7/S0.1. We will provide a sealed letter ofe engineering deck attachment method to meet the project design and wind loads as done on Kate Smith and Hamilton Elementary Schools. Also, we assume hips, ridges, and valleys to be 12Gal bent mezzanine in the Administrative area as fall protection. plate. 3. See VA list for alternative steel/truss solutions. 12 The School Board ofl Baker County, Florida - New] Baker County Elementary School GMPAsumpton/Q.ulliaten/Caliation: Exhibit1 1- GMP Book dated 2/23/21 Division 07 - Thermal and Moisture Protection 1. Spray-applied fireproofing is not required, nor included in the GMP. 2. The basis of design roof system included as. Peterson Tite-Lok Plus Kynar standing seam metal roof over high temperature peel & stick underlayment over two layers of2.6" polyisocyanurate insulation. 3. See VA list for alternative roof panel system. 4. Roofsystem includes the specified! 20-year manufacturer's warranty. 5. Roofs system includes ai two-year Contractor's Workmanship Warranty. Division 08 - Openings I. Exterior windows are: included with non-impact rated glazing. 2. Overhead coiling doors are Cornell ESD20. Division 09 - Finishes 1. Hard tile is not anticipated at any walls. 2. See VA list for alternative flooring products. Division 10 - Specialties 1. Exterior lettering at the main entrance to be cast aluminum. 2. Street sign: Daktronics Galaxy Outdoor Message Center 3. Operable partitions are noti included. anticipated ori included. Division 11 - Equipment 4. New walkway covers included as clear anodized aluminum finish. No veneer/column wraps are 1. Appliances are indicated to be OFOI and are therefore excluded. 2. Exterior playground recreation equipment is not included. 4. Desks, chairs, tables, and loose furniture is noti included. 3. Only the site furnishing specifically called for CFCI in the plans are included. 5. See VA list for food service equipment allowance. The VA for this scope of work is an allowance. 13 The School Board of Baker County, Florida- - New Baker County Elementary School GMPAsumptom/Qualieatont Exhibit 1-GMP Book dated 2/23/21 Division 12-F Furnishings 1. Tables, desks, chairs, and other movable furniture is not included. Division 21 - Fire Suppression 1.A A wet-pipe fire sprinkler system is included throughout conditioned space and mezzanines. 2. A dry-pipe fire sprinkler system is included at loading dock. 3. No fire protection is included att the covered play area, canopies, or attics. 4. A: fire-water booster pump is not included. We assume there will be sufficient water pressure, soa booster pump norl holding tank will not be necessary. 5. Signing and sealing of fire protection shop drawings is not included. Division 22 - Plumbing fittings are type L copper. Division 23-H HVAC 1. The sanitary, waste & vent system is PVC schedule 40 solid core. Domestic water piping and 2. See VA list for alternative plumbing solutions. 1. See VA list for alternative HVAC system solutions. Division 26 - Electrical 6. Lightning protection is included. equipment in lieu ofHikvision. 7. Hikvision cameras are currently on a government blacklist. This GMP includes Hanwah/Samsung 8. See VA list for alternative electrical and low voltage solutions. The VA for this scope ofwork is an allowance. Division 31 - Earthwork 1. This GMP does not include an allowance for removal and replacement of unsuitable material. If necessary, removal ofu unsuitable soils will cost will be calculated per $12.50/CY - truck measure. Clean import fill to replace the unsuitable soils (ifnecessary) will be $12.50/CY. 2. No rock excavation requiring more than standard machinery, or hauling is included. 3. Heavy duty and standard duty asphalt paving is included where indicated. The standard duty pavement will be installed in two 1" lifts to meet FDOT standards. 14 The School Board ofBaker County, Florida -1 New Baker County Elementary School GPAsumplon/Qulieto/Carthatont Exhibit1- GMP Book dated 2/23/21 4. Aluminum canopy footings are assumed tol be 3'x3'x3' until delegated design is complete. 5. The geotechnical report shows small potential for subterranean clays and karst: formations (limerock chimneys or sinkholes). There is no way to accurately estimate the impact this willl have. Itis assumed that any unsuitable soils encountered will be able to be re-used on site in green areas. Ifnot, the unit rates above would apply. Boulders or other underground issues are. not included. 6. The addendum Geotechnical Report dated. January 27, 2021 requires settlement plates to be installed for monitoring settlement during the import fill operation. This GMP does noti include costs associated with delays that could occur due to settlement issues. Settlement plates and monitoring is 7. See. Attachment B. The areas highlighted in yellow are not part of] Phase 1. IfPhase 2 is approved, included. thel highlighted areas willl be added to the Phase 2 scope of work. 8. See VA list for alternative sitework solutions. Division 32- Exterior Improvements 1. Sod has been included per C301. All sod included is figured as Bahia. The civil drawings call for centipede, but centipede will not grow in this area; especially without irrigation. No other plantings ori irrigation are included. 2. See VA list for alternative sodding solutions. 3. See VA list for modifications at perimeter fence. The VA for this scope ofv work is an allowance. 