Baker Cowify PwbloSchoolw Sherrie Raulerson, Superintendent of Schools 270 South Boulevard East, Macclenny, Florida 32063 Telephone: (904)259-6251 www.bakerki2.org Fax: (904)259-1387 "Thez vision oft the Baker County School Board is to prepare individuals to be lifelong learners, self-sufficient and responsible citizens ofgood character." AGENDA SCHOOL BOARD WORK SESSION (Open to the Public) Monday, June 21,2021- -1 12:00 p.m. SUPPLEMENTAL MINUTE BOOK #49 PAGE: #22 District School Board Room (270 South Boulevard East, Macclenny, Florida) 12:00 p.m. Work Session on the New Kindergarten - Fifth Grade Elementary School. Baker County School Board Work Session (Monday, June 21, 2021)-1 Page 1 ofl Minute Book #3 39 Supplemental Minute Book #491 Page #22 "Preparing individuals to bel lifelong leamers, self-sufficient, and responsible citizens of good character" DISTRICT SCHOOL BOARDI MEMBERS Tiffany! Mclnarnay. Districti * Richard Dean Griffis, District2 * PaulaT.Barton, District3 * Charlie M. Burnett, II. District4 * Amanda Hodges, District5 AMERUALACCI/PQUALOmouwrhsmumow Baker County School Guaranteed Maximum Price June28,2021 BAKER COUNTY SCHOOL ADMINISTRATIONS 904.292.2645 m perry-mccall.com Perry-McCall O0G CONSIRICTININC: 6104 south gazebo park place I jacksonville, florida 32257 Icgc 017574 Exhibit1-G GMP Book dated 6/28/21 m June 28, 2021 The School Board of Baker County, Florida Ms. Sherrie Raulerson, Superintendent 392 South Blvd. Macclenny, Florida 32063 Re: Guaranteed Maximum Price Perry-McCall CONSTRUCTION/INC: JACKSONVILLE DAYTONAI BEACH CONSTRUCTION MANAGEMENT GENERAL CONTRACTING DESIGN/BUILD 19042 New Baker County Elementary School Dear Ms. Raulerson, Perry-McCall Construction, Inc. is pleased to present this Guaranteed Maximum Price ("GMP") proposal for Thirty-four Million, Seven Hundred Ten Thousand, One Hundred Thirteen Dollars $34,710,113.00) This proposal is based on the 100% construction documents prepared by Clemons Rutherford & Associates dated December 16, 2020 (and subsequent addendums and RFI's), and is further defined by the qualifications and clarifications contained herein. This proposal includes Alternate #1 (Bldg 700 wing) and Value Engineering as detailed herein. The project was publicly advertised and sealed competitive bids were received on June 1, 2021. Those bids have been reviewed for completeness, qualification, and adherence tot the construction documents. Where decided, those recommended trade contractor awards are identified int the estimate. A complete copy of all bids received and the tabulation of same will be proved under a the above referenced project in the amount of: separate cover. For simplicity, here is thei formula used to determine the GMP: 1. The originally drawn "Base Bid" that does not include Bldg. 700 (aka Alternate 1): $34,900,965 2. Minus the value engineering ("VE") items identified for the Base Bid: ($2,192,466) $2,096,596 ($94,982) $34,710,133 3. Plus Alternate 1 Bldg. 700: 4. Minus the VE for Alternate #1 Bldg. 700: 5. GMP Total: Approval of this proposal is time critical. Material inflation is increasing at an alarming rate. We anticipate this GMP will be presented for board approval on June 28th, and we will be ready to mobilize shortly thereafter. We look forward toi the successful completion of this important project. Perry-McCall Construction, Inc. A4 Exhibit1-GMP Book dated 6/28/21 m Perry-McCall CONSTRUCTIONINC: JACKSONVILLE DAYTONA BEACH CONSTRUCTION GENERAL CONTRACTING MANAGEMENT DESIGN/BUILD GMP TABLE OF CONTENTS Estimate Summary, Base Scope.. General Conditions Detail.. GMP Assumptions and Qualifications. GMP Value Engineering Detailed Descriptions. pages 1-2 -page: 3 -pages4 4-5 -pages 6-12 -pages 13-17 -pages1 18-31 pages 32-42 pages43-51 Estimate Summary, Base Scope plus Alt#1 with Value Engineering. Document Log. Drawing Review Log. Project Schedule. Exhibit1-GMP Book dated 6/28/21 BAKER COUNTY SCHOOL BOARD MACCLENNY mm Perry-McCall RLCTION,INC "C" ELEMENTARY SCHOOL base scope estimate summary scope 100000 pckg Description Total Amount base project scope as designed 014529 MATERIALS TESTING 019100 COMMISSIONING SERVICES 030000 CONCRETE 040000 MASONRY 31,160 27,250 1,830,090 4,051,350 1,202,733 1,797,178 69,484 262,851 48,548 2,185,000 63,423 622,000 6,750 298,390 962,250 271,100 692,611 246,599 310,263 131,126 141,000 11,740 651,149 14,553 284,800 1,240,000 2,675,570 3,111,339 6,213,945 13,420 118,309 280,401 29,866,382 051200 MISC. & STRUCTURAL STEEL 054400 LIGHT GAGE TRUSSES ANDI ROOF DECK 061000 ROUGH CARPENTRY 064000 PLAM CABINETS, PILASTERS & WALL TREATMENTS 072100 BUILDING INSULATION - SPRAY APPLIED INSULATION 074113 PREFORMED WALL AND ROOF PANELS 079200 WATERPROOFING AND: SEALANTS 083333 OVERHEAD DOORS 081000 DOORS, FRAMES & HARDWARE (FURNISH & INSTALL) 084000 GLASS, ENTRANCES & STOREFRONTS, AND WINDOWS 092900 GYPSUM DRYWALL & FRAMING 095100 ACOUSTICAL CEILINGS & WALL PANELS 096000 FLOORING 099100 PAINTING 100000 SPECIALTY TRADES 101440 SIGNAGE 105310 ALUMINUM WALKWAY CANOPY SYSTEM 109900 WINDOW BLINDS 114000 FOOD: SERVICE EQUIPMENT 116143 STAGE CURTAINS 210000 FIRE SPRINKLER 220000 PLUMBING 230000 HVAC & CONTROLS 260000 ELECTRICAL & LOW VOLTAGE SYSTEMS 310000 SITEWORK & UTILITIES 313116 TERMITE CONTROL 320293 SODDING, SEEDING, AND MULCHING 323100 FENCES & GATES 100000 base project scope as designed Baker County Elementary School v05 1 Exhibit1 1-0 GMP Book dated 6/28/21 BAKER COUNTY SCHOOL BOARD MACCLENNY ELEMENTARY mm Perry-McCall "C" SCHOOL base scope estimate summary Totals Description Amount Totals bid package subtotal sub default insurance sub default insurance subtotal bldrs risk commercial general liability p&pbond preconstruction 29,866,382 30,237,956 371,574 371,574 69,109 318,197 170,974 558,280 81,025 1,546,957 1,627,982 972,960 972,960 1,503,788 1,503,787 bonds & insurances subtotal general conditions (base scope) general conditions subtotal construction contingency design contingency owner contingency contingencies subtotal 30,796,236 32,424,218 33,397,178 p&o escalation building permit fees subtotal Total 34,900,965 34,900,965 Baker County Elementary School v05 2 Exhibit1-G GMP Book dated 6/28/21 BAKER COUNTY SCHOOL BOARD estimate summary with allocated markups MACCLENNY ELEMENTARY mm Perry-McCall SIRUCTIONINC. "C" SCHOOL scope 100000 300000 va Description Total Amount 34,900,965 2,096,596 Not Alt#1 Approved Accepted base project scope as designed potential alternates as designed alt 001 ALTERNATE #1: Additive cost for Classroom Wing 700 Potential Accepted Maybe 135,323 135,323 30,275 30,275 87,660 87,660 68,890 68,890 44,992 44,992 224,427 224.427 37,775 37,775 20,554 76,538 76,538 40,802 40,802 33,475 33,475 8,733 8,733 73,105 73,105 5,555 5,555 99,992 99,992 18,887 18,887 186,106 99,570 58,609 58,609 31,109 31.109 161,215 8,888 8,888 72,217 72.217 27,776 27.776 16,665 16,665 216,183 216.183 115,381 115,381 16,665 16,665 76,883 76,883 24,443 24,443 34,254 87,376 87,376 250,000 250.000 100,000 100,000 103,842 103,842 Sub-Totals 2,694,165 2,192.466 Grand Total Alt.#1 Base Bid Buidling #700 Grand' Total VE! $2,192,466 $94,982 $2,287,448 VE# Description of VE VE01.1 Reimbursable GC's VE#01.2 Commissioning: Delete Commissioning requirements Concrete & Masonry: Use Masonry bond beamsi inl lieud of cast-in-place concrete tieb beams at VE#03.1 perimeter, exterior walls (change 8" wide by 16"d deep cast-in-place concrete beam to masonry lintel blocks). Structurale engineert to approve designo changes. Misc. Steel: Delete steel anglesi int then mezzanined corridors per4 4/A4.2. Addi lightg gauger metal VE#05.1 studsi inli lieu ofs steela anglesf forf fallp protection. Change alll ladderlrails top primed steeli inl lieud of VE#05.2 Pre-Engineered MetalT Trusses: Use 120 GaugeE Bent Metali inli lieud of 1/4" bent plate ate eaves, VE#07.1 Roofing: Use Alternate roof & soffitp panel manufacturers asf further describedi inth the GMP. VE#07.2 Roofing: Uset bentp plate atd dripe edgei inp place ofw woodr nailers. VE#09.1 Drywall Removea abusive GWBI below8 8' andr replace withs standard GWB. VE#09.2 Flooring: Change! LVT flooringf from Tarkett Contour toT Tarkett IDL Latitudes VE#09.3 Flooring: Change carpet from Tarkett Blocaset to any oft thef followings stylesf from Tarkett (Resonate, Capture, Substance, Vellim, Bindery or Stamp). VE#09.4 Flooring: UseF Resinous Flooring. NotT