5. Aluminum fencing withing this GMP includes Antebellum Manufacturing in lieu of] Merchants 6. Wel have included a 4" salt and pepper well for temporary water. This can be left for the Owner's use 4. Fencing around ponds and mechanical equipment pads: galvanized. Metals. upon completion oft the project. General Exclusions 1. Inspection Fees, Downstream Pollution Fees, Impact Fees, DOT Fees, and Meter Fees; 2. Initial surveys; 3. Jobsite trailers, besides for Construction Manager; 4. Dewatering for extreme weather conditions, including hurricanes; 5. Environmental insurance; 6. Builder's Risk claim deductibles; 7. Environmental surveys, soil borings, infiltration tests, traffic studies, tree and lot surveys; 15 The School Board of Baker County, Florida -1 New Baker County Elementary School MPAsumpton/Qulietom/Caniiatont Exhibit 1- GMP Book dated 2/23/21 8. Offsite utility work, except as specifically noted on plans; 9. Site electric primary lines, transformers, meters, or oversight oft the utility company, including ordering of any ofthese items; 10. Hazardous waste removal or contaminated soil removal; 11. State fire marshal review or inspection fee; 12. Cost ofe easements and right-of-ways for utilities; 14. Grassing or landscape maintenance; 13. Permanent utility charges, deposits or costs (gas, power, phone, water, etc.); 15.Land cost; 16. Relocation cost; 17.N Mockups; 18. Development fees; 19. Owner or designer contingencies; 20. Furnishing, fixtures & equipment 16 Exhibit1- GMP Book dated 2/23/21 n Perry-McCall CONSTRUCTION/INC: GMPVALUEALTERMAIES DETALEDDESCNPTONS Division 01 - General Conditions 1. The value alternative items described in this list will be duplicated for Phase 2 if authorized by the 2. VE 01.1 - Reimbursable GC's: The contract between Owner and Construction Manager dated September 8, 2020 defines the Construction Manager's General Conditions as lump sum (in lieu of reimbursable). As such, this VE 01.1 credits the Owner $121,800 for an administrative assistant that will not longer be needed because the Construction Manager will not be responsible to compile documentation that would have been required for reimbursable General Conditions (because the owner at ai future date. General Conditions are: now lump sum). Division 04 - Masonry previous CRA projects. oft this scope. modification. Division 03 = Concrete previous CRA projects. ofthis scope. modification. Division 05-S Steel 1. VE03.1 Allowance to Use Masonry bond beams in lieu of cast-in-place concrete beams similar to 2. VE03.1- -t this is an allowance until the structural engineer has approved the extent and requirements 1. VE03.1 - Allowance to Use Masonry bond beams in lieu of cast-in-place concrete beams similar to 2. VE 03.1 -1 this is an allowance until the structural engineer has approved the extent and requirements 1. VE05.1- Guard rails & ladders at mezzanines above corridors: Delete angles in the mezzanine corridors since drywall is existing & change all aluminum ladder/rails to primed steel at the mezzanines. Wood rails have been added to the mezzanine in the Administrative area as fall protection in lieu of steel rails. Light gauge metal studs have been added as handrails in the mezzanine at thel Media areai for fall protection. 17 The School Board ofl Baker County, Florida - New Baker County Elementary School GMP Value. Alternates Exhibit 1 - GMP Book dated 2/23/21 2. VE052-Pe-Enginvered Metal Trusses - Use 12 Gauge Bent Metal in lieu of 1/4" bent plate at eaves, gable ends, and expansion joints. Division 07 - Thermal and Moisture Protection 1. VE07.1- - Metal Roofing Use Peterson Roof] Panels Snap Clad with Galvalume inl lieu of Peterson Tite-Loc Plus roof and soffit system. VE 07.1 includes the specified 20-year manufacturer's warranty. Division 09 - Finishes 1. VE09.0- - Abusive resistant drywall - Remove abusive GWB below 8 and replace with standard 2. VE09.1 - Alternative flooring products - Change LVT flooring from Tarkett Contour to Tarkett ID 3. VE09.2-A Alternative flooring products Change carpet from Tarkett Blocase to any of the following styles from Tarkett (Resonate, Capture, Substance, Vellim, Bindery or Stamp). 4. VE09.3-A Alternative flooring products - Delete inside & outside corners of vinyl base 5. VE09.4- Alternative flooring products - Use Resinous Flooring (Dex-0-Tex. Décor Flor) in lieu of 6. VE09.5-1 Alternative flooring products - Use Resinous Flooring (Stonehard SLT 2MM Cobalt GWB. Latitudes. tilei in all bathroom floors and base. Medi) in lieu of quarry tile in the Kitchen. Division 11 - Equipment manufactures. Division 22 - Plumbing 1. VE11.1-1 Alternate Manufacturers - Kitchen VA Allowance to use alternate equipment 1. VE22.1-1 Use CPVC in lieu of copper piping. 2. VE22.2- Alternate Plumbing Manufactures Seel Below P101-Toilet, Flush Valve (V-151M) change from Sloan 113-1.28 to Zurn Z6000 P102-Toilet, Flush Valve (V-151M) change from Sloan 113-1.28 to Zurn Z6000 P251-Urinal, Flusb Valve (V-251M) change from Sloan Weus 1000.1001-0.13 to Zurn Z6003 P403-Lavatory, Faucet (F403 change from Chicago 2200-4B2805ABCP to Zurn Z7440-XL P405-Lavatory, Faucet (F411 change from Chicago 807-EI2-665PAB to Zurn Z86300-XL 18 The School Board of Baker County, Florida - New Baker County Elementary School GMP Value-Alternates Exhibit 1- GMP Book dated 2/23/21 P407-Lavatory, Faucet (F411 change from Chicago 807-E12-665PAB to Zurn L86300-XL P501-Single Sink, Faucet (F405 change from Chicago 2302-ABCP to. Zurn Z824BO-XL P503-Double Sink, Faucet (F405 change from Chicago 2302-ABCP to Zurn Z824BO-XL P520-Mop Sink, Faucet (F407 change from Chicago 40-LD-897-WAFABCP to Zurn Z843M1 P531-Single Sink Change Fixture from Elkay LRAD-1517 to. Just SL-ADA-18I5-A-GR, P531-Single Sink, Faucet (F440 change from Chicago LWS1-Al1-G to Zurn Z812B4-XL P551-Single Sink, Faucet (F405 change from Chicago 2302-ABCP to Zurn Z824BO-XL P551-Single Sink, Bubbler/Push (F415 change from Chicago 748-665ABCP to Zurn L83600-AL P552-Single Sink, Faucet (F417 change from Chicago 350-E35VP3I7AKABCP to Zurn Z825B4- WH8.1 & 8.2-Water Heater Change fixture from A.O. Smith BTH 250 to Rheem GHESU/SS-250 WH1.1 thru 7.1-Water Heater Change fixture from A.O. Smith DEN 40 to. Rheem ELD40-TB 3. VE22.3 -Alternate Ball valves - Allowance to use different product than specified. 4. VE22.4-1 Eliminate LP Gas Tank from Construction Manager's scope. LP Gas Tanks now OFOI. XL Division 23 - HVAC VE23.1-1 This pricing reflects changes to the HVAC design taking notes from our past Value Alternative: successes with H21 Engineering on multiple projects, including the Hamilton project V.E. that was approved by H2Engineering and CRA team. This VE23.1 will require approval from the mechanical engineer prior to proceeding. The HVAC components have been altered as follows: 1. Changed Controls. DDC system deleted ini its entirety. We will provide Honeywell 8000 series WiFi capable thermostats for all units with the exception oft thel MAUL Units. This would allow the owner to remotely control this equipment (setpoints and schedules). MAU Units would be provided with factory controls with built in scheduling. Exhaust Fans would be interlocked with thermostat schedule or time clocks with the exception off fans that are interlocked with light switches or occupancy sensors by division 26 and fans serving kitchen equipment. Indoor above ceiling control wire will be plenum rated cable (noti in conduit) including mezzanine levels. Concealed (In wall) and outdoor wiring will be EMT conduit with 2. Changed equipment quantities and capacities) Regarding A/C units serving classrooms and like spaces, one unit pert two classrooms would be provided in lieu ofo one unit per classroom. This would require units tol be upsized accordingly. Administration, Cafeteria, Auditorium, and other special use type spaces would remain as is. Alternate manufacturer units would be compression fittings. provided. 19 The School Board of] Baker County, Florida - New Baker County Elementary School GMP Value. Alternates Exhibit 1- GMP Book dated 2/23/21 Bipolar Ionization units at each split system would be utilized to reduce the capacity oft the MAU Units while satisfying air quality requirements. The estimated reduction in capacity has been provided by the engineer ofrecord. VA pricing reflects this accordingly. MAU Equipment listed in the specifications would be provided, but not necessarily basis of design. Pricing is based on the following MAU revised capacities: -MAU-1.17Tons -MAU-2.1 20Tons -MAU-4.1, 5.1,6.1-30T Tons -MAU-8.1 Remains as designed-50 Tons -MAU-7.1 15 Tons 3. Changed Ductwork layout and material (still metal, we do not recommend duct board)-The B) Alternate manufacturers for air distribution (grilles, registers, diffusers, and: flexible ductwork serving the classrooms would be changed to the following: A) Snaplock round duct in lieu ofi rectangular and spiralducts. ductwork.) 4. Changed Refrigerant Piping products. Pre-Insulated Soft Drawn CopperL Line sets in lieu of! hard drawn field insulated copper refrigerant piping. Exterior piping would remain hard drawn copper, but the aluminum jacketing would be deleted and replaced with two coats of Armaflex UV paint for protection ofthe exterior insulation. Insulation would be 3 inch wall thickness. 5. Changed Insulation per revisions to duct and piping (See item 4 regarding pipinginsulation). . Simplified Test and Balance scope. Delete the requirement for return air grille balance. Dampers would be verified open and reading taken, but no balance at the grilles. Also, Commissioning participation deleted. 7. Delete BIM coordination and BIM 360j participation. 8. Change Grilles Registers and Diffusers to Painted Steel 9. Change Flexmaster IMR6 Duct to. Atco 36. Division 26 - Electrical 1. VE26.1 - Electrical & Low Voltage VE. Allowance's including: delete gear study, delete lightning protection, use. MC for lighting/fire alarm, & VE: for: gear, lighting, intercom, AV& CCTV Division 31-E Earthwork 1. VE31.1 - Use HDP (corrugated plastic) storm water piping in lieu of RCP (concrete pipe). 20 The School Board of Baker County, Florida - New Baker County Elementary School GMP Value. Alternates Exhibit 1- GMP Book dated 2/23/21 Division 32 - Exterior Improvements 1. VE32.1 - Grass Seeding (Bahia) in lieu of Sodding (Bahia). 2. VE32.2-F Reduce Redesign Fencing around Retention. This eliminates the fencing on the back side of the ponds. This is an allowance. 