Tilein ina allb bathroomf floors andb base. (Dex-O-Tex Décor-Flor Broadcast w/decorative colorg quartz, 1/8") VE#09.5 Flooring: Use Resinous Flooring, Not Quarry Tilei int thek kitchen. (Dex-O-Tex Tek-Crete SLB, 1/8") VE#11.1 Food Service Equipment: use alternate manufacturers asf further describedi in GMP. VE#22.1 Plumbing: LPC Gasl Tank by owner vendor, not contractor. VE#22.2 Plumbing: use CPVCI inlieud ofo copper piping. VE#22.3 Plumbing: Use Alternate Plumbing Manufactures asf further describedi int the GMP. VE#23.1 HVAC: Delete controls system andu useV Wi-Fic capable individualt thermostats. VE#23.2 HVAC: Alternate classroom design providing two classrooms peru uniti instead ofc one unit per classroom, size unita accordingly. VE#23.3 HVAC: Use alternate manufacturers fort theh heatp pumps & MAUS systems. VE#23.4 HVAC: Uses snaplock round ducti inl lieu ofr rectangular & spiral duct. VE#23.5 HVAC: Use ductboard inli lieud ofg galvanized duct. VE#26.1 Electrical: Deduct Gear Study VE#26.2 Electrical: Deduct too delete lightning protection system. VE#26.3 Electrical: Use! MCf forli lighting&f firea alarm. VE#26.4 Electrical: VE Lighting 3,111 16.221 8,888 4.201 7,222 1.444 4.213 3.739 444 7.777 2,222 7,980 4.000 5,000 15.187 aluminum. gable ends, ande expansionj joints. 20.554 186.106 99,570 161.215 VE#26.5 Electrical:. Audio-visuals system changes (interactive monitors arec ownerf furnish, owneri install) VE#26.6 Electrical: Access controld changes (only lobbyi interior doora ando doort to covered play remaining) VE#26.7 Doors: Delete Door Hardwarer requirements where cardr readers werec deletedf from doors per hardware schedulei ins spec (16 doors deleted, leaving2) VE#26.8 Electrical: CCTV changes (all cameras are ownerf furnished; interior cameras owneri installed) VE#26.9 Electrical: Remove plug controllersf frome electricals system VE#31.1 Sitework: Storm system- UseH HDP pipingi in lieud ofF RCP. VE#32.1 Landscaping: Grass Seeding (Bahia)i inli lieud ofs Sod, Entire Site, except fore erosion control &f front areas VE#40.1 Owner Tax Savings (ODPO) VE#40.2 Owner Tax Savings (ODPO), Additionally guaranteedb byF Perry-McCall VE#40.3 Contingency Reduction 3,333 34.254 501.699 94.982 2,789,147 Original Base Bid $34,900,965 $2,096,596 $36,997,561 Revised Total $32,708,499 $2,001,614 $34,710,113 Baker County Elementary School v05 3 Exhibit1-GMP Book dated 6/28/21 Construction Manager's General Conditions mm Perry-McCall CONSTRUCTION.INC: Macclenny "C" School, Baker County Date: June 28, 2021 CODE Staff- Project Duration 1-012 Superintendent 1-013 Asst. Supt. (1) 1-013 Asst. Supt. (2) 1-026 Project Executive 1-010 Sr. Project Manager 1-011 Asst. PM Administrative. Assistant- Office ODP help MEPFP Coordinator Administrative. Assistant Reimbursable GC's 1-016 Generall Labor- Cleanup #1 1-016 General Labor- -Cleanup #2 1-017 Living Expense Staff Closeout Punch 1-013 Assistant Superintendent 1-011 Assistant Project Manager 1-016 BIM Coordinator- Consultant 1-016 General Labor Travel Expenses 1-015 Superintendent Truck - Company Owned 1-515 Superintendent Gas 1-015 Asst. Supt." Truck- Allowance 1-515 Asst. Superintendent Gas 1-014 Project Executive's Travel Expense 1-014 Project Manager Truck- Allowance 1-515 Project Manager Gas 1-515 Asst. Project Manager Gas 1-516 Job Related TravelE Expense Field Engineering 1-021 Layout/E Engineer supplies 1-024 Survey Safety First Aid 1-019 Safety Consultant Visits 1-020 AED- Automated External Defibrillator 1-513 First Aids supplies 1-594 Safety Equipment 1-594 Hardhats forJ Jobsite Staff, A/E, Owner Submittals 1-304 Overall Project Construction: Schedule 1-304 Progress Schedules and Reports 1-301 Shop Drawings, Product Data & Samples 1-305 Construction Photographs 1-305 Digital Camera Temporary Utilities 1-504 Temporarye electricity-s setup 1-505 Temporarye electricity- -I monthly 1-505 Temporary electricity- generator 1-501 Temporary Telephone- installation 1-502 Temporary7 Telephone- monthly 1-509 Temporary' Water setup 1-510 Temporary Water monthly 1-503 Temporary Toilets (6/ea) 1-508 Temporary! Heat Temporary Gas 1-586 Permenant Power 1-507 Early HVAC start-up Temporary Construction 1-591 Employee Background Checks 16.00months 69.52 wks Mat 133538sf TOTAL Includes Hundat5,Taxc 294,350 157,325 294,350 130,355 8,120 121,800 57,536 57.536 8,990 Enter months and square footage above, alli items on thes spreadsheet iny yellow will: automatically change. Labor DESCRIPTION QTY UNIT Unit LABOR Unit MATERIALS SUB Cost No! Burden Cost NoTax BID 70.00 wks 2,900 62.00 wks 1,750 wks 1,750 wks 3,300 70.00 wks 2,900 62.00 wks 1,450 7.00 wks 800 wks 2,200 70.00 wks 1,200 62.00 wks 640 62.00 wks 640 16.00 mo 4.00 wks 1,550 wks 1,450 wks wks 520 16.00 mo 16.00 mo 16.00 mo 16.00 mo mo 16.00 mo 16.00 mo 16.00 mo mo 16.00 mo 1.00 Is 16.00 mo 1.00 Is 16.00 mo 1.00 Is 30.00 ea mo mo Is 16.00 mo Is 1.00 Is 16.00 mo 4.00 mo Is mo 1.00 Is mo 96.00 mo mo Is 4.00 mo Is 15.00 ea 203,000 108,500 203,000 89,900 5,600 84.000 39,680 39,680 6,200 3,200 500 450 500 450 200 500 450 450 200 100 8,000 7,200 8,000 7,200 8,000 7,200 7,200 1,600 8,560 7,704 8,560 7,704 8,560 7,704 7,704 1,712 10,000 8,000 1,500 428 2,140 1,445 10,000 500 1,500 400 2,000 1,350 25 2,000 45 25 50 2,500 125 250 2,000 750 1,500 150 250 500 400 125 500 500 12,500 85 2,000 2,000 12,000 6,000 500 12,500 12,000 50,000 1,275 2,140 2,140 12,840 6,420 13,035 12,840 53,500 1,364 4 13,354 Exhibit 1. - GMP Book dated 6/28/21 mm Perry-McCall CONSTRUCTION.INC Macclenny" "C"S School, Baker County Date: June 28, 2021 CODE 1-591 Employee Badges 1-303 Drawing Reproduction (for construction) 1-520 Topping Out Party 1-591 Protected Pedestrian Walkways 1-580 Construction. Area Fence 1-580 Temporary Fence Maintenance 1-581 Temporary Site Barriers 1-581 Temporary Signage 1-592 Project Identification. /Signs 1-522 Ice Water & Cups 1-305 Construction! Photographs- Drone 1-305 Construction Photographs- Webcam 1-521 Radio Communication- J Jobsite Radios 1-522 Fire Extinguishers 1-523 Fire Extinguisher Stands 1-581 Light) Dewatering 1-524 Small Tools 1-524 Small" Tools Tooll Box 1-582 Construction! Entrances 1-634 Miscellaneous Equipment Rental 1-634 Miscellaneous Equipment Rental -Fuel 1-583 Tree Protection 1-526 Trash Hauling & Dump! Fees Field Office 1-560 Oftice Trailer (12'x60) 1-561 Setup/ 7Takedown' Trailers 1-561 Oftice Steps/ /Deck 1-562 Temporary Holding Tank (office trailer toilet) 1-563 Temporary Electric forJ Jobsite Office 1-563 Temporary Water for. Jobsite Office 1-511 Jobsite Offices supplies 1-512 Express Mail 1-601 Jobsite Office Furniture- Per Office 1-601 Jobsite Oftice Furniture- Conference Room 1-601 Computers, Printer & Software 1-602 PMS Software- BIM360 1-601 Tablet 1-601 Cell Phones 1-602 Copy Machine 1-576 Storage Trailer 8x40' 1-561 Delivery/Pickup Facility Start-up & Contract Closeout 1-529 As-Built] Drawings 1-531 Warranties & Closeout Documents 1-530 Punchlist 1-530 Punchlist Cart 1-528 Final Cleaning. Building SF 1-528 Final Cleaning - Glass SF Total 16.00months 69.52 wks Mat 20 500 6 25 500 100 800 100 1,250 100 100 120 100 120 90 250 2,000 500 200 450 600 250 100 50 50 1,500 500 800 2,500 120 1,000 65 1,000 100 90 133538sf TOTAL Includes 2,675 2,500 5,136 1,873 500 535 1,001 1.712 1,338 1,458 1,330 4,280 2,140 3,500 8,560 3,424 67,410 10,272 5,000 2,500 4,280 1,712 856 1,605 1,070 856 2,675 8,988 2,140 4,312 1,070 1,498 193 2,000 2,500 3,400 1,070 60,012 3,215 1,546,957 Enter months ands square footage above, alli items ont thes spreadsheet iny yellow will: automatically change. Labor ea 5.00 sets 1.00 Is Is 800.00 If 70.00 wks 1.00 Is 1.00 Is 1.00 Is 100 16.00 mo 1.00 Is mo mo 12.00 ea 10 12.00 ea 10 mo 16.00 mo 1.00 Is 1.00 Is 16.00 mo 16.00 mo Is 140.00 pulls 16.00 mo 2.00 Is 1.00 Is 16.00 mo 16.00 mo mo 16.00 mo 1.00 Is 2.00 ea 1.00 ea 1.00 Is 70.00 wks 2.00 Is 62.00 mo 1.00 Is 14.00 mo 2.00 ea 1.00 Is 1.00 Is 1.00 Is 2,000 1.00 Is 133,538.00 sf 20,031.00 sf DESCRIPTION QTY UNIT Unit LABOR Unit MATERIALS SUB Cost NoB Burden Cost NoTax BID Harde(5IaY) 2,500 500 500 2,500 4,800 1,750 500 800 1,600 1,250 1,200 1,080 4,000 2,000 8,000 3,200 63,000 9,600 4,000 1,600 800 1,500 1,000 800 2,500 8,400 2,000 4,030 1,000 1,400 180 1,000 3,500 2,000 2,500 2,500 2,000 2,500 500 2,000 1,000 0 0 781,900 1,000 56,086 3,005 338,506 5 Exhibit1-G GMP Book dated 6/28/21 m Perry-McCall