21 AR : - Exhibit 1- GMP Book dated 2/23/21 Perry-McCall CONSTRUCTION/INC: GMP DOCUMENTLOG Number Name ADDENDA Issue Date Issue Description 01/08/2021 ADDENDUM NO.01 01/08/2021 ADDENDUM, NO.01 01/15/2021 ADDENDUM NO.02 01/14/2021 ADDENDUM NO.02 12/16/2020 100% CD'S 02/21/2021 PHASINGI PLAN 01/15/2021 ADDENDUM #2 12/16/2020 100% CD'S 01/15/2021 ADDENDUM #2 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM: #2 12/16/2020 100%CD'S 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM #2 12/16/2020 100% CD'S 01/15/2021 ADDENDUM. #2 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM: #2 12/16/2020 100% CD'S ADDENDUM NO. 01 NARRATIVE- CRAA ARCHITECTS ADDENDUM, NO. 01 NARRATIVE- H2 ENGINEERING. ADDENDUM NO. 02 NARRATIVE- - CRA ARCHITECTS ADDENDUM NO. 02 NARRATIVE: 4 H2 ENGINEERING DRAWINGS COVER SHEET ANDI INDEX OF DRAWINGS CAMPUSI PLAN PHASING INDEX PAGE EXISTING CONDITIONS EROSION CONTROL PLAN: EROSION CONTROL DETAILS SODDING MAP WETLAND IMPACT MAP OVERALL SITE PLAN. TURN LANE SITE PLAN ENLARGED TURNI LANE. PLAN TURN LANE CROSS SECTIONS TURN LANE CROSS SECTIONS TURN LANE SIGNAGE. AND STRIPING PLAN ENLARGED ENTRY ROADWAY. PLAN: ENLARGED ENTRY ROADWAY PLAN OVERALL CAMPUS PLAN. ENLARGED SITE PLAN ENLARGED SITE PLAN OVERALL GRADING PLAN ENLARGED CAMPUS GRADING: PLAN: ENLARGED GRADING PLAN ENLARGED GRADING PLAN ADAI RAMP DETAILS SWMF PLAN ANDI PROFILE SWMF PLAN ANDE PROFILE DRAINAGE PLAN T-1 PHASING CIVIL C001 C101 C201 C202 C301 C302 C401 C402 C403. C404 C405 C406 C407 C408 C409 C410 C411 C501 C502 C503 C504 C505 C506 C507 C601 23 Exhibit 1- GMP Book dated 2/23/21 The School Board of] Baker County, Florida - New Baker County Elementary School GMP Document. Log Number C602 C603 C604 C701 C702 C703 C801 C802. C901 C902 ARCHITECTURAL AS1.0 LS1.0 LS1.1 LS1.2 LS1.3 ES1.4 LS1.5 LS1.6 A1.0 A1.0A A1.1 A1.2: A1.3 A1.4 A1.5 A1.6 A2.1 A2.2 A2.3 A2.4 A3.1 A3.2 A3.3 A4.0 A4.1 A4:2 A4.3 A4.4 A5.1 A6.1 A6.2 A6.3 A6.4 Name DRAINAGE PLAN BLDG DOWNSPOUT, PLAN BLDG DOWNSPOUT PLAN OVERALL UTILITYF PLAN" CAMPUS UTILITY PLAN ENLARGED! UTILITY PLAN. TYPICAL SITE DETAILS TYPICAL STORM DETAILS TYPICAL UTELITY DETAILS PUMPSTATION. DETAILS ARCHITECTURAL SITE PLAN LIFE SAFETY PLAN ADMIN/MEDIA LIFE SAFETY PLAN LIFE: SAFETY PLAN CLASSROOM WING3&4 LIFE SAFETY PLAN CLASSROOM WING3&5 LIFE SAFETY PLAN CLASSROOM WING 6 LIFE SAFETY PLAN CLASSROOM WING7 LIFE SAFETY PLAN CAFETERIA: CAMPUS PLAN SITE DETAILS ADMIN & MEDIAI FLOOR PLANS CLASSROOM WING 3&4& COVERED PLAY CLASSROOM WINGS3&5 CLASSROOM WINGE 6 CLASSROOM' WING7 CAFETERIA FLOORI PLAN ADMIN, MEDIA & CAFETERIA ELEVATIONS MEDIA/ESE WING 200, 400 & 500ELEVATIONS WINGS 500, 600 & 700 CAFETERIA WING 800 ELEVATIONS WING, 600 & 700 ELEVATIONS BUILDING CROSS SECTIONS BUILDING CROSS SECTIONS & COVERED PLAY FLOOR PLAN BUILDING CROSS SECTIONS CAFETORIUM BLDG- PLAN SECTIONS ANDI DETAILS WALLI PARTITIONS AND DETAILS WALLS SECTIONS. WALLSECTIONS WALL SECTIONS ENLARGED TOILET PLANS MILLWORK1 ELEVATIONS MILLWORK DETAILS INTERIORI ELEVATIONS INTERIOR ELEVATIONS Issue Date Issue Description. 01/15/2021 ADDENDUM: #2 01/15/2021. ADDENDUM: #2' 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM #2. 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM: #2 12/16/2020 100% CD'S 12/16/2020: 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 01/15/2021 ADDENDUM #2 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020, 100%.CD'S 12/16/2020 100%CD'S 12/16/2020: 100% CD'S 12/16/2020 100%C CD'S 12/16/2020 100%CD'S 01/08/2021 ADDENDUM #1 12/16/2020 100%:CD'S 12/16/2020 100%CD'S 12/16/2020 100%'CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%C CD'S 01/15/2021 ADDENDUM: #2 12/16/2020 100% CD'S 12/16/2020 100%, CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%.CD'S 12/16/2020 100%0 CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%0 CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020: 100% CD's: 12/16/2020 100% CD'S 24 Exhibit 1- GMP Book dated 2/23/21 The School Board of Baker County, Florida - New Baker County Elementary School GMP Document. Log Number A6.5 A7.1 A7.2 A8.1 A8.2 A8.3 A8.4 A8.5 A8.6. A8.7 A9.1 A9.2 A9.3 A10.1 A10.1A A10.2 A10.2A A10.3 A10.3A A10.4 A10.4A: A10.5 A10.5A A10.6 A10.6A A11.1 A11.2. A11.3 A11.4 A11.5 A11.6 STRUCTURAL S0.1 S0.2 $0.3 S0.4 S0.5 $1.1 S1.2 $1.3 $2.1 S2.2 S2.3 Name INTERIOR: ELEVATIONS. WINDOW, ANDI DOOR ELEVATIONS WINDOW: ANDI DOOR DETAILS ADMIN & MEDIA REFLECTED CEILINGI PLANS CLASSROOM; WING3&4 4F REFLECTED CEILING PLANS, CLASSROOM WING3 3&5F REFLECTED CEILING PLANS CLASSROOM: WING 6F REFLEÇTED: CEILING PLANS CLASSROOM WING 7F REFLECTED CEILING PLANS CAFETERIA REFLECTED: CEILING PLANS CEILING FRAMING DETAILS ROOF PLAN: MEZZANINE PLAN ROOFI DETAILS ADMIN & MEDIA FINISH PLAN ADMIN & MEDIA : FLOOR PATTERN PLAN CLASSROOM' WING38 &4- FINISH PLAN CLASSROOM WINGS3&4- FLOOR PATTERN PLAN CLASSROOM WING 4- FINISH PLAN CLASSROOM WING3 &5-FLOOR PATTERN! PLAN: CLASSROOM WINGE 6F FINISH PLAN CLASSROOM WING6F FLOOR: PATTERN PLAN: CLASSROOM WING 7F FINISH PLAN CLASSROOM WING7F FLOOR PATTERN. PLAN. CAFETERIA- FINISH PLAN CAFETERIA: FLOOR PAITERN PLAN ADMIN & MEDIA FURNITURE & EQUIPMENT PLANS ÇLASSROOM WING 3&4& COVERED. PLAY FURNITURE. & EQUIPMENTPLANS CLASSROOM' WINGS38 & 5F FURNITURE & EQUIPMENT PLANS CLASSROOM: WING 6F FURNITURE & EQUIPMENT PLANS CLASSROOM' WING 7 FURNITURE & EQUIPMENT PLANS CAFETERIA! FLOOR PLAN FURNITURE. AND EQUIPMENT PLANS Issue Date Issue Description 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%. CD'S 01/08/2021 ADDENDUM #1 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S, 12/16/2020 100% CD'S 12/16/2020 100%CD'S: 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD's 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020. 