CONSTRUCTION,INC: GMP Assumptions and Qualifications This Guaranteed Maximum Price ("GMP") includes constructing a new elementary school. The first phase will include areas 800 (cafetorium), 100 (administration), 200 (media), 300 (central corridor), 400 (classrooms and covered play), 500 (classrooms), 600 (classrooms), plus 700 (aka "Alternate #1" classrooms) has been included as an additive alternate to this GMP. Alternate #2 (aka added walkway canopy per A9.1)HAS NOT been approved, so itl IS NOT part ofthis GMP. Further, Alternate #3 (aka WiFi access door control) IS NOT part ofthis GMP. The cost for all associated earthwork, site utilities, This GMP is based on the Construction Documents (listed/dated on the GMP Document Log within this GMP) prepared by Clemons, Rutherford and Associates Inc. dated December 16, 2020, addenda 1-4, preconstruction RFI responses, the Geotechnical Engineering Study Report prepared by Meskel Engineering & Consulting, Inc. dated March 11, 2020 and the Addendum Report dated January 27, 2021 This GMP Proposal is valid until June 28, 2021. After June 28, 2021, there will be price increases. The and site improvements is included in this GMP. and the qualifications below. increases are not quantifiable at this time. Division 01 - General Conditions 1. Schedule: The estimate assumes an overall construction duration of 16 months and three weeks to project completion, with an anticipated start date of] July 6, 2021.. Anticipated construction 2. Construction will be accomplished during normal working hours which will include various 3. AC Construction Manager's Contingency is included to cover unforeseen conditions, minor discrepancies ini the construction documents, unexpected events in the construction process and schedule, and preconstruction oversights. The estimate does not include separate owner or architect contingencies. Construction Manager's Contingency shall be reduced by fifty (50%) percent via completion is November 28, 2022. See detailed schedule attached. activities causing loud noises. deductive change order six (6) months prior to final completion. 4. The cost of aj performance and payment bond is included. 6 GMPAsumplon/Qulilatbo/Calhatont Exhibit1-G GMP Book dated 6/28/21 5. Builder's risk insurance is included and provides protection toj property that is damaged during the course of construction, in transit to the job site or temporarily stored offsite at a designated property. 6. General liability insurance is included and provides protection for injuries or damages caused to a third party that is not covered by automobile or professional liability. Workers comp, automobile, 7. Subcontractor default insurance is included and mitigates the Owner and Construction Manager's risk ofloss, through the statute of repose period, for subcontractors who fail to meet the terms of 8. No costs have been included for permits (including building permits and Right of Way permits) of 9. No allowances are included for any changes that may result from the final reviews, approvals or 10. We assume all permitting, including but not limited to, SJRWMD, DEP, ACOE, DOT, and all other 11. Wel have included an allowance for material testing for the following: asphalt, concrete, masonry, 12. No costs for threshold inspection fees have been included in this GMP (this cost is carried by the 13. This GMP assumes that the water service, as noted on C701, will bei installed prior to the Construction Manager installing the water line. The Construction Manager does not take and professional liability insurance costs are incorporated into the GMP. their subcontract, any kind, impact fees, or utility connection charges. permitting by a required regulatory. related agencies has been approved. steel & soils testing. Architect). responsibility for delays caused by third party entities. 14. This GMP assumes permanent power will be brought to the site prior to the Construction Manager needing permanent power. The Construction Manager does not take responsibility for delays caused 15. No special provisions have been included for sustainable design or construction certifications. 16. It is expressly stated that there could be labor and material impacts as a result ofCOVID-19 and these impacts are beyond the Construction Manager's reasonable control and are not foreseeable by the Construction Manager at the time of executing this GMP. If faced with detrimental impacts due to COVID-19 during the performance of this Project, the Construction Manager will mitigate the resulting schedule and monetary impacts. The Construction Manager shall use the Construction Manager's Contingency in the event cost increases are encountered by the Construction Manager. The Construction Manager may be granted an extension of time iflabor or material shortages are proven toi impact the construction schedule. Notwithstanding any provision contained in this document or any documents or communications related hereto, whether express, implied or conditional, the GMP shall never be increased as ai result of labor nor material impacts as ai result ofCOVID-19. by third party entities. 7 GMP. Asumplons/Qualliatins/Charliation: Exhibit1 - GMP Book dated 6/28/21 17.A detailed estimate of general conditions costs is included as required under Attachment C. Upon approval ofsame, general conditions will convert tol lump sum and bel billed: in equal monthly amounts. Division 01 - Allowances 1. Brick veneer: $400 per thousand. The specifications do not call out brick type. Division 02 - Existing Conditions 2. Hazardous materials survey, removal and mitigation is not included. Division 03 - Concrete 1. No moisture mitigation is included. Ifneeded, the expense for moisture mitigation will be drawn from Construction Manager's Contingency. 2. See VE list for alternative concrete solutions. Division 04 - Masonry 1.1 Brick veneer included as standard, modular size. 3. See VE list for alternative masonry solutions. 2. Brick veneer allowance: $400 per thousand. The specifications do not call out brick type. Division 05 - Steel 1. Steel angle rails are located at both sides of the hall in the: mezzanines. We assume all the locations 2. Price does not include 16-guage top cord minimum per note 7/S0.1. We will provide a sealed letter ofengineering deck attachment method to meet the project design and wind loads as done on Kate Smith and Hamilton Elementary Schools. Also, we assume hips, ridges, and valleys to be 12Ga bent where steel angle rails are depicted (4/A4.2) have no gypsum sheathing. plate. 3. See VE list for alternative steel/truss solutions. Division 07 - Thermal and Moisture Protection 1. Spray-applied fireproofing is not required, nori included in the GMP. 2. The basis of design roof system included as. Peterson Tite-Lok Plus Kynar standing seam metal roof over high temperature peel & stick underlayment over two layers of2.6" polyisocyanurate insulation. 3. See VE list for alternative roof panel system. 8 GMP Asumptons/Qulfiatons/Clarifiations Exhibit 1- GMP Book dated 6/28/21 4. Roofs system includes the specified 20-year manufacturer's warranty. 5. Roofs system includes a two-year Contractor's Workmanship Warranty. Division 08 - Openings 1. Exterior windows are included with non-impact rated glazing. 2. Overhead coiling doors are Cornell ESD20. Division 09 - Finishes metal studs. 1. Framing ofhard ceilings and soffits using Armstrong Drywall Grid System in lieu ofc conventional 2. Hard tile is not anticipated at any walls. 3. See VE list for alternative flooring products. Division 10 - Specialties 1.1 Exterior lettering at the main entrance to be cast aluminum. 2. Street sign: Daktronics Red Monochrome 44"x81"x5" 3. Operable partitions are not included. anticipated or included. Division 11 - Equipment 4. New walkway covers included as clear anodized aluminum finish. No veneer/column wraps are 1. Only the appliances specifically indicated in the specification manual to be CFCI and are included. 2. Exterior playground recreation equipment is not included. 4. Desks, chairs, tables, and loose furniture is not included. 3. Only the site furnishing specifically called for CFCI in the plans are included. 5. Food service equipment: Item #36 (mixer) is a floor model, sO item #35 (mixer stand) is not required 6. Food service equipment: Item #14, #33, and #38 are to be supplied with epoxy coated shelving in and is therefore excluded. lieu of chrome (chrome is not available). 7. See VE list for food service equipment alternative manufacturers. 9 GMP Astumplons/Qualliations/Charlations Exhibit 1- GMP Book dated 6/28/21 Division 12-F Furnishings 1. Tables, desks, chairs, and other movable furniture is not included. Division 21 - Fire Suppression 1. A wet-pipe fire sprinkler system is included throughout conditioned space and mezzanines. 2. A dry-pipe fire sprinkler system is included at loading dock. 3. No: fire protection is included at the covered play area, canopies, or attics. 4. A fire-water booster pump is not included. We assume there will be sufficient water pressure, soa booster pump nor holding tank will not be necessary. 5. Signing and sealing of fire protection shop drawings is not included. Division 22 - Plumbing fittings are typeLcopper. 1. The sanitary, waste & vent system is PVC schedule 40 solid core. Domestic water piping and 2. See VE list for alternative plumbing solutions. Division 23 - HVAC 1. See VE list for alternative HVAC system solutions. Division 26-E Electrical 1.1 Hikvision cameras are currently on a government blacklist. This GMP includes Hanwah/Samsung equipment in lieu ofHikvision. 2. See VE list for alternative electrical and low voltage solutions. Division 31 - Earthwork 1. The GMP assumes unsuitable soils encountered onsite will be moved to green areas onsite. This GMP does not include an allowance for removal and replacement ofunsuitable material. If necessary, removal of unsuitable soils will cost will be calculated per $12.50/CY -1 truck measure. Clean import fill to replace the unsuitable soils (ifnecessary) will be $12.50/CY. 2. Nor rock excavation requiring more than standard machinery, or hauling is included. 3. Heavy duty and standard duty asphalt paving is included where indicated. The standard duty 4. Aluminum canopy footings are assumed to be 3'x3'x3 until delegated design is complete. pavement willl be installed in two 1" lifts to meet FDOT standards. 10 Exhibit1 1-G GMP Book dated 6/28/21 GPAsumplons/Quliatom/Cariliaiont 5. The geotechnical report shows small potential for subterranean clays and karst formations (limerock chimneys or sinkholes). There is no way to accurately estimate the impact this will have. Itis assumed that any unsuitable soils encountered will be able to be re-used on sitei in green areas. Ifnot, the unit rates above would apply. Boulders or other underground issues are not included. GMP is 6. The addendum Geotechnical Report dated January 27, 2021 requires settlement plates to bei installed for monitoring settlement during the import fill operation. This GMP does not include costs associated with delays that could occur due to settlement issues. Settlement plates and monitoring is assuming stripping the site up to 9" in depth. included. 7. See VE list for alternative sitework solutions. Division 32 - Exterior Improvements 1. Sodding areas have been included per C: 301. All sod included is figured as Bahia. The civil drawings call for centipede, but centipede will not grow in this area; especially without irrigation. No other plantings or irrigation are included. 2. See VE list for alternative sodding solutions. 3. Fencing around ponds and mechanical equipment pads: galvanized. 4. Aluminum fencing within this GMP includes Antebellum Manufacturing in lieu ofMerchants 5. We have included a 4" salt and pepper well for temporary water. This can be left for the Owner's use Metals. upon completion of the project. General Exclusions 1. Inspection Fees (covered under BCSD's agreement with NEFEC), Environmental Fees (architect has the wetland mitigation cost covered), Impact Fees (BCSD to coordinate with the City), DOT Fees (covered under architect's fees), and Meter Fees (BCSD to coordinate with the City); 2. Initial surveys in addition to what has been included in the Construction Documents (survey controls are included in the GMP); 3. Jobsite trailers for anyone other than the Construction Manager; 4. Dewatering for extreme weather conditions, including hurricanes; 5. Any Environment Insurance coverage besides Contractor's Pollution Insurance; . - Weather-related builders risk claim deductibles; tests, traffic studies, tree and lot surveys; 7. Environmental surveys (completed by BCSD), soil borings (completed by BCSD), infiltration 8. Offsite utility work, except as specifically noted on plans; 11 GMPAsumplom/Qulletb/Callatont Exhibit 1-G GMP Book dated 6/28/21 9. Site electric primary lines, transformers, meters, or oversight oft the utility company, including ordering ofa any ofthese items (BCSD, as the client to FPL, willl have to make contact and coordinate with FPL. Construction and design team to assist BCSD in gathering necessary info to make application to. FPL for new utility services); 10. Hazardous waste removal or contaminated soil removal; 12. Cost of easements and right-of-ways for utilities; 11. State fire marshal plan review fees or inspection fees (cost included in architect's cost); 13. Permanent utility charges, deposits or costs (gas, power, phone, water, etc.); 14. Grassing or landscape maintenance; 15. Land cost; 16. Relocation cost; 17.N Mockups; 18. Development fees; 19. Owner or designer contingencies; 20. Furnishing, fixtures & equipment; 21. Design fees. 12 Exhibit 1- GMP Book dated 6/28/21 Note: Value Engineering is a deviation from the plans and specifications and is used to help projects meet budgets. The items in these detailed descriptions are meant to educate BCSD on whati is included (and noti included) in this GMP. m Perry-McCall CONSTRUCTION,INC: GMP Value imgimeringAltermatives Detailed Descriptions Division 01 - General Conditions 1. VE 01.1 - Reimbursable GC's: The contract between Owner and Construction Manager dated September 8, 2020 defines the Construction Manager's General Conditions as lump sum (in lieu of reimbursable). As such, this VE01.1 credits the Owner for an administrative assistant(s) that will not longer bei needed because the Construction Manager will not be responsible to compile documentation that would have been required for reimbursable General Conditions (because the General Conditions are now lump sum). 2. VE01.2-Delete commissioning from the Construction Manager's scope ofv work. Division 03 - Concrete 1. VE03.1 -1 Use Masonry bond beams in lieu of cast-in-place concrete tie beams at perimeter, exterior walls (change 8" wide by 16" deep cast-in-place concrete beam to masonry lintel blocks). Structural engineer to approve design changes. Division 04 - Masonry 1. VE03.1 - Use Masonry bond beams in lieu of cast-in-place concrete tie beams at perimeter, exterior walls (change 8" wide by 16" deep cast-in-place concrete beam to masonry lintel blocks). Structural engineer to approve design changes. Division 05 - Steel 1. VE05.1- -I Misc. Steel: Guard rails & ladders at mezzanines above corridors: Delete steel angles in the mezzanine corridors per 4/A4.2. Add light gauge metal studs in lieu ofs steel angles for fall protection at the corridors. Change all ladder/rails to primed steel in lieu of aluminum. 2. VE052-Pre-Enginered Metal Trusses: Use 12 Gauge Bent Metal in lieu of 1/4" bent plate at eaves, gable ends, and expansion joints. 13 GMP Value. Alternates Exhibit1 1- GMP Book dated 6/28/21 Division 07 - Thermal and Moisture Protection 1. VE C 07.1 -1 Use Peterson Roof Panels Snap Clad with Galvalume in lieu of Peterson Tite-Loc Plus roofand soffit system. VE07.1 includes the specified 20-year manufacturer's warranty. 2. VE07.2- Use bent plate at drip edge in lieu ofwood nailers. Division 08 - Openings 1. VE26.7 Delete door hardware requirements where card readers were deleted from doors originally planned for access control per the hardware schedule (as quantified in the specification manual). See VE: 26.61 for further clarification on the access control VE. Division 09 - Finishes 1. VE09.1 -1 intentionally omitted 2. VE09.2-1 Use alternative flooring products - Change LVT flooring from Tarkett Contour to Tarkett 3. VE 09.3- Use alternative flooring products - Change carpet from Tarkett Blocase to any oft the following styles from Tarkett (Resonate, Capture, Substance, Vellim, Bindery or Stamp). 4. VE 09.4- - Use alternative flooring products - Use Resinous Flooring (Dex-O-Tex Décor-Flor Broadcast w/decorative color quartz, 1/8") in lieu of Porcelain Tile for all bathroom floors and base. 5. VE 09.5 - Use alternative flooring products - Use Resinous Flooring (Dex-O-Tex Tek-Crete SLB, IDLatitudes. 