100% CD'S: 12/16/2020 100% CD'S 12/16/2020 100% CD'S 01/15/2021 ADDENDUM: #2 01/15/2021. ADDENDUM #2 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S. 12/16/2020 100% CD's 12/16/2020 100% CD'S 12/16/2020 100%CD'S GENERAL STRUCTURAL NOTES DETAILS SECTIONS SECTIONS SECTIONS ADMINISTRATION FOUNDATION PLAN ADMINISTRATIONI LOW ROOF & MEZZANINE FRAMING PLAN ADMINISTRATION: ROOFF FRAMING PLAN MEDIA/ESE FOUNDATION PLAN MEDIA/ESE1 LOW ROOF & MEZZANINE FRAMING PLAN MEDIA/ESE ROOF FRAMING PLAN 25 Exhibit1 1- GMP Book dated 2/23/21 The School Board of] Baker County,Florida- - New Baker County Elementary! School GMPDocument. Log Number $3.1 $3.2 $4.1 S4.2 $5.1. $5.2 S6.1 $6.2 $7.1: $7.2 MECHANICAL MO.1 MO.2 MO.3 M1.1 M1,2 M1.3 M1.4 M1.5 M1.6 M1.7 M2.1 M5.1 M5.2: CONTROLS ICO.1 IC1.1 IC1.2 IC1.3 IC1.4 JC1.5 IC1.6 1C2.1 IC2.2 PLUMBING PO.1 P1.0 P1.1 P1.2 P1.3 P1.4 P1,5 Name Issue Date Issue Description 12/16/2020 100% CD'S 01/15/2021 ADDENDUM: #2 12/16/2020 100% CD'S. 01/15/2021 ADDENDUM: #2 12/16/2020 100% CD'S 01/15/2021 ADDENDUM: #2 12/16/2020. 100% CD'S: 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM: #2 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020. 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%C CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S. 12/16/2020 100%0 CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD's 12/16/2020 100% CD'S 12/16/2020; 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 01/08/2021 ADDENDUM: #1 12/16/2020 100% CD'S 01/15/2021 ADDENDUM: #2 12/16/2020 100% CD'S 01/08/2021 ADDENDUM#1 01/08/2021 ADDENDUM: #1 01/15/2021 ADDENDUM#2 12/16/2020 100% CD'S 01/08/2021 ADDENDUM#1 CLASSROOM WINGS. 300 & 400. FOUNDATION PLAN CLASSROOM WINGS 300 & 400 ROOF FRAMINGI PLAN CLASSROOM WINGS 300: & 500 FOUNDATION PLAN CLASSROOM' WINGS 300 & 500 ROOF FRAMING PLAN CLASSROOM WING 6001 FOUNDATIONI PLAN. CLASSROOM' WING 600 ROOF FRAMING PLAN CLASSROOM WING 700 FOUNDATION, PLAN CLASSROOM WING 700 ROOF FRAMING PLAN CAFETERA/CUSTODIAL FOUNDATION, PLAN: CAFETERI/CUSTODIAL ROOF FRAMINGI PLAN GENERAL NOTES, LEGEND, AND: SCHEDULES HVAC ADMINISTRATION, ANDI MEDIAI FLOOR PLANS HVAC CLASSROOM FLOORI PLAN 4) WING 38 &4: HVAC CLASSROOM FLOOR PLAN WING 5- HVAC CLASSROOM FLOORJ PLAN -WING 6- HVAC CLASSROOM FLOOR PLAN- WING 7- HVAC CAFETERIA, FLOOR PLAN- HVAC ENLARGED CAFETERIA FLOORI PLAN- HVAC SECTIONS- HVAC: DETAILS-HVAC DETAILS-HVAC SCHEDULES- HVAC SCHEDULES HVAC ADDENDUM: #1 ADDENDUM#1 ADDENDUM#1 GENERAL NOTES, LEGEND. ANDI DETAILS-CONTROIS ADMINISIRATION; ANDI MEDIAFLOOR PLAN CONTROLS CLASSROOM FLOORI PLAN- WING 3&4-0 CONTROLS CLASSROOM, FLOORI PLAN WING: 5- CONTROLS CLASSROOM FLOOR PLAN- WING 6- CONTROLS CLASSROOM FLOOR PLAN WING 7- CONTROLS CAFETERIA FLOORI PLAN CONTROLS CONTROLS- HVAC CONTROLS- HVAC GENERAL NOTES, LEGENDS ANDS SCHEDULES- PLUMBING ADMINISTRATION, AND MEDIA FLOOR PLANS -PLUMBING CLASSROOM FLOOR PLAN- WING 4- PLUMBING CLASSROOM FLOORI PLAN- WING! 5- PLUMBING CLASSROOM FLOORI PLAN- WING 6-F PLUMBING CLASSROOM FLOOR PLAN WING 7- PLUMBING CAMPUS PLAN- PLUMBING 26 Exhibit1-GMP Book dated 2/23/21 The School Board of Baker County, Florida - New Baker County Elementary School GMP Document, Log Number P1.6 P3.1 P3.2 P3.3 P5.1 P6.1 P6.2 P6.3 P6.4 FIRE PROTECTION F0.1. F1.0 F1.1 F1.2 F1.3 F1.4 F1.5 F1.6 F5.1 FOOD SERVICE FS1.1 FS1.2 FS1.3 FS1.4 FS1.5 ELECTRICAL E0.1 E1.0 E1.1 E1.2 E1.3 E1.4 E1.5 E1.6 E1.7 E1.8 E2.1 E2.2 E2.3 E2.4 E2.5 E2.6 Name Issue Date Issue Description 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM, #2 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM #2: 01/15/2021 ADDENDUM #2 01/08/2021 ADDENDUM #1 12/16/2020 100% CD'S 12/16/2020. 100% CD'S 12/16/2020 100% CD'S 12/16/2020: 100%.CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020, 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 01/08/2021 ADDENDUM: #1 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 01/08/2021 ADDENDUM #1 12/16/2020 100% CD'S: 01/15/2021 ADDENDUM #2 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020: 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 01/15/2021 ADDENDUM: #2. 01/08/2021 ADDENDUM #1 01/08/2021 ADDENDUM: #1 01/15/2021 ADDENDUM: #2 01/08/2021 ADDENDUM: #1 12/16/2020 100% CD'S 12/16/2020 100%CD'$. 01/08/2021 ADDENDUM#1 CAFETERIA FLOOR PLAN-PLUMBING ENLARGED FLOOR, PLANS PLUMBING ENLARGED FLOOR PLANS- -PLUMBING ENLARGED.I FLOOR PLANS PLUMBING DETAILS- PLUMBING ISOMETRICS: PEUMBING SOMETRICS- PLUMBING ISOMETRICS.: PLUMBING SOMETRICS- PLUMBING GENERAL: NOTES; LEGEND) AND SCHEDULES FIRE PROTECTION ADMINISTRATION, ANDI MEDIAT FLOOR PLANS- FIRE PROTEÇTION CLASSROOM FLOOR PLAN- -WING 4-F FIRE PROTECTION CLASSROOM. FLOOR PLAN -WING 6-FIRE PROTECTION CLASSROOM FLOORI PLAN -WING 6- FIRE PROTECTION CLASSROOM FLOOR PLAN -WING 7- FIRE PROTECTION CAFETERIA FLOOR PLAN- FIRE PROTECTION DETAILS FIRE PROTECTION ENLARGED KITCHEN PLAN DETAILS DETAILS DETAILS DETAILS CAMPUS PLAN FIRE PROTECTION GENERAL NOTES LEGEND AND) SCHEDULE' SITE PLAN- ELECTRICAL ADMINISTRATION. ANDI MEDIA FLOOR PLANS LIGHTING CLASSROOM FLOOR PLAN- WING 4- LIGHTING CLASSROOM FLOOR PLAN WING 5- LIGHTING CLASSROOM FLOORI PLAN- WING 6-1 LIGHTING CLASSROOM FLOORI PLAN: WING 7- LIGHTING CAFETERIA FLOORI PLAN LIGHTING MEZZANINE FLOOR PLAN -ELECTRICAL MEZZANINE FLOORF PLAN EQUIPMENT ADMINISTRATION. ANDJ MEDIAI FLOOR PLANS POWER CLASSROOM