1/8") in lieu of Quarry Tile for the kitchen floors and base. Division 11 - Food Service Equipment 1. VE11.1-U Use alternate kitchen equipment manufacturers - see below with associated item identification code: a. Accutemp in lieu ofl Market Forge and Groen (K-24 and K-25) (Steamer & Braising Pan) b. Amerikooler inl lieu ofThermokool (Walk-in Cooler & Freezer) (K4 & K5) Berkel in lieu of] Hobart (Auto slicer) (K15) d. Continental in lieu ofTraulsen (Refrigerators & Heated Cabinet) (K14, K33, K38 & K39) e. Duke in lieu of Blodgett for the convection oven (K21) Electrolux in lieu of] Robot Coupe (Food Processor) (K32) g. Quantum shelving in lieu pf Metro for Item K-8 (Dry Storage shelving) h. Vulcan in lieu ofF Rational for the Combi Oven (K26) 14 Exhibit 1- GMP Book dated 6/28/21 GMP Value. Alternates Division 22 - Plumbing furnish/contractor install. 1. VE22.1-LP Gas Tank (and gas) to be owner furnish/owner install in lieu of contractor 2. VE22.2-L Use CPVC. in lieu of copper piping. Final connection to toilets to remain copper. 3. VE22.3 - Use alternate plumbing fixture manufactures - see below: a. P101-Toilet, Flush Valve (V-151M) change from Sloan 113-1.28 to Zurn Z6000 b. P102-Toilet, Flush Valve (V-151M) change from Sloan 113-1.28 to Zurn Z6000 P251-Urinal, Flush Valve (V-251M) change from Sloan Weus 1000.1001-0.13 to Zurn Z6003 d. P403-Lavatory, Faucet (F403 change from Chicago 2200-4E280SABCP to Zurn Z7440-XL P405-Lavatory, Faucet (F411 change from Chicago 807-E12-665PAB to Zurn Z86300-XL - P407-Lavatory, Faucet (F411 change from Chicago 807-E12-665PAB to Zurn 286300-XL P501-Single Sink, Faucet (F405 change from Chicago 2302-ABCP to Zurn 2824BO-AL h. P503-Double Sink, Faucet (F405 change from Chicago 2302-ABCP to Zurn 2824BO-XL - P520-Mop Sink, Faucet (F407 change from Chicago 40-LD-S97-WXFABCP to Zurn Z843M1 P531-Single Sink Change Fixture from Elkay LRAD-1517 to. Just SL-ADA-1815-A-GR, k. P531-Single Sink, Faucet (F440 change from ChicagoLWSI-AIl-G: to Zurn Z812B4-XL P551-Single Sink, Faucet (F405 change from Chicago 2302-ABCP to Zurn Z824BO-XL m. P551-Single Sink, Bubbler/Push (F415 change from Chicago 748-665ABCP to Zurn Z83600-XL n. P552-Single Sink, Faucet (F417 change from Chicago S0-E35VP3ITAKABCP to Zurn Z825B4-XL 0. WH8.1 & 8.2-Water Heater Change fixture from A.O. Smith BTH 2501 to Rheem GHESU/SS-250 WH1.1 thru 7.1-Water Heater Change fixture from A.O. Smith DEN 40 to Rheem ELD40-TB PB1.1 from VC Systems to Grundfos booster pump Division 23 - HVAC 1. VE23.1 -intentionally omitted 2. VE232-intentionaly omitted 3. VE23.3-A Alternative HVAC equipment: Use Lennox inl lieu ofTrane split systems. 4. VE23.4-Changed ductwork layout and material. The ductwork to be Snaplock round duct in lieu of rectangular and spiral ducts. 15 GMP Value. Alternates Exhibit 1- GMP Book dated 6/28/21 5. VE23.5-intentionaly omitted Division 26 - Electrical 1. VE26.1-I Delete the switch gear study from the Construction Manager's scope of work. 2. VE26.2-1 Delete lightning protection system from the Construction Manager's scope of work. 3. VE26.3 -1 Use MC cable in lieu of conduit for lighting and fire alarm systems. 4. VE: 26.4-1 Utilize different lighting manufacturers. Lighting fixtures to be the same performance and appearance as specified. 5. VE26.5-A Audio Visual System changes: a. PMC crediting labor and material for the audio enhancements in the ESE: rooms. i. PMC crediting the labor and material for the boards themselves. ii. PMC to keep the mounting brackets/install ofbackets, power/data, etc in scope. iii. Interactive boards themselves will be owner furnish/owner installed. b. Interactive boards 6. VE26.6-Access Control Changes: a. PMC toj provide smarts and parts, but only in two locations: interior lobby door and pair b. PMC crediting all the rest of the labor, equipment, conduit, cable, etc for all other ofexterior doors leading to Covered Play. locations shown on the drawings. 7. VE26.8-CCTV Changes: 1. Exterior cameras a. PMC crediting all camera (and equipment) materials. The quantity of cameras matches b. PMC tol keep the exterior camera installation in PMC's scope. For clarity, the cameras and equipment for exterior cameras are owner furnish/contractor install. a. Locations remain the same with one exception: add a camera to the Covered Play area. Interior cameras (and equipment) are to be owner furnish/owner installed. d. PMC tol keep cabling (coiled at camera locations), conduit, etc. for the owner to install cameras themselves in the locations shown (plus covered play). the same locations as shown on the plans. 2. Interior cameras b. PMC crediting all labor and material fori interior cameras. 8. VE 26.9- Remove plug controllers from the electrical system. Design team to receive a variance from the AHJ to allow this. 16 GMP Value. Alternates Exhibit 1- GMP Book dated 6/28/21 Division 31 - Earthwork 1. VE31.I-intentionaly omitted Division 32 - Exterior improvements 1. VE32.1 - Grass seeding (bahia) in lieu ofs sod throughout the site, with these exceptions: between the main parking lot and front of the school and locations needed to erosion control (ie. pond banks). Other 1. VE40.1-BCSD is tax exempt, SO this VEi is placing the anticipated tax savings for the project's 2. VE40.2-1 BCSD is tax exempt, sO this VE is placing the anticipated tax savings for the project's materials back into the project tol lower the GMP. This amount is aboye-and-beyond the standard goal for owner direct purchase savings as a good-faith measure to get the project in budget. 3. VE4 40.3- The Construction Manager's Contingency has been lowered in effort to get the project in materials back into the project tol lower the GMP. budget. 17 Exhibit 1- GMP Book dated 6/28/21 m Perry-McCall CONSTRUCTION,INC: GMP DOCUMENTLOG Number Name ADDENDA Issue Date Issue Description 01/08/2021 ADDENDUM NO.01 01/08/2021 ADDENDUM NO.01 01/15/2021 ADDENDUM NO.02 01/14/2021 ADDENDUM: NO.02 01/22/2021 ADDENDUM NO.03 01/22/2021 ADDENDUM NO.03 05/07/2021 ADDENDUM NO.04 05/07/2021 ADDENDUM: NO.04 12/16/2020 100%CD'S 05/07/2021 ADDENDUM #4 12/16/2020 100%CD'S 01/15/2021 ADDENDUM: #2 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD's 01/15/2021 ADDENDUM: #2 05/07/2021 ADDENDUM #4 05/07/2021 ADDENDUM: #4 05/07/2021 ADDENDUM #4 05/07/2021 ADDENDUM #4 05/07/2021 ADDENDUM #4 05/07/2021 ADDENDUM: #4 05/07/2021 ADDENDUM #4 05/07/2021 ADDENDUM: #4 05/07/2021 ADDENDUM #4 01/15/2021 ADDENDUM #2 12/16/2020 100% CD'S 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM #2 ADDENDUM NO. 01 NARRATIVE- CRA. ARCHITECTS ADDENDUM: NO.01 NARRATIVE- H2 ENGINEERING ADDENDUM NO. 02 NARRATIVE - CRA ARCHITECTS ADDENDUM NO. 02 NARRATIVE-H H2 ENGINEERING ADDENDUM NO. 03 NARRATIVE- CRA ARCHITECTS ADDENDUM: NO. 03 NARRATIVE- H2 ENGINEERING ADDENDUM NO. 04 NARRATIVE- CRA ARCHITECTS ADDENDUM: NO. 04 NARRATIVE: - H2 ENGINEERING COVER SHEET ANDI INDEX OF DRAWINGS DRAWINGS T-1 CIVIL C001 C101 C201 C202 C301 C302 C401 C402 C403 C404 C405 C406 C407 C408 C409 C410 C411 C501 C502 C503 C504 INDEX PAGE EXISTING CONDITIONS EROSION CONTROL PLAN EROSION CONTROL DETAILS SODDING MAP WETLAND IMPACT MAP OVERALL SITE PLAN TURN LANE SITE PLAN MIAGEDAVRHANERAN: DELETED TURN LANE CROSS SECTIONS TURN LANE CROSS SECTIONS TURN LANE SIGNAGE AND: STRIPING PLAN ENLARGED ENTRY ROADWAY PLAN ENLARGED ENTRY ROADWAY PLAN OVERALL CAMPUS PLAN ENLARGED SITE PLAN ENLARGED SITE PLAN OVERALL GRADING PLAN ENLARGED CAMPUS GRADING PLAN ENLARGED GRADING PLAN ENLARGED GRADING PLAN 18 Exhibit1. - GMP Book dated 6/28/21 The School Board of Baker County, Florida - New Baker County Elementary School GMP Document. Log Number C505 C506 C507 C601 C602 C603 C604 C701 C702 G703 C801 C802 C901 C902 ARCHITECTURAL AS1.0 LS1,0 LS1.1 LS1.2 LS1.3 LS1.4 LS1.5 LS1.6 A1.0 A1.0A A1.1 A1.2 A1.3 A1.4 A1.5 A1.6 A2.1 A2,2 A2.3 A2,4 A3.1 A3.2 A3.3 A4.0. A4.1 A4.2 A4.3 A4.4: A5.1 Name ADAI RAMP DETAILS SWMF PLAN: AND PROFILE SWMF PLAN AND PROFILE DRAINAGEPLAN: DRAINAGE PLAN BLDG DOWINSROUT: PLAN BLDG DOWNSPOUT PLAN OVERALLUTILTY PLAN CAMPUS UTILITY PLAN ENLARGED,UTILTA PLAN TYPICAL SITE DETAILS TYPICAL STORM DETALLS TYPICAL UTILITY DETAILS PUMP STATION: DETAILS ARCHITECTURAL SITE PLAN LIFE SAFETY PLAN: ADMIN/MEDIA LIFE SAFETY PLAN LIFE SAFETK