FLOORI PLAN- WING4 4- POWER CLASSROOM, FLOOR PLAN- WING5-P POWER CLASSROOM FLOORI PLAN- WING 6- POWER CLASSROOM, FLOORI PLAN-M WING7-F POWER CAFETERIA FLOOR PLAN -POWER 27 Exhibit 1-GMP Book dated 2/23/21 The School Board of Baker County, Florida - New Baker County Elementary School GMP Document. Log Number E2.7 E3.1 E4.1 E4.2 E4.3 E4.4 E4.5 E4.6 E5.1 E5.2 TELECOM To.1. T1.1 T1.2. T1.3 T1.4 T1.5 T1.6. T1.7 T2.1 T2.2 SECURITY SEO.1 SE0.2 SE1.0 SE1.1 SE1.2 SE1.3 SE1.4 SE1.5 SE1.6 SE2.0 AUDIOVISUAL AVO.1 AV1.1 AV1.2 AV1.3 AV1.4 AV1.5 AV1.6 Name Issue Date Issue Description 01/08/2021 ADDENDUM#1 12/16/2020 100%CD'S 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM: #2 01/08/2021 ADDENDUM: #1, 01/15/2021 ADDENDUM #2 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%.CD'S 12/16/2020 100%CD'S ENLARGED KITCHEN PLAN POWER: CAMPUS PLAN LIGHTNING PROTECTION ONE-LINE DIAGRAM PANEL SCHEDULES- ELECTRICAL PANEL SCHEDULES: ELECTRICAL PANEL SCHEDULES- ELECTRICAL GROUNDING DIAGRAM: ELECTRICAL FIRE ALARM RISER DIAGRAM DETAILS- ELECTRICAL DETAILS- ELECTRICAL GENERAL NOTES; LEGEND, ANDI DETAILS-TELECOMMUNICATIONS 01/08/2021. ADDENDUM: #1 ADMINISTRATION. ANDI MEDIA FLOOR PLANS- TELECOMMUNICATONS CLASSROOM FLOOR PLAN MRGA-TICOMMUNCATOS CLASSROOM FLOORI PLAN- WAGSTALCOMMINCATONS CLASSROOM. FLOORI PLAN: -WING GTELECOMMUNICATIONS CLASSROOMI FLOORI PLAN WAG7-THLOMUNCATONS ÇAFETERIA FLOOR. PLAN TELECOMMUNICATIONS EMERGENCY RESPONDER: 2-WAY RADIO DETAILS GENERAL NOTES, LEGEND, AND RISERJ DIAGRAM: SECURITY DOOR. SECURITY DEVICE ROUGH-IN DETAILS SITE PLAN SECURITY: ADMINISTRATION, AND MEDIA- SECURITY CLASSROOM FLOOR. PLAN - WING 4-S SECURITY CLASSROOM FLOORI PLAN- WING 5- SECURITY CLASSROOM FLOOR PLAN N WING 6- SECURITY. CLASSROOM FLOORI PLAN- WING7-SECURITY CAFETERIA: FLOORI PLAN SECURITY DETAILS- SECURITY 01/08/2021 ADDENDUM#1 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 01/08/2021 ADDENDUM: #1 12/16/2020 100% CD's 12/16/2020 100%CD'S 12/16/2020- 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%0 CD'S 12/16/2020 100% CD'S 01/08/2021 ADDENDUM#1 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S. 12/16/2020 100% CD'S 12/16/2020 100% CD'S, 12/16/2020 100%CD'S 12/16/2020 100%CD'S ENLARGED COMM ROOM FLOOR PLANS TELECOMMUNICATIONS 12/16/2020 100%CD'S RISER DIAGRAM. AND RACKE ELEVATIONS- TELECOMMUNICATONS 12/16/2020 100%CD'S GENERAL NOTES, LEGEND, ANDI DETAILS -AUDIO-VIDEO ADMINISTRATION, ANDI MEDIAI FLOOR PLANS- AUDIO-VIDEO CLASSROOM FLOOR PLAN-WING 4-AUDIO-VIDEO CLASSROOM FLOOR PLAN- WING. 5-A AUDIO-VIDEO CLASSROOM, FLOOR PLAN- -WING 6-A AUDIO-VIDEO CLASSROOM FLOOR PLAN- WING7-A AUDIO-VIDEO CAFETERIA FLOOR PLAN AUDIO-VIDEO. 28 Exhibit 1-0 GMP Book dated 2/23/21 The School Board of Baker County, Florida - New Baker County Elementary School GMPDocument, Log Number DIVISION01 011000 012100 012150 012300 012500 012900 013100 013200 013300 014000 0142:00. 015000 015500 017700 017800 018113 DIVISION02 020205. 023000 DIVISION03 030320 030341 033000 DIVISIONO 04 042000 042113 DIVISION 05 051200 052100 055300 054000 055000 Name Issue Date Issue Description PROJECT SPECIFICATIONS VOL.1&2 GENERAL REQUIREMENTS SUMMARY OF WORK ALLOW/ANCES THRESHOLD INSPECTION PLAN ALTERNATES SUBSTITUTIONS PROCEDURES: PAYMENT PROCEDURES PROJECT COORDINATION PROJECT MEETINGS SUBMITTALS: QUALITY REQUIREMENTS DEFINITIONS: ANDSTANDARDS TEMPORARY FACILITIES MATERIALS. AND EQUIPMENT CLOSEOUT PROCEDURES WARRANTIES: ANDI BONDS SUSTAINABLE DESIGN REQUIREMENTS EXISTING CONDITIONS DEMOLITION CONCRETE 12/16/2020, 100% CD's 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%.CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%0 CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S GEOTECHNICAL DATA (W/ ATTACHED REPORTS) CONCRETE WORK- GENERAL (CIVIL) PRECAST CONCRETE! STRUCTURES BUILDING CONCRETE WORK MASONRY UNITI MASONRY BRICK. MASONRY METALS STRUCTURAL: STEEL STEEL, JOIST METAL DECKING COLD FORMED METAL FRAMING METAL FABRICATIONS 29 Exhibit1- GMP Book dated 2/23/21 The School Board of Baker County, Florida - New Baker County Elementary School GMPDocument. Log Number 0551163 DIVISION 06 061000 .064000 064 4023 066 651 10 DIVISION07 071113 071326 072100 074113. 076200 07,8100 079200 079500 DIVISION 08 080500 081113 08: 1416 083113 083 333 33 08:4100 085113 087100 088000 DIVISION 09 09:29.00: 093000 095100 096500 096513 096533 096700 096816 Name Issue Date Issue Déscription 01/08/2021 ADDENDUM#1 12/16/2020 100% CD'S 12/16/2020 100%0 CD'S: 12/16/2020. 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%-CD'S 12/16/2020 100%CD'S 12/16/2020 100%C CD'S. 