PLAN/CLASSROOMI WING 384 LIFE SAFETY PLAN CLASSROOM WING3&5 LIFE SAFETY PLAN GLASSROOM: WING6 LIFE SAFETY PLAN CLASSROOM WING7 ALIFE SAFETY PLAN CAFEVERIA: CAMPUS PLAN SITEDETAILS ADMIN & MEDIA FLOOR PLANS CEASSROOM, WING 3 &4 & COVERED: PLAY CLASSROOM WINGS3&5 GLASSROOM: WING6 CLASSROOM WING7 CAFETERIA! FLOOR PLAN' ADMIN, MEDIA & CAFETERIA ELEVATIONS MEDIA/ESE WING 200, 4008 500ELEVATIONS: WINGS 500, 600 & 700 CAFETERIA WING 800 ELEVATIONS WING 600& 700 ELEVATIONS: BUILDING CROSS SECTIONS BUILDING CROSS SECTIONS: & COVERED: PLAYF FLOOR PLAN. BUILDING CROSS SECTIONS CAFETORIUM BLDG- PLANS SECTIONS ANDDETAILS: WALL PARTITIONS AND DETAILS WALL SECTIONS WALL SECTIONS WALLSECTIONS ENLARGED TOILET PLANS Issue Date issue Description 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM#2) 01/15/2021 ADDENDUM#2 12/16/2020 100%CD's 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM#2 01/15/2021 ADDENDUM# #2 05/07/2021 ADDENDUM: #4 05/07/2021 ADDENDUM: #4 05/07/2021 ADDENDUM: #4 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 05/07/2021 ADDENDUM#49 01/15/2021 ADDENDUM#2 01/22/2021 ADDENDUM#3 12/16/2020 100% CD's 12/16/2020 100%CD'S 01/22/2021 ADDENDUM: #3 12/16/20203 100%CD'S 01/22/2021 ADDENDUM #3 01/22/2021 ADDENDUM: #3 01/08/2021 ADDENDUM #1 12/16/2020 100%-CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S: 12/16/2020 100%-CD's 01/15/2021 ADDENDUM#2 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD's 12/16/2020, 100% CD'S 01/22/2021 ADDENDUM: #3 12/16/2020 100%. CD'S: 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100% CD'S 19 Exhibit 1. - GMP Book dated 6/28/21 The School Board of Baker County, Florida - New! Baker County Elementary School GMPDocument. Log Number A6.1 A6.2 A6.3 A6.4 A6.5 A7.1 A7.2 A8.1 A8.2 A8.3 A8.4) A8.5 A8.6 A8.7 A9,1 A9.2 A9.3 A10.1 A10.1A A10.2 A10.2A, A10.3 A10,3A A10.4 A10.4A A10.5 A10.5A A10.6 A10,6A A11.1 A11,2 A11.3 A11.4 A11.5 A11,6 STRUCTURAL S0.1 S0.2 SO.3 $0.4 $0.5 S1.1 $1.2 Name MILLWORK: ELEVATIONS MILLWORK DETAILS INTERIOR: ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS WINDOW ANDI DOORI ELEVATIONS WINDOW AND DOOR DETAILS ADMIN & MEDIA REFLECTED CEILING PLANS CLASSROOM: WING3 &-4REFLECTED CEILING PLANS CLASSROOM WING 3&5R REFLECTED CEILING PLANS CEASSROOM: WING 6 REFLECTEDI CEILING PLANS CLASSROOM WING 7 REFLECTED CEILING PLANS CAFETERIA REFLECTED CEILING PLANS CEILING FRAMING DETAILS ROOF PLAN MEZZANINE PLAN ROOF DETAILS ADMIN & MEDIA- FINISH PLAN ADMIN & MEDIAS FLOOR PATTERN PLANS CLASSROOM WING3&4 4-1 FINISH PLAN CLASSROOM WINGS3 &4-FLOORF PATTERN PLAN CLASSROOM WING 4- FINISH PLAN CLASSROOM: WING 3&5 54F FLOOR PATFERN PLAN CLASSROOM WING 61 FINISH PLAN CLASSROOM WING 6FLOOR PATTERN PLAN CLASSROOM WING 7FINISH PLAN GLASSROOM: WING 7FLOOR PATTERN PLAN CAFETERIA- FINISH PLAN GAFETERIA FLOOR PATTERN PLAN: ADMIN & MEDIA FURNITURE & EQUIPMENT PLANS CLASSROOM: WING3&48 & COVERED! PLAY FURNITURE & EQUIPMENT: PLANS CLASSROOM WING385FURNTURE & EQUIPMENT PLANS CLASSROOM WING 6 FURNITURE & EQUIPMENT PLANS CLASSROOM WING 7 FURNITURE & EQUIPMENT PLANS CAFETERIA FLOOR PLAN FURNITURE: ANDI EQUIPMENT PLANS Issue Date Issue Description 12/16/2020: 100%-CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100% CD'sS 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100%. CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 01/08/2021 ADDENDUM #1 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100% CD's 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100% GD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%: CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM#2 12/16/2020 100% CD's 12/16/2020 100%, CD'S 12/16/2020 100% CD'S GENERAL STRUCTURAL NOTES DETAILS SECTIONS SECTIONS; SECTIONS ADMINISTRATION: FOUNDATION. PLAN: ADMINISTRATION LOWI ROOF & MEZZANINE FRAMING PLAN 20 Exhibit 1- GMP Book dated 6/28/21 The School Board of Baker County, Florida - New Baker County Elementary School GMPDocument. Log Number $13 $2.1 $2.2 S2.3 S31 S3.2 $4.1 $4.2 $5.13 $5.2 56:1 $6.2 S7.1 $7.2 MECHANICAL MO.1 MO.2 MO.3 M1.1 M1.2 M1.3 M1.4 M1.5 M1.6 M1.7 M2.1 M5.1 M5.2 CONTROLS ICO.1 IC1.1 IC1.2 IC1.3 IC1.4 1C1.5 IC1.6 IC2.1 IC2.2 PLUMBING PO.1 P1.0 P1.1 Name Issue Date Issue Description 12/16/2020 100%G CD'S 12/16/2020 100%C CD's 12/16/2020. 100%-CD'S 12/16/2020 100% CD's 12/16/2020 100% GD'S 01/15/2021 ADDENDUM #2 12/16/2020 100% CD'S 01/15/2021 ADDENDUM #2 12/16/2020 100% CD'S 01/15/2021 ADDENDUM: #2 12/16/2020 100%CD's 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM# #2 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%-CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD's 12/16/2020 -100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 01/08/2021 ADDENDUM, #1: 12/16/2020 100% CD's 01/15/2021 ADDENDUM #2 12/16/2020 100% CD'S 01/08/2021 ADDENDUM: #1 ADMINISTRATION: ROOF FRAMINGPLAN: MEDIA/ESE FOUNDATION. PLAN MEDINFESEIOWROOFRI MEZZANINEFRAMING PLAN MEDIA/ESE ROOF FRAMING PLAN GLASSROOM, WINGS 300 & 400.FOUNDATION, PLAN CLASSROOM WINGS 300 & 400 ROOF FRAMING PLAN CLASSROOM WINGS3 300 &5 500F FOUNDATION: PLAN CLASSROOM WINGS 300 & 500 ROOF FRAMING PLAN GLASSROOM: WING6 600 FOUNDATION: PLAN CLASSROOM WING 600 ROOF FRAMING PLAN CLASSROOM: WING700 FOUNDATION: PLAN CLASSROOM WING 700 ROOF FRAMING PLAN CAFETENA/CUSTODALFOUNDATONPLAN. CAFEIENA/CUSIODAL ROOF FRAMING PLAN GENERAL NOTES; LEGEND AND SCHEDULES HVAC ADMINISTRATION ANDI MEDIAI FLOOR PLANS -HVAC CLASSROOM FLOOR PLAN: WING38-4-HVAC: CLASSROOM FLOOR PLAN- WING5- HVAC CLASSROOM: FLOOR PLANA WING 6 HVAG CLASSROOM FLOOR PLAN- WING G7-HVAC CAFETERIA: FLOOR PLAN-HVAC ENLARGED CAFETERIA FLOOR PLAN- HVAC SECTIONS HVAC DETAILS- HVAC DETAILS-HVAC: SCHEDULES- HVAC SCHEDULESHVAC: ADDENDUM: #1 ADDENDUM: #1 ADDENDUM #1 GENERAL NOTES, LEGEND AND DETAILS-CONTROLS ADMINISTRATION: ANDI MEDIAFLOOR: PLANE CONTROLS! CLASSROOM FLOOR PLAN- WING3&4- CONTROLS CLASSROOM, FLOOR PLAN- WING5 CONTROLS CLASSROOM: FLOOR PLAN- WINGE 6- CONTROLS CLASSROOM FLOOR PLAN WING7- CONTROLS CAFETERIA FLOOR PLAN CONTROLS CONTROLS HVAC CONTROLS- HVAC GENERAL NOTES, LEGENDS AND: SCHEDULES PLUMBING ADMINISTRATION: ANDI MEDIA FLOOR PLANS-PLUMBING, CAMPUS PLAN- PLUMBING 21 Exhibit1-G GMP Book dated 6/28/21 The School Board of Baker County, Florida - New Baker County Elementary School GMPDocument. Log Number P1.2 P1.3 P1.4 P1:5 P1.6 P3.1 P3.2 P3,3 P5.1 P6.1 P6.2 P6.3 P6.4 FIRE PROTECTION FO,1 F1.0 F11 F1.2 F1.3 F1.4 F1,5, F1.6 F5.17 FOOD: SERVICE FS1.1 FS1.2 FS1.3 FS1.4 FS1.5 ELECTRICAL E0.1 E1.0. E1.1 E1.2 E1.3 E1.4 E1.5 E1.6 E1.7 E1.8 E2.1 E2,2 Name Issue Date Issue Description 01/08/2021 ADDENDUM#1 01/15/2021 ADDENDUM #2 12/16/2020 100%CD'S 01/08/2021 ADDENDUM: #1 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM #2 01/15/2021 ADDENDUM #2 01/08/2021 ADDENDUM#1 12/16/2020 100% CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020, 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD's 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 01/08/2021 ADDENDUM #1 12/16/2020) 100% CD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 01/08/2021 ADDENDUM #1 01/22/2021 ADDENDUMI #3 05/07/2021 ADDENDUM: #4 01/22/2021 ADDENDUM#3 12/16/2020 100% CD'S 12/16/2020 100% CD's 12/16/2020 100% CD'S 12/16/2020 100% CD's 01/22/2021 ADDENDUM: #3 01/22/2021 ADDENDUM#3 01/22/2021 ADDENDUM#3 01/22/2021 ADDENDUM: #3 01/22/2021 ADDENDUM: #3 CLASSROOM FLOOR PLAN- - WING 4-1 PLUMBING CLASSROOM: FLOOR PLAN-WING 55 PLUMBING: CLASSROOM FLOOR PLAN- WING 6-P PLUMBING CLASSROOM: FLOOR PLANA WING7-P PLUMBING CAFETERIA FLOOR PLAN -PLUMBING ENLARGED FLOOR PLANS PLUMBING ENLARGED FLOORE PLANS -PLUMBING ENLARGED: FLOORF PLANS -PLUMBING DETAILS- PLUMBING ISOMETRICS PLUMBING: ISOMETRICS- PLUMBING ISOMETRICS; - PLUMBING: ISOMETRICS- PLUMBING GENERALI NOTES, LEGEND: AND SCHEDULES FIRE PROTECTION: ADMINISTRATION: ANDMEDAFIOORPANS: FIRE PROTECTION CLASSROOM FLOORI PLAN -WING 4- FIRE PROTECTION CLASSROOM: FLOOR PLAN WING 6- FIRE PROTECTION: CLASSROOM FLOOR PLAN -WING 6- FIRE PROTECTION CLASSROOM: FLOOR PLAN WING7-FIREI PROTECTION: CAFETERIA FLOOR PLAN FIRE PROTECTION DETAILS FIRE PROTECTION: ENLARGED KITCHEN PLAN DETAILS DETAILS DETAILS DETAILS CAMPUS PLAN- FIRE PROTECTION GENERAL: NOTES LEGEND: AND: SCHEDULE: SITE PLAN- ELECTRICAL ADMINISTRATION, AND MEDIA FLOOR PLANS LIGHTING CLASSROOM FLOOR PLAN- WING 4- LIGHTING CLASSROOM: FLOORI PLAN 5 WING5-L LIGHTING CLASSROOM FLOORI PLAN- WING 6- LIGHTING CLASSROOM: FLOOR PLAN WING7 LIGHTING: CAFETERIA FLOOR PLAN -LIGHTING MEZZANINEFLOOR, PLAN ELECTRICAL MEZZANINE FLOOR PLAN EQUIPMENT ADMINISTRATION: AND. MEDIA FLOOR PLANS POWER CLASSROOM FLOOR. PLAN- WING 4- POWER 22 Exhibit1 - GMP Book dated 6/28/21 The School Board ofl Baker County, Florida -] New Baker County Elementary School GMPDocument. Log Number E2.3 E2.4 E2.5 E2.6 E2.7 E3.1 E4.1 E4.2 E4.3 E4.4 E4.5) E4.6 E5.1 E5.2 TELECOM TO.1 T1.1 T12 T1.3 T1.4 T1.5 T16 T1.7 T2.1 T2.2 SECURITY SE0.1 SE0.2 SE1.0 SE1.1 SE1.2 SE1.3 SE1.4 SE1.5 SE1.6 SE2.0 AUDIOVISUAL AVO.1 AV1.1 AV1.2 AV1,3 Name Issue Date Issue Description 01/22/2021 ADDENDUM#3: 01/22/2021 ADDENDUM #3 01/22/2021 ADDENDUM; #3 01/22/2021 ADDENDUM #3 01/08/2021 ADDENDUM#1 12/16/2020 100% CD's 01/15/2021 ADDENDUM: #2 01/15/2021 ADDENDUM #2 01/08/2021 ADDENDUM# #1 05/07/2021 ADDENDUM #4 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020) 100%.C CD'S 12/16/2020 100%CD'S CLASSROOM FLOORI PLAN FWING5E POWER CLASSROOM FLOOR PLAN-WING 6- POWER CLASSROOMFLOOR: PLAN WING7-POWER: CAFETERIA FLOOR PLAN-POWER ENLARGEDI KITCHEN PLAN POWER CAMPUSI PLAN- LIGHTNING PROTECTION ONE-LINE DIAGRAM PANEL SCHEDULES ELECTRICAL PANEL SCHEDULES ELECTRICAL PANEL SCHEDULES- ELECTRICAL GROUNDING DIAGRAM- ELECTRICAL FIRE ALARM RISER DIAGRAM DETAILS ELECTRICAL DETAILS ELECTRICAL GENERALNOTES: LEGEND; AND DETAILS FLECOMMUNICATONS 01/08/2021 ADDENDUM# #1 ADMINISTRATION. ANDI MEDIA FLOORI PLANS- TELECOMMUNICATIONS CLASSROOM: FLOOR PLAN-WING TELECOMMUNEATIONS CLASSROOM FLOOR PLAN -WING! 5 TELECOMMUNICATIONS CLASSROOM, FLOOR PLAN-WING EATRLECOMMUNCATIONS CLASSROOM FLOOR PLAN WING7-TELECOMMUNICATIONS CAFETERIA FLOORF PLAN TLECOMMUNICATIONS EMERGENCY RESPONDER 2-WAY RADIO DETAILS GENERAL NOTES, LEGEND, AND RISER DIAGRAM: SECURITY DOOR SECURITY DEVICE ROUGH-IN DETAILS ADMINISTRATION. ANDI MEDIA- SECURITY CLASSROOM; FLOOR PLAN WING 4- SECURITY: CLASSROOM FLOOR PLAN- WING5- SECURITY CLASSROOM; FLOOR PLAN WING, 6-SECURITY CLASSROOM FLOOR PLAN WING 7- SECURITY CAFETERIA FLOOR PLANE SECURITY DETAILS- SECURITY 01/08/2021 ADDENDUM #1 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/15/2020 100%CD'S 01/08/2021 ADDENDUM #1 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020: 100%CD's 12/16/2020 100%CD'S 12/16/2020; 100%CD's 01/08/2021 ADDENDUM #1 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S ENLARGED COMM ROOM FLOOR PLANS-TELECOMMUNICATIONS 12/16/2020 100% CD'S RISER DIAGRAM: AND RACK ELEVATIONS TRLECOMMUNICATIONS 12/16/2020 100%-CD's, SITE PLAN FSECURITY: GENERAL NOTES, CEGEND, AND DETAILS AUDIO-VIDEO ADMINISTRATION: ANDI MEDIA FLOOR PLANS AUDIO-VIDEO CLASSROOMI FLOOR PLAN WING 4-AUDIO-VDEO CLASSROOM FLOOR PLAN- - WING. 5- AUDIO-VIDEO 23 Exhibit1. -GMP Book dated 6/28/21 The School Board of Baker County, Florida -] New Baker County Elementary School GMP Document. Log Number AV1.41 AV1.5 AV1.6 Name Issue Date Issue Description 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S CLASSROOM: FLOOR PLAN WING 6-4 AUDIO-VIDEO CLASSROOM FLOOR PLAN- -WING7- AUDIO-VIDEO CAFETERIAFLOOR: PLAN AUDIO-VIDEO PROECISPECFCATONS VOL. 1&2 GENERAL REQUIREMENTS SUMMARY OFA WORK ALLOWANCES THRESHOLDI INSPECTION: PLAN ALTERNATES SUBSTITUTIONS PROCEDURES PAYMENT PROCEDURES PROJECT COORDINATION: PROJECT MEETINGS SUBMITTALS QUALITY REQUIREMENTS DEFINITIONS ANDS STANDARDS TEMPORARY FACILITIES MATERIALS ANDI EQUIPMENT CLOSEOUT PROCEDURES WARRANTIES: AND. BONDS SUSTAINABLE DESIGN REQUIREMENTS EXISTING CONDITIONS DEMOLITION: CONCRETE DIVISION 01 011000 012100. 012150 012300 012500 012900 013100 013200 0133.00 014000 0142,00 015000 015500 017700 0178.00 018113 DIVISIONO 02 020205 023000 DIVISION03 030320 030341 033000 DIVISION 04 042000 042113 DIVISIONOS 051200 12/16/2020 100%C CD'S 12/16/2020 100% CD's 12/16/2020 100%CD's 01/22/2021 ADDENDUM #3 12/16/2020: 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%0 CD'S 12/16/2020 100%G CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100% CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020 100%CD's GEOTECHNICAL DATA (W/ ATTACHED REPORTS) CONCRETE WORK- GENERAL (CIVIL), PRECAST CONCRETE. STRUCTURES BUILDING CONCRETE WORK MASONRY UNIT MASONRY BRICK MASONRY: METALS STRUCTURALSTEEL 24 Exhibit1-G GMP Book dated 6/28/21 The School Board of Baker County, Florida - New Baker County Elementary School GMPDocumentLog Number 0521.00 055300 054000 055000 055116 DIVISION06 061000 06:4000 064023 066510 DIMISION0Y 071113 071326 072100 0741:13 076200 078100 079200 079500 DIVISION 08 080500 081 1113 081416 083113 083333 084 41.00 085113 087100 088000 DIVISION 09 092900 093000 095100 096500 Name STEELJOIST METAL DECKING COLD FORMED: METAL FRAMING METALI FABRICATIONS FIXED ALUMINUM: INDUSTRIALSTAIR: WOOD/PLASTICS) AND COMPOSITES ROUGH CARPENTRY PLASTIGI LAMINATE: CLAD FIXED. CABINETS SOUDSURACEFABRCATONS MOISTURE PROTECTION: BITUMINOUS DAMPROOFING SHEET MEMBRANE WATERPROOFING, BUILDING INSULATION PREFORMED WALLAND,ROOE PANELS FLASHING & SHEETMETAL FIRESTOPPING JOINT: SEALANTS EXPANSION: CONTROL: OPENINGS DOOR SCHEDULE HOLLOW: METALDOOR: AND FRAMES FLUSH WOOD DOORS ACCESS, DOORS AND FRAMES OVERHEAD DOORS ALUMINUM: ENTRANCES; ANDS STOREFRONTS ALUMINUM WINDOWS DOOR HARDWARE. GLASS AND GLAZING FINISHES GYPSUM: DRYWALL, TILE ACOUSTIÇAL CEILINGS RESILIENT TILE FLOORING Issue Date Issue Description 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020 100%CD'S 01/08/2021 ADDENDUME #1 12/16/2020 100%CD's 12/16/2020; 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020: 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%0 CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%C CD'S 12/16/2020 100% CD'S DECORATIVE PLASTIC LAMINATE PILASTERS ANDI WALL TREATMENTS 12/16/2020 100%CD's 25 Exhibit1. - GMP Book dated 6/28/21 The School Board of Baker County, Florida - New Baker County Elementary School GMPDocument Log Number 096513 096533 096700 096816 097100 099100 DIVISION 10 101000 101600 102600 102800 104416 105050 105310 109900 DIVISION 11 111320 114000 116143 DIVISION:13 130650 130651 130652 DIMISION21 210100 210517 210518 210523 210529 210553 211100 211119 211313 211316 Name Issue Date Issue Description 12/16/2020: 100%CD's 12/16/2020 100%0 CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020: 100%CD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD'S 01/22/2021 ADDENDUM #3 12/16/2020: 100%.CD'S 01/08/2021 ADDENDUM #1 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020; 100%CD's; 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020; 100% CD's 12/16/2020 100%CD's 12/16/2020. 100% CD's 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S RESIENTWWALDBASE: AND STAIR TREADS ELECTRO STATIC DISCHARGE VINYLTILE SPECIAL COATING FOR CONCRETE CARPETING ACOUSTICAL WALL PANELS PAINTING SPECIALTIES TOILET PARTITIONS CORNER GUARDS TOILET AND BATH. ACCESSORIES FIRE EXTINGUISHERS, CABINETS: AND ACCESSORIES HEAVY DUTYSTEEL LOCKERS ALUMINUM: WALWAYCAMOPSSTEMA MISCELLANEOUS: SPECIALTIES EQUIPMENT PROJECTION: SCREEN FOOD: SERVICE STAGE CURTAINS: MARKERBOARDS TACKBOARDS: ANDI DISPLAY RAILS SPECIAL CONSTRUCTON-N/A: BULLET RESISTANT WOOD DOOR & FRAME ASSEMBLY BULLET RESISTANTACRYLIC: GLAZING RECESSED DEAL" TRAY WITH BULLETT TRAP GENERAL PROVISIONS FOR FIRE SUPPRESSION: SLEEVES ANDS SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING ESÇUTCHEONS FOR FIRESUPPRESSION: PIPING GENERAL-DUIYVAIVES FOR FIRE PROTECTION PIPING HANGERS AND'S SUPPORTS! FOR FIRE SUPPRESSION: PIPING AND IDENTIFICATION FOR FIRE-SUPPRESSION PIPING ANDI EQUIPMENT FACILITY) FIRESUPPRESSION: WATER-SERVICE: PIPING FIRE DEPARTMENT CONNECTIONS WET-PIPE SPRINKLER: SYSTEMS DRY-PIPE SPRINKLER SYSTEMS FIRE SUPPRESSION EQUIPMENT: 26 Exhibit1-GMP Book dated 6/28/21 The School Board of] Baker County, Florida - New Baker County Elementary School GMPDocument. Log Number DIVISION 22 220100 220513 220516 220517 220518 220519 22. 