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%. CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S. 12/16/2020 100%0 CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S FIXED ALUMINUM- INDUSTRIALSTAIR. WOOD,PLASTICS, AND COMPOSITES ROUGH CARPENTRY PLASTICLAMINATE CLAD FIXED CABINETS SOLID SURFACE: FABRICATIONS MOISTURE PROTECTION BITUMINOUS DAMPROOFING SHEET MEMBRANE WATERPROOFING, BUILDING INSULATION PREFORMED WALL ANDI ROOF PANELS FLASHING & SHEETI METAL FIRESTOPPING JOINT SEALANTS EXPANSION CONTROL. OPENINGS DOOR: SCHEDULE HOLLOW. METAL: DOOR AND FRAMES FLUSH WOODI DOORS ACCESS DOORSA ANDI FRAMES OVERHEAD DOORS ALUMINUM ENTRANÇES, ANDSTOREFRONTS ALUMINUM WINDOWS DOOR HARDWARE, GLASS. AND GLAZING FINISHES GYPSUM DRYWALL TILE ACOUSTIÇAL CEILINGS RESILIENTTILE FLOORING RESILIENT WALL BASE/ ANDSTAIR TREADS ELECTROSTATIC DISCHARGE VINYLTILE SPECIAL COATING FOR CONCRETE CARPETING DECORATIVE PLASTICI LAMINATE PILASTERS ANDI WALL TREATMENTS 12/16/2020 100% CD'S 30 Exhibit1 1- GMP Book dated 2/23/21 The School Board of Baker County, Florida - New Baker County Elementary School GMP Document. Log Number 09.7100 099100 DIVISION 10 10.1000 101600 1026.00 102800 10441 16 105050 105310 109900 DIVISION1 11 111320 114000 116143. DIVISION13 130650 130651 130652 DIVISION21 210100 210517 210518 210523 210529 210553 211100 211119 211313 211316 DIVISION22 220100 220513 Name: ACOUSTICAL WALL PANELS PAINTING SPECIALTIES TOILET PARTITIONS CORNER GUARDS. TOILET AND BATH ACCESSORIES FIRE. EXTINGUISHERS,; CABINETS AND ACCESSORIES HEAVY DUTY: STEEL LOCKERS ALUMINUM. WALKWAY CANOPY SYSTEM MISCELLANEOUS: SPECIALTIES EQUIPMENT PROJECTION, SCREEN FOOD: SERVICE STAGE CURTAINS SPECIAL CONSTRUCTION- -N/A BULLET RESISTANT WOOD DOOR & FRAME ASSEMBLY BULLET RESISTANT: ACRYLIC GLAZING RECESSED DEAL TRAY WITH BULLETT TRAP GENERAL PROVISIONS: FORFIRE SUPPRESSION SLEEVES AND: SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING ESCUTCHEONS: FOR FIRE-SUPPRESSION PIPING GENERAL-DUTY VALVES FOR FIRE PROTECTION PIPING HANGERS: AND! SUPPORTS FOR FIRE: SUPPRESSION PIPING. AND DENTIFICATION: FORF FIRE- SUPPRESSION PIPING. ANDE EQUIPMENT FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING FIREI DEPARTMENT CONNECTIONS WET-PIPE. SPRINKLER. SYSTEMS. DRY-PIPE SPRINKLER. SYSTEMS PLUMIBNG Issue Date Issue Description: 12/16/2020 100% CD'S 12/16/2020 100%C CD'S 12/16/2020 100%.C CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% ÇD's 12/16/2020 100% CD'S 12/16/2020 100%. CD'S 01/15/2021 ADDENDUM #2 12/16/2020 100%C CD'S. 01/08/2021 ADDENDUM #1 12/16/2020 100%C CD'S 12/16/2020 100%0 CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020. 100%G CD'S. 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S MARKERBOARDS,; TACKBOARDS. ANDI DISPLAY. RAILS FIRE SUPPRESSION EQUIPMENT GENERAL PROVISIONS FOR PLUMBING COMMON MOTOR REQUIREMENTSI FOR PLUMBING EQUIPMENT 31 Exhibit1- - GMP Book dated 2/23/21 The School Board of Baker County, Florida = New Baker County Elementary School GMPDocument. Log Number 220516 220517 220518 220519 220523.12 220523.13 2205 23.14 220529 22054 48.13 220553 220593. 2207: 19.12 22.07/19.14 22071 19.15 221101 221116 221119 221123 221 1123,13 221126 221316 221319 221323 221344 221413 221423 223300 223400 22.4213.13 224213.16 2242:16.13. 224216.16 224223 224716 DIVISION 23 230100 230513 Name Issue Date Issue Description 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%0 CD'S 12/16/2020. 100%CD'S 12/16/2020 100% CD'S 12/16/2020: 100% CD'S 12/16/2020 100%0 CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S: 12/16/2020 100% CD'S 12/16/2020, 100%0 CD'S 12/16/2020 100% CD'S 01/15/2021 ADDENDUM# #2: 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%: CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S EXPANSION FITTINGS AND, LOOPS FOR PLUMBING PIPING. SLEEVES AND: SLEEVE SEALS FOR PLUMBING PIPING ESCUTCHEONS FOR PLUMBING PIPING METERS AND GAGES FORI PLUMBINGI PIPING BALL) VALVES FOR PLUMBING. PIPING! BUTTERFLY VALVES FOR PLUMBING PIPING CHECK VALVES FOR PLUMBING PIPING HANGERS ANDSUPPORTS FORI PLUMBING PIPING AND EQUIPMENT 12/16/2020 100%CD'S VIBRATION. CONTROLS FOR PLUMBING PIPING ANDE EQUIPMENT, IDENTIFICATION FOR PLUMBING PIPING. ANDI EQUIPMENT TESTING; ADJUSTING, ANDI BALANCING FOR PLUMBING INSULATION FORI DOMESTIC HOT-WATER PIPING INSULATION: FOR SANITARY, PIPING ANDJ DRAINS INSULATION FOR ADAI PLUMBING FIXTURES HORIZONTAL DIRECTIONAL DRILLING DOMESTIC WATER PIPING DOMESTIC WATER PIPING SPECIALTIES DOMESTIC WATER PUMPS DOMESTIC-WATERI PACKAGED- BOOSTER PUMPS FACILITY! LIQUEFED-PETROLEUMI GAS PIPING SANITARY: WASTE AND) VENT PIPING SANITARY WASTE PIPING SPECIALTIES SANITARY WASTE INTERCEPTORS. SEWAGE LIFT STATION' WITH SUBMERSIBLE PUMPS FACILITY/STORM DRAINAGE PIPING STORM DRAINAGE PIPING. SPECIALTIES ELECTRIC,; DOMESTIC-WATER HEATERS FUEL-FIRED, DOMESTIC-WATER: HEATERS COMMERCIAL WATER. CLOSETS COMMERCIAL URINALS COMMERCIAL LAVATORIES. COMMERCIAL SINKS COMMERCIAL SHOWERS PRESSURE WATER COOLERS HEATING, VENTILATION. & AIR CONDITIONING (HVAC) GENERAL. PROVISION FORI HVAC COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 32 Exhibit1-G GMP Book dated 2/23/21 The School Board of Baker County, Florida - New Baker County Elementary School GMP Document. Log Number 230517 230518 230529 23054 48.13 2305.53 230593 2307.13.11. 230713.13 230719.11 230719.16 23:2300 232923 233113.11 233113.12 233113.13 233300 233346 233416.11 233416.14. 233423.12 233423.13 233 343 33.13 233713.13 233713.23 233723 233900 23-4100 236200 23731 13.16. 23812 26.11 238126.12. 238166 238216.14 DIVISION25 250100 250528 Name Issue Date Issue Description 12/16/2020 100% CD'S" 12/16/2020 100%CD'S 12/16/2020. 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S: 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S. 12/16/2020 100%CD'S 12/16/2020 100%.CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S, 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020: 100% CD's 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S SLEEVES AND: SLEEVE SEALS FOR) HVAÇ PIPING: ESCUTCHEONS FOR HVACI PIPING HANGERS AND: SUPPORTS FORI HVACI PIPING ANDI EQUIPMENT VIBRATION CONTROLSI FOR HVAC IDENTIFIÇATION: FOR HVAC PIPING AND EQUIPMENT TESTING, ADJUSTING. AND BALANCING FOR HVAC INSULATION FOR INDOOR GENERAL HVACI DUCTS INSULATION FOR COMMERCIAL KITCHEN EXHAUST DUCTS INSULATION FOR CONDENSATE DRAIN PIPINGI INSULATION FORI REFRIGERANT PIPING REFRIGERANT. PIPING VARIABLE-FREQUENCY MOTOR CONTROLLERS METAL DUCTS: FOR GENERAL HVAC METAL DUCTS FOR COMMERCIAL KITCHEN EXHAUST METAL DUCTS FOR. LABORATORY EXHAUST AIRI DUCT ACCESSORIES FLEXIBLE DUCTS SQUARE IN-LINE CENTRIFUGAL FANS FILTERED: SUPPLY) CENTRIFUGAL FANS: CEILING-MOUNTED VENTILATORS CENTRIFUGAL ROOFVENTILATORS COMMERCIAL, AIR CURTAINS AIR DIFFUSERS REGISTERS AND GRILLES HVAC GRAVITYVENTILATORS LOUVERS AND' VENTS PARTICULATE. AIR. FILTRATION PACKAGED COMPRESSOR, AND CONDENSER UNITS INDOOR, SEMI-CUSTOM, AIR-HANDLING UNITS AIR-COOLED, SPLIT-SYSTEM, AIR-CONDITIONERS (5TONS AND AIR-COOLED, SPLIT-SYSTEM, AIR-CONDITIONERS (6: TONSA AND. VARIABLE REFRIGERANT VOLUME SYSTEMS ELECTRICRESSTANCE AIR COILS INTEGRATED AUTOMATION PATHWAYS. FOR CONTROL SYSTEMS SMALLER) LARGER) GENERAL PROVISIONS FOR INSTRUMENTATION, AND CONTROL 33 Exhibit 1- GMP Book dated 2/23/21 The School Board of Baker County, Florida - New Baker County Elementary School GMP Document. Log Number 250529 250910 250923.12 25 092 23.13 25 092 23.14 25 0923,16 250 09: 23.17 25:0923.19 250923.27 DIVISION 26 260100 260519 26.0523 260526 260529 260533 2605:36: 260544 260553 260 0573.13 260573.16 26 0573.19 26:0923 260943.23 260953 262213 262413 262416 262726 262813 262816 26291 13.03 26321 13.13 263 3600 26.4113: 264313 Name Issue Date Issue Description 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%-CD's: 12/16/2020 100%CD'S 12/16/2020 100%.CD'S: 12/16/2020 100%C CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020. 100%CD'S: 12/16/2020 100%CD'S 12/16/2020 100%. CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S. 12/16/2020 100% CD'S 12/16/2020: 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S HANGERS AND: SUPPORTS FOR CONTROLSYSTEMS INTEGRATION WITH EXISTING DDCS SYSTEM CONTROL DAMPER. ACCESSORIES ENERGY. METERS FLOW INSTRUMENTS GAS INSTRUMENTS LEVEL INSTRUMENTS MOISTURE INSTRUMENTS TEMPERATURE INSTRUMENTS ELECTRICAL GENERAL PROVISIONS FORI ELECTRICAL LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES CONTROLVOLTAGE ELECTRICAL POWER CABLES, GROUNDING ANDI BONDING FORI ELECTRICAL SYSTEMS HANGERS AND: SUPPORTS: FORE ELECTRICALSYSTEMS RACEWAYS. ANDI BOXES FOR ELECTRICALS SYSTEMS CABLE TRAYS FOR ELECTRICAL SYSTEMS SLEEVES ANDS SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING IDENTIFICATION FOR ELECTRICAL! SYSTEMS SHORT-CIRCUIT: STUDIES COORDINATION: STUDIES ARC-FLASH HAZARD ANALYSIS LIGHTING, CONTROL DEVICES RELAY-BASED LIGHTING CONTROLS ADDRESSABLE, FIRE- ALARM: SYSTEMS LOW-VOLTAGE DSTREVTONTHANSONMES SWITCHBOARDS PANELBOARDS WIRING DEVICES: FUSES ENCLOSED SWITCHES. AND CIRCUIT BREAKERS MANUAL ANDI MAGNETIC MOTOR CONTROLLERS DIESEL-ENGINE-I DRIVEN GENERATOR. SETS TRANSFER SWITCHES LIGHTNING PROTECTION FOR: STRUCTURES SURGE PROTECTION FORI LOW-VOLTAGE ELECTRICAL POWER CIRCUITS 34 Exhibit 1- GMP Book dated 2/23/21 The School Board of] Baker County, Florida - New Baker County Elementary School GMP Document. Log Number 265119 26561 13 265619 DIVISION 27 270526 270528 271100 271300 271500 2730.00 274100 DIVISION2 28 280513 280526 281300 282113 282319 DIVISION31 310220 310251 310252 313116 DIVISION: 32 320251 320252 320261 320293 323113 32.3119 DIVISION33 330266 330273 330275 Name LEDI INTERIOR LIGHTING LIGHTING POLES ANDS STANDARDS LED EXTERIOR LIGHTING COMMUNICATIONS Issue Date Issue Description 12/16/2020. 100% CD'S 12/16/2020 100%0 CD's 12/16/2020, 100%0 CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD's: 12/16/2020 100% CD'S 12/16/2020 100% CD'S. 12/16/2020 100% CD'S 12/16/2020 100%-CD'S: 12/16/2020 100%CD'S GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PATHWAYS FOR COMMUNICATIONS: SYSTEMS COMMUNICATIONS EQUIPMENT ROOM FITTINGS COMMUNICATIONS BACKBONE CABLING COMMUNICATIONS HORIZONTAL CABLING EMERGENCY COMMUNICATION: SYSTEM AUDIO/VIDEO SYSTEMS ELECTRONIC SAFETY & SECURITY CONDUCTORS: AND CABLES FORE ELECTRONIC SAFETY ANDSECURITY 12/16/2020 100% CD'S GROUNDING ANDI BONDING FOR ELECTRONIC SAFETY AND SECURITY 12/16/2020 100% CD'S ACCESS: ÇONTROL IP CAMERAS PMDEOSTORAGE: SERVER EARTHWORK EARTHWORK STABILIZED: SUBBASE. LIMEROCKI BASE COURSE TERMITE CONTROL EXTERIOR IMPROVEMENTS CONÇRETE CURBS, CURBS AND GUTTERS, ANDS SIDEW/ALKS ASPHALTIC CONRETE: PAVING. PAINTING TRAFFICS STRIPES AND MARKINGS SODDING, SEEDING AND MULCHING FOR' SITE: STABILIZATION CHAIN LINK FENCES. AND GATES DEÇORATIVE METAL FÈNCES AND GATE. UTILITIES WATER DISTRIBUTION SYSTEMS SANITARY. SEWERS. 12/16/2020, 100%. CD'S: 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020. 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020: 100% CD'S 12/16/2020 100%0 CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%0 CD'S 12/16/2020 100%0 CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD's STORM DRAINAGE CULVERTS AND: STRUCTURES 35 Exhibit1-GMP Book dated 2/23/21 The School Board of Baker County, Florida - New Baker County Elementary School GMP Document. Log Number 330293 330341 Name Issue Date Issue Description 12/16/2020 100% CD'S 12/16/2020 100% CD'S STORM WATER POLLUTION. PREVENTION PLAN (SWPPP). PRECAST CONCRETESTORM: DRAINAGE STRUCTURES 36 N 3 M a a 9 a 5 3 B 9 € E $ 1? 00 7 o ? $ 5 6 6 $ 80 ge 5e to