0523,12 220523.13 22 0523.14 220529 220548.13 220553 22:05.93 220719.12 22 0719.14 220719.15 221101 221116 221119 221123 2211:23.13 221126 221316, 221319 221323 221344 221413 221423 223300 223400 22.4213:13 224213.16 22:42.16.13 224216.16 224223 224716 Name PLUMIBNG Issue Date Issue Description 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%C CD'S 12/16/2020 100%CD's 12/16/2020: 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 1009CD'S 12/16/2020 100%CD'S 05/07/2021 ADPENDUME #4 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%0 CD'S 12/16/2020 100%-CD'S 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%0 CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%C CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%C CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD's GENERAL PROVISIONS: FOR PLUMBING; COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT EXPANSIONFTTINGS AND LOOPS FOR PLUMBING PIPING SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING ESCUTCHEONS FORF PLUMBING, PIPING METERS AND GAGES FORI PLUMBING PIPING BALLVALVES FOR) PLUMBING: PIPING BUTTERFLY VALVES FORI PLUMBING PIPING CHECK VALVES FOR: PLUMBING! PIPING HANGERS AND: SUPPORTS FOR PLUMBING PIPING ANDI EQUIPMENT 12/16/2020 100%CD'S VIBRATION CONTROLSI FOR PLUMBING PIPING, AND EQUIPMENT IDENTIFICATION FOR PLUMBING PIPING. AND EQUIPMENT TESTING, ADJUSTING AND BALANCING FOR PLUMBING INSULATION FOR DOMESTIC HOT-WATER PIPING INSULATION FOR SANITARY PIPING AND DRAINS INSULATION FOR ADAI PLUMBING FIXTURES HORZONFALDIRECROMAEPRILANG, DELETED DOMESTIC WATER PIPING DOMESTIC WATER PIPING SPECIALTIES DOMESTIC WATER PUMPS DOMESTIC-WATER: PACKAGED BOOSTER PUMPS FACILITY IQUEFED-PETROLEUMA GAS PIPING SANTARYWASTEAND: VENT PIPING SANITARY WASTE PIPING. SPECIALTIES SANITARY WASTE INTERCEPTORS: SEWAGE LIFT STATION' WITH: SUBMERSIBLE PUMPS FACILITYSTORM DRAINAGE: PIPING STORM DRAINAGE PIPING SPECIALTIES ELECTRIC, DOMESTIC-WATERI HEATERS FUEL-FIRED, DOMESTIC-WATER HEATERS COMMERCIAL WATERCLOSETS: COMMERCIAL URINALS COMMERCALLAVATORES COMMERCIAL SINKS COMMERCIAL: SHOWERS PRESSURE WATER COOLERS 27 Exhibit1 1-G GMP Book dated 6/28/21 The School Board of] Baker County, Florida - New Baker County Elementary School GMPDocument, Log Number DIVISION 23 230100 230513 230517 230518 23 0529 23054 48.13 230553 230593 230713.11 230713.13 23071 19.11 230719.16 2323.00 232923 233113.11 233113.12 23:31:13.13 233300 233346 23341 16.11 233416.14 233423.12 233423.13 233433.13 2337 13.13 233713.23 2337.23 233900 234100 236200 237313.16 238126.11 238126.12: 238166 23:8216.14: Name Issue Date Issue Description 12/16/2020: 100%. CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%0 CD'S 12/16/2020: 100%CD'S: 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%0 CD'S 12/16/2020: 100%CD'S 12/16/2020 100%0 CD'S 12/16/2020 100% CD's 12/16/2020 100%0 CD's 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020 100%, CD's 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100% CD's 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S: HEATING, VENTILATION & AIR CONDITIONING (HVAC) GENERAL PROVISION FOR HVAC: COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT SLEEVES AND SLEEVE SEALSFOR AVAC PIPING ESCUTCHEONS FOR HVACI PIPING HANGERS AND: SUPPORTS FOR HVAC PIPING ANDI EQUIPMENT VIBRATION CONTROLS FOR HVAC DENTIFICATION: FORI HVACN PIPING AND EQUIPMENT TESTING, ADJUSTING ANDI BALANCING FOR HVAC INSULATION: FOR INDOOR GENERAL HVAC DUCTS INSULATION FOR COMMERCIAL KITCHEN EXHAUST DUCTS INSULATION: FOR CONDENSATE: DRAIN PIPING INSULATION FORI REFRIGERANT PIPING REFRIGERANT PIPING VARABLE-FREQUENCY MOTOR CONTROLLERS METAL DUCTS FOR GENERAL. HVAC METAL DUCTS FOR COMMERCIAL KITCHEN EXHAUST METAL DUCTS FORL LABORATORY EXHAUST AIR DUCT ACCESSORIES FLEXIBLE DUGTS SQUARE IN-LINE CENTRIFUGALF FANS FILTERED SUPPLY CENTRIFUGALFANS CEILING-MOUNTED VENTILATORS CENTRIFUGAL ROOF) VENTILATORS: COMMERCIAL AIR CURTAINS AIR DIEFUSERS: REGISTERS AND GRILLES HVAC GRAVITY VENTILATORS. LOUVERS ANDI VENTS PARTICULATE AIR: FILTRATION PACKAGED COMPRESSOR, AND CONDENSER UNITS INDOOR, SEMI-CUSTOM; AIR-HANDUINGI UNITS AIR-COOLED, SPLIT-SYSTEM, AIR-CONDITIONERS: (5 TONS AND AIR-COOLED, SPLIF-SYSTEM; AIR-CONDITIONERS, (6,TONS AND VARIABLE REFRIGERANT VOLUME SYSTEMS ELECTRIC RESISTANCE AIR ÇOILS SMALLER) LARGER) 28 Exhibit1. - GMP Book dated 6/28/21 The School Board of Baker County, Florida - New Baker County Elementary School GMPDocument. Log Number DIVISION 25 250100 250528 250529 250910 250 09: 23.12 250923.13 25 0923.14 250923.16 250923.17 25,0923.19 250923.27 DIVISION: 26 260100 260519 2605-23 260526 260529 260533 26.0536 260544 260553 26 05 73.13 26 05 73.16 26 05 73.19 26 09 23 26 09 43.23 26 0953 262213 262 2413 262416 262726 262813 262816 26291 13.03 2632 13.13 Name Issue Date Issue Description 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020: 100%CD'S 12/16/2020 100% CD'S 12/16/2020: 100%, CD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020; 100%. CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100% CD'S 12/16/2020; 100%CD'S 12/16/2020 100%0 CD's 12/16/2020 100% CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 12/16/2020 100%G CD'S 12/16/2020 100% CD's 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%C CD's 12/16/2020 100% CD'S 12/16/2020 100% CD's 12/16/2020 100%C CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD's 12/16/2020. 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S INTEGRATED. AUTOMATION: GENERAL PROVISIONS FOR INSTRUMENTATION. AND CONTROL PATHWAYS: FOR CONTROL SYSTEMS: HANGERS AND: SUPPORTS FOR CONTROL: SYSTEMS INTEGRATION: WITH EXISTING DDCSYSTEM: CONTROL DAMPER ACCESSORIES ENERGY METERS FLOW INSTRUMENTS GAS INSTRUMENTS) LEVEL INSTRUMENTS MOISTURE! INSTRUMENTS: TEMPERATURE INSTRUMENTS ELECTRICAL GENERAL PROVISIONS FOR ELECTRICAL: LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES CONTROL-VOLTAGE ELECTRICAL POWER CABLES GROUNDING AND BONDING FOR ELECTRICAL: SYSTEMS HANGERS: AND SUPPORTS FOR; ELECTRICALSYSTEMS RACEWAYS. ANDI BOXES FORI ELECTRICAL SYSTEMS CABLE TRAYS, FOR ELECTRICAL SYSTEMS SLEEVES AND SLEEVE SEALS FORI ELECTRICAL RACEWAYS AND CABLING IDENTIFICATION: FORE ELECTRICALS SYSTEMS SHORT-CIRCUIT: STUDIES COORDINATIONSTUDIES ARC-FLASH HAZARD ANALYSIS LIGHTING CONTROL DEVICES RELAY-BASED LIGHTING CONTROLS ADDRESSABLE FIRE-ALARM: SYSTEMS LOW-VOLTAGE DISTRIBUTION TRANSFORMERS SWITCHBOARDS PANELBOARDS WIRING DEVICES FUSES ENCLOSED SWITCHES AND CRCUIT BREAKERS: MANUAL AND MAGNETIC MOTOR CONTROLLERS DESELENGINE-DRIVEN GENERATOR: SETS 29 Exhibit1-GMP Book dated 6/28/21 The School Board of Baker County, Florida -1 New Baker County Elementary School GMPDocument. Log Number 263600 264113 264313 265119 265613 265619 DIVISION27 270526 270528 271100 271300 271500 273000 274100 DIVISION 28 280513 280526 281 13.00 282113 282319 DIVISION! 31 310220 310251 310252 313116 DIVISION32 320251 320252 320261 32,02:93 323113 323119 Name TRANSFER SWITCHES CIRCUITS LEDINTERIOR LIGHTING; LIGHTING POLES AND STANDARDS LEDEXTERIOR, LIGHTING! COMMUNICATIONS Issue Date Issue Description 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%,CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S LIGHTNING PROTECTION FOR STRUCTURES: SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER GROUNDING AND! BONDING FOR COMMUNICATIONS SYSTEMS PATHWAYS FOR COMMUNICATIONS SYSTEMS: COMMUNICATIONS EQUIPMENT ROOM FITTINGS COMMUNICATIONS BACKBONE: CABLING COMMUNICATIONS HORIZONTAL CABLING EMERGENCY COMMUNICATION: SYSTEM AUDIO/MDEOSYSTEMS ELECTRONIC: SAFETY & SECURITY CONDUCTORS AND CABLES FOR ELECTRONICSAFETY, AND SECURITY: 12/16/2020 100%C CD'S GROUNDING ANDI BONDING FOR ELECTRONIC SAFETY AND: SECURITY 12/16/2020 100%0 CD's ACCESS CONTROL IPCAMERAS IPMDEO STORAGE: SERVER EARTHWORK EARTHWORK STABILIZED SUBBASE LIMEROCK BASE COURSE TERMITE: CONTROL EXTERIOR IMPROVEMENTS: CONCRETE CURBS, CURBS AND GUTTERS, AND: SIDEWALKS ASPHALTIC CONRETE: PAVING PAINTING TRAFFICS STRIPES ANDI MARKINGS SODDING, SEEDING AND. MULCHING: FORS SITE STABILIZATION: CHAIN LINK FENCES AND GATES DECORATIVE; METALFENCES: AND GATE 12/16/2020 100%G GD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD's 12/16/2020: 100%CD's 12/16/2020 100%CD's 12/16/2020 100%. CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 12/16/2020 100%CD's 12/16/2020 100%-CD'S 12/16/2020 100% CD'S 12/16/2020 100% CD'S 30 Exhibit1-C GMP Book dated 6/28/21 The School Board of] Baker County, Florida - New Baker County Elementary School GMPDocument. Log Number DIVISION! 33 33 0266 330273 330275 330293 330341 330507 Name UTILITIES WATER: DISTRIBUTION: SYSTEMS SANITARY SEWERS Issue Date Issue Description 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100%CD'S 12/16/2020 100% CD'S 05/07/2021 ADDENDUM #4 STORM DRAINAGE GULVERTS ANDSTRUCTURES: STORM WATER POLLUTION PREVENTION PLAN (SWPPP) PREGAST ÇONCRETE: STORM) DRAINAGE: STRUCTURES HORIZONTAL DIRECTIONAL DRILLING 31 8 6 3 m DE 4 dbg 4 68 C d